Discover opportunities months before the RFP drops
Learn more →Find utilities RFP opportunities from public utility districts, municipal utilities, and utility commissions. Search solicitations for utility infrastructure, utility services, and utility management systems updated daily.
The work shall consist of approx. the demolishing of three (3) blowers and providing three (3) new blowers, demolishing fine bubble diffused aeration systems in three (3) aeration tanks and providing new fine bubble diffused aeration systems in the three (3) aeration tanks, demolishing and providing new dissolved oxygen (D.O.) meters, rehabilitating two (2) existing blowers (Contract Allowance), demolishing two (2) return activated sludge (RAS) pumps and providing two (2) new RAS pumps, demolishing a waste activated sludge (WAS) pump and providing a new WAS pump, providing a new fine screen with washer/compactor, demolishing and providing new coagulant feed lines, concrete repair, demolishing a motor control center and providing a new motor control center, heating and ventilation improvements, demolishing and providing new lights, plumbing improvements, providing new doors, new instruments, new controls and other items described in the Bidding Documents for the Wastewater Treatment Facility Aeration System, RAS/WAS Pumping and Fine Screen Improvements Project complete and operational for the Sturgeon Bay Utilities Wastewater Treatment Facility. See outside links for more details.
Posted Date
Jan 5, 2026
Due Date
Jan 29, 2026
Release: Jan 5, 2026
Close: Jan 29, 2026
The work shall consist of approx. the demolishing of three (3) blowers and providing three (3) new blowers, demolishing fine bubble diffused aeration systems in three (3) aeration tanks and providing new fine bubble diffused aeration systems in the three (3) aeration tanks, demolishing and providing new dissolved oxygen (D.O.) meters, rehabilitating two (2) existing blowers (Contract Allowance), demolishing two (2) return activated sludge (RAS) pumps and providing two (2) new RAS pumps, demolishing a waste activated sludge (WAS) pump and providing a new WAS pump, providing a new fine screen with washer/compactor, demolishing and providing new coagulant feed lines, concrete repair, demolishing a motor control center and providing a new motor control center, heating and ventilation improvements, demolishing and providing new lights, plumbing improvements, providing new doors, new instruments, new controls and other items described in the Bidding Documents for the Wastewater Treatment Facility Aeration System, RAS/WAS Pumping and Fine Screen Improvements Project complete and operational for the Sturgeon Bay Utilities Wastewater Treatment Facility. See outside links for more details.
AvailableThe Lakewood Township Municipal Utilities Authority is soliciting proposals for professional services for calendar year 2026 under New Jersey’s fair and open process. Services include Authority General Counsel, Bond Counsel, Labor Counsel, Auditor, and Conflict Attorney. Sealed proposals are due to the Executive Director by January 21, 2026 at 10:00 AM in Lakewood, New Jersey.
Posted Date
Dec 29, 2025
Due Date
Jan 21, 2026
Release: Dec 29, 2025
Close: Jan 21, 2026
The Lakewood Township Municipal Utilities Authority is soliciting proposals for professional services for calendar year 2026 under New Jersey’s fair and open process. Services include Authority General Counsel, Bond Counsel, Labor Counsel, Auditor, and Conflict Attorney. Sealed proposals are due to the Executive Director by January 21, 2026 at 10:00 AM in Lakewood, New Jersey.
AvailableStafford County is soliciting proposals for on-call A/E services for water and wastewater engineering tasks. The procurement aims to establish multiple term/on-call task-order contracts for work in Stafford County, Virginia.
Posted Date
Dec 3, 2025
Due Date
Jan 26, 2026
Release: Dec 3, 2025
Close: Jan 26, 2026
Stafford County is soliciting proposals for on-call A/E services for water and wastewater engineering tasks. The procurement aims to establish multiple term/on-call task-order contracts for work in Stafford County, Virginia.
AvailableFor furnishing power transformer; one (1) 11.2/14 MVA at 65°C, ONAN/ONAF, 67 kV Delta to 12.47 GRDY with LTC and accessories. See outside link for more details.
Posted Date
Dec 17, 2025
Due Date
Jan 28, 2026
Release: Dec 17, 2025
Close: Jan 28, 2026
For furnishing power transformer; one (1) 11.2/14 MVA at 65°C, ONAN/ONAF, 67 kV Delta to 12.47 GRDY with LTC and accessories. See outside link for more details.
AvailableConstruction of mainline and residential underground electric distribution lines including primary, secondary, and service circuitry; and the installation of cables, box pads, and other related equipment and material.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
Construction of mainline and residential underground electric distribution lines including primary, secondary, and service circuitry; and the installation of cables, box pads, and other related equipment and material.
AvailableConstruction of 12.47 KV primary electric underground circuits. The project includes the installation of owner-furnished padmount switchgear, boxpads, and 15 KV primary cable in contractor-furnished and installed conduit in trench, bore, or other excavations.
Posted Date
Dec 17, 2025
Due Date
Jan 29, 2026
Release: Dec 17, 2025
Close: Jan 29, 2026
Construction of 12.47 KV primary electric underground circuits. The project includes the installation of owner-furnished padmount switchgear, boxpads, and 15 KV primary cable in contractor-furnished and installed conduit in trench, bore, or other excavations.
AvailableStafford County Public Schools issued RFP 26035 to establish on-call term contracts with multiple qualified A/E firms to provide water and wastewater planning, design, construction support, permitting, inspections, asset management, and related engineering services. The contract term is one year with up to three one-year renewals and covers multiple categories (distribution/transmission, pumping, treatment facilities, storage, dams, geotechnical, general engineering). This solicitation is a procurement (RFP), not a grant, and proposals are due in late January 2026.
Posted Date
Dec 31, 2025
Due Date
Jan 26, 2026
Release: Dec 31, 2025
Close: Jan 26, 2026
Stafford County Public Schools issued RFP 26035 to establish on-call term contracts with multiple qualified A/E firms to provide water and wastewater planning, design, construction support, permitting, inspections, asset management, and related engineering services. The contract term is one year with up to three one-year renewals and covers multiple categories (distribution/transmission, pumping, treatment facilities, storage, dams, geotechnical, general engineering). This solicitation is a procurement (RFP), not a grant, and proposals are due in late January 2026.
AvailableWork includes approx. 1,000 SY of 4" Sidewalk Replacement; 15 SY of 4" Handicap Ramp; 3,300 LF of 6: saw cutting; 1,000 SY of Wire Mesh (6x6xW2.9xW2.9”); 750 LF of Curb See Curb Replacement;150 SY of sod replacement; 500 SY of 4"-6" Asphalt
Posted Date
Dec 17, 2025
Due Date
Jan 20, 2026
Release: Dec 17, 2025
Close: Jan 20, 2026
Work includes approx. 1,000 SY of 4" Sidewalk Replacement; 15 SY of 4" Handicap Ramp; 3,300 LF of 6: saw cutting; 1,000 SY of Wire Mesh (6x6xW2.9xW2.9”); 750 LF of Curb See Curb Replacement;150 SY of sod replacement; 500 SY of 4"-6" Asphalt
AvailableThe City of Avalon is seeking bids from qualified contractors to perform on‑site civil work for the Civic Center Housing Project Phase 3A: Site Preparation. The scope includes grading, excavation, utilities, foundations, retaining walls, hardscape, drainage, and demolition of select structures. Bids must be submitted on the City’s official Bid Forms and received by 2:00 p.m. on Friday, January 30 2026 at the City Clerk’s Office.
Posted Date
Dec 15, 2025
Due Date
Jan 30, 2026
Release: Dec 15, 2025
Close: Jan 30, 2026
The City of Avalon is seeking bids from qualified contractors to perform on‑site civil work for the Civic Center Housing Project Phase 3A: Site Preparation. The scope includes grading, excavation, utilities, foundations, retaining walls, hardscape, drainage, and demolition of select structures. Bids must be submitted on the City’s official Bid Forms and received by 2:00 p.m. on Friday, January 30 2026 at the City Clerk’s Office.
AvailableProvide lawn care services.
Posted Date
Dec 16, 2025
Due Date
Jan 8, 2026
Release: Dec 16, 2025
Close: Jan 8, 2026
Provide lawn care services.
Contract for asphalt repairs for waterline replacement projects & street maintenance.
Posted Date
Nov 8, 2025
Due Date
Jan 13, 2026
Release: Nov 8, 2025
Close: Jan 13, 2026
Contract for asphalt repairs for waterline replacement projects & street maintenance.
AvailableUtility Improvements include approx. 6,640 LF of 12" to 8" PVC water, 3,475 LF of 8" sanitary sewer, 4,447 LF of 7' x 5' RCB through 18" RCP onsite storm sewer, 155 LF of 8' x 4' RCB and 18" RCP TxDOT storm sewer, and all related miscellaneous items and appurtenances
Posted Date
Dec 16, 2025
Due Date
Jan 9, 2026
Release: Dec 16, 2025
Close: Jan 9, 2026
Utility Improvements include approx. 6,640 LF of 12" to 8" PVC water, 3,475 LF of 8" sanitary sewer, 4,447 LF of 7' x 5' RCB through 18" RCP onsite storm sewer, 155 LF of 8' x 4' RCB and 18" RCP TxDOT storm sewer, and all related miscellaneous items and appurtenances
AvailableThe Work, in general, under this Contract includes the purchase, installation, and construction of all structures, equipment, and materials, including appurtenances, as indicated on the Plans. Major items of construction and services required are designated as follows: Install and adjust waterlines, valves, valve boxes, flushing valves, fittings, and appurtenances; Construct and adjust sanitary sewer, manholes and appurtenances; Repair existing pavement affected; Furnish and install all subsidiary items as necessary to complete the project; Perform testing as specified on installed lines; and Clean-up project area upon completion.
Posted Date
Dec 29, 2025
Due Date
Jan 20, 2026
Release: Dec 29, 2025
Close: Jan 20, 2026
The Work, in general, under this Contract includes the purchase, installation, and construction of all structures, equipment, and materials, including appurtenances, as indicated on the Plans. Major items of construction and services required are designated as follows: Install and adjust waterlines, valves, valve boxes, flushing valves, fittings, and appurtenances; Construct and adjust sanitary sewer, manholes and appurtenances; Repair existing pavement affected; Furnish and install all subsidiary items as necessary to complete the project; Perform testing as specified on installed lines; and Clean-up project area upon completion.
AvailableWork consist of rehabilitation includes site, mechanical, electrical and instrumentation upgrades. Including a new dual wetwell, pumps, discharge pipe, submersible mixers, flow meter, electrical building, odor control system, generator, access drive, chain-link fence, wet pond, and site grading.
Posted Date
Dec 15, 2025
Due Date
Jan 19, 2026
Release: Dec 15, 2025
Close: Jan 19, 2026
Work consist of rehabilitation includes site, mechanical, electrical and instrumentation upgrades. Including a new dual wetwell, pumps, discharge pipe, submersible mixers, flow meter, electrical building, odor control system, generator, access drive, chain-link fence, wet pond, and site grading.
AvailableSeeking qualified proposers to provide capital improvement project management services on an as-needed basis.
Posted Date
Nov 26, 2025
Due Date
Jan 8, 2026
Release: Nov 26, 2025
Close: Jan 8, 2026
Seeking qualified proposers to provide capital improvement project management services on an as-needed basis.
Construction consists of one (1) service lateral point repair, 280 LF of 4" service lateral cipp, and one (1) sanitary sewer point repair; one (1) service lateral point repair; three (3) sanitary sewer point repairs and 846 LF of 8" sanitary sewer cipp; three (3) sanitary sewer point repairs, 203 lf of 8" sanitary sewer cipp, and 313 LF of 18" sanitary sewer cipp; and other miscellaneous items of work.
Posted Date
Dec 11, 2025
Due Date
Jan 8, 2026
Release: Dec 11, 2025
Close: Jan 8, 2026
Construction consists of one (1) service lateral point repair, 280 LF of 4" service lateral cipp, and one (1) sanitary sewer point repair; one (1) service lateral point repair; three (3) sanitary sewer point repairs and 846 LF of 8" sanitary sewer cipp; three (3) sanitary sewer point repairs, 203 lf of 8" sanitary sewer cipp, and 313 LF of 18" sanitary sewer cipp; and other miscellaneous items of work.
Procurement for the construction of an oversized lift station, approximately 1360 feet of 16-inch DI water main, and approximately 4,600 feet of 10-inch force main.
Posted Date
Oct 3, 2025
Due Date
Jan 8, 2026
Release: Oct 3, 2025
Close: Jan 8, 2026
Procurement for the construction of an oversized lift station, approximately 1360 feet of 16-inch DI water main, and approximately 4,600 feet of 10-inch force main.
Work includes 220 LF replacement of vertical joint filler/sealant (interior), 220 LF replacement of vertical joint filler/sealant (exterior), 2,115 LF interface sealant system (floor and fillet) (combiflex or approved equal)(interior), 57,968 SF surface coating of interior floor and walls, 1 LS temporary bypassing of the settled water channel, 15,605 EA exterior aesthetic coat/painting, 6,000 SF thin cementitious re-surfacer for exposed aggregate on the concrete floor (as directed). See outside link.
Posted Date
Dec 3, 2025
Due Date
Jan 20, 2026
Release: Dec 3, 2025
Close: Jan 20, 2026
Work includes 220 LF replacement of vertical joint filler/sealant (interior), 220 LF replacement of vertical joint filler/sealant (exterior), 2,115 LF interface sealant system (floor and fillet) (combiflex or approved equal)(interior), 57,968 SF surface coating of interior floor and walls, 1 LS temporary bypassing of the settled water channel, 15,605 EA exterior aesthetic coat/painting, 6,000 SF thin cementitious re-surfacer for exposed aggregate on the concrete floor (as directed). See outside link.
AvailableProvide complete landscape maintenance services.
Posted Date
Sep 10, 2024
Due Date
Jan 16, 2026
Release: Sep 10, 2024
Close: Jan 16, 2026
Provide complete landscape maintenance services.
AvailableThe principal features of the work to be performed under this contract is the demonstration of mechanical integrity of class i injection well iw-1, in accordance with the requirements of the Florida Administrative Code (FAC) Rule 62-528 and the Florida Department of Environmental Protection (FDEP) underground injection control (uic) operation permit no. 0153012-008-uo/1x.
Posted Date
Dec 26, 2025
Due Date
Jan 13, 2026
Release: Dec 26, 2025
Close: Jan 13, 2026
The principal features of the work to be performed under this contract is the demonstration of mechanical integrity of class i injection well iw-1, in accordance with the requirements of the Florida Administrative Code (FAC) Rule 62-528 and the Florida Department of Environmental Protection (FDEP) underground injection control (uic) operation permit no. 0153012-008-uo/1x.
AvailableGet AI-powered buying signals and real-time alerts for utilities opportunities