RFP Catalog/Utilities

Utilities RFPs

Find utilities RFP opportunities from public utility districts, municipal utilities, and utility commissions. Search solicitations for utility infrastructure, utility services, and utility management systems updated daily.

City of Grand Junction

The solicitation requests contractors to furnish all labor, materials, equipment, and incidentals to construct a new 69 kV electrical substation, including site preparation and foundations. The project involves the procurement and installation of electrical equipment to deliver a fully operational substation for Grand Junction Municipal Utilities. Proposers must obtain the official bid package and submission instructions through the QuestCDN portal to submit their offers.

Posted Date

May 18, 2026

Due Date

Jun 11, 2026

Timeline Progress57%
Ucla School Of Law

Work consists of furnish and install all underground site utilities.

Posted Date

May 15, 2026

Due Date

Jun 9, 2026

Timeline Progress67%
Gulf Shores Utilities

The project includes the following work: construction of a new water treatment facility on an existing water treatment plant, associated process equipment, piping, concrete work, electrical work, instrumentation and controls, and civil/site work.

Posted Date

May 29, 2026

Due Date

Jul 30, 2026

Timeline Progress4%
California Public Utilities Commission (CPUC)

This is an Invitation for Bid (IFB) for specialized energy industry and public utilities-related training services to be provided to California Public Utilities Commission (CPUC) staff. The solicitation is posted on Cal eProcure with a non-mandatory pre-bid conference and lists Michelle Thibeaux-Smith as the contact for questions. The response deadline is June 4, 2026, and the event was officially posted on May 1, 2026.

Posted Date

May 1, 2026

Due Date

Jun 4, 2026

Timeline Progress90%
Detroit Lakes Airport

Construction of a new diesel-fired turbine site. The work includes the installation of owner-furnished and contractor-furnished materials, including, but not limited to setting of equipment, concrete footings, foundations and flatwork, structural steel, a fire detection and suppression system, Carbon Dioxide tubing, air compressor and dryer, compressed air piping, fuel storage tanks and fuel oil piping, lube oil cooler and lube oil piping, water treatment skid and water piping, ductwork, fencing, conduit and ductbank, manholes, ground grid, power and control cables, AC and DC wiring and related accessories identified within the bidding documents. Installation may occur outdoors, within the turbine enclosure, or within a generator control enclosure.

Posted Date

May 8, 2026

Due Date

Jun 2, 2026

Timeline Progress95%
City of Detroit Lakes

This solicitation requests bids for the construction of a new diesel-fired turbine site as part of the Jet Generation Facility, including concrete foundations, structural steel, and fuel tanks. The project involves the installation of both owner-furnished and contractor-furnished materials along with electrical and control wiring. Bids are being managed by Detroit Lakes Public Utilities with engineering support from DGR Engineering.

Posted Date

May 8, 2026

Due Date

Jun 2, 2026

Timeline Progress95%
City of Biggs

Deliver a fully operational AMI system for both electric and water utilities.

Posted Date

May 23, 2026

Due Date

Jul 1, 2026

Timeline Progress22%
Durham County

Provide a utilities asset management and project management software solution and implementation.

Posted Date

Apr 27, 2026

Due Date

Jun 9, 2026

Timeline Progress81%
Dublin San Ramon Services District

This Special Notice is a Justification & Approval to award Contract W912QR26CA019 for Utilities (WATER) to the Dublin San Ramon Services District, issued by the US Army Corps of Engineers (Louisville District). The notice covers construction-related water utility work (NAICS 236220) with place of performance in Dublin, CA and is set aside for Small Business. The opportunity was posted May 20, 2026 and responses are due June 4, 2026; the SAM.gov record includes an attached J&A PDF.

Posted Date

May 20, 2026

Due Date

Jun 4, 2026

Timeline Progress78%
Town of New Windsor

Construction of splash pad and all improvements general of construction of recreation and incidental to installation including new utilities.

Posted Date

May 15, 2026

Due Date

Jun 23, 2026

Timeline Progress43%
Pittsburgh Water And Sewer Authority

Pittsburgh Water and Sewer Authority is soliciting qualified construction management and construction inspection (CM/CI) firms to provide private construction of public utilities management and inspection services under a task-order indefinite-delivery, indefinite-quantity contract, with task orders generally not to exceed $425,000 each. The contract term begins upon issuance of a Notice to Proceed for one year with up to four one-year extensions; firms must demonstrate relevant experience, financial stability, and required staffing, and the procurement encourages participation by MBE/WBE/SBE/VBE/DOBE/LGBTBE firms. The opportunity is open with questions due 2026-06-10 and proposals due 2026-06-18; required solicitation attachments (RFP PDF and submission instructions) are posted on the buyer portal but require vendor login to download.

Posted Date

May 21, 2026

Due Date

Jun 18, 2026

Timeline Progress38%
Winston-Salem/Forsyth County Schools

Instrumentation & control system services.

Posted Date

May 20, 2026

Due Date

Jun 9, 2026

Timeline Progress59%
Doe Mountain Recreation Authority

Work includes approx. 500 CY of rock removal; 25 EA of water valves and vaults; 1,350 LF of 4" electrical conduit; 100 TN of shot rock fill. See outside link.

Posted Date

May 5, 2026

Due Date

Jun 1, 2026

Timeline Progress99%
City of Clermont

This is a sole-source acquisition for Hach Laboratory Products for Water & Wastewater Utilities. The listed supplier, Hach, has been identified as the exclusive source for these products/services.

Posted Date

Jun 17, 2025

Due Date

Jun 17, 2026

Timeline Progress96%
Kentucky Cabinet for Health and Family Services

The Commonwealth of Kentucky issued this RFB to replace domestic water and fire suppression lines, repair sanitary sewer systems, and improve storm sewer and erosion control at the Oakwood Intermediate Care Facility in Somerset, KY. Bidders must be registered in the Commonwealth Vendor Self Service (VSS) system and submit bids electronically by the June 2026 deadline. A mandatory site visit is scheduled for May 21, 2026, to review the project scope which includes cure-in-place pipe lining and infrastructure repairs.

Posted Date

May 12, 2026

Due Date

Jun 9, 2026

Timeline Progress70%
City of Hinesville

Provide certain city government services, including public utilities administration, street maintenance, parks & grounds maintenance, sanitation, drainage, meter reading, construction maintenance, water production, wastewater treatment, lift station maintenance and repair, inflow and infiltration.

Posted Date

Apr 23, 2026

Due Date

Jul 1, 2026

Timeline Progress56%
Durham County

This RFP from Durham County, North Carolina (RFP No. 26-040) is a solicitation for a vendor to provide a comprehensive utilities asset and project management software solution, along with full implementation services. The county’s Utilities Division is looking for a single, integrated platform that replaces its current mix of manual processes, spreadsheets, paper records, and disconnected systems. The selected vendor will be responsible not just for supplying the software, but also for configuring it, integrating it with existing systems, migrating legacy data, training staff, and providing ongoing support.

Posted Date

Apr 27, 2026

Due Date

Jun 9, 2026

Timeline Progress81%
Porter County Municipal Airport

Construct new asphalt airfield taxiways and rehabilitate existing asphalt pavement surfaces. Work will include, but is not limited to, topsoil stripping, subgrade compaction, placement of aggregate base course, installation of asphalt base and surface courses, installation of underdrains, and application of pavement markings. The project may also include installation of utility services such as water, sanitary sewer, natural gas, and electrical lines.

Posted Date

May 1, 2026

Due Date

Jun 16, 2026

Timeline Progress67%
Denton County Mud 8

Work includes approx 4,773 LF of 8" PVC waterline; 195 EA 1" single water service; 2,851 LF of 8" SDR 26 PVC sewer line; 195 EA 4" sanitary sewer service; 2,624 LF of 8" SDR 26 PVC sewer line; 8 EA 4' manhole.

Posted Date

May 4, 2026

Due Date

Jun 2, 2026

Timeline Progress96%
City of Cape Coral

Work inlcudes utilities extension.

Posted Date

May 19, 2026

Due Date

Jun 23, 2026

Timeline Progress36%

Win More Utilities RFPs

Get AI-powered buying signals and real-time alerts for utilities opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available