Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work shall consist of approx. the demolishing of three (3) blowers and providing three (3) new blowers, demolishing fine bubble diffused aeration systems in three (3) aeration tanks and providing new fine bubble diffused aeration systems in the three (3) aeration tanks, demolishing and providing new dissolved oxygen (D.O.) meters, rehabilitating two (2) existing blowers (Contract Allowance), demolishing two (2) return activated sludge (RAS) pumps and providing two (2) new RAS pumps, demolishing a waste activated sludge (WAS) pump and providing a new WAS pump, providing a new fine screen with washer/compactor, demolishing and providing new coagulant feed lines, concrete repair, demolishing a motor control center and providing a new motor control center, heating and ventilation improvements, demolishing and providing new lights, plumbing improvements, providing new doors, new instruments, new controls and other items described in the Bidding Documents for the Wastewater Treatment Facility Aeration System, RAS/WAS Pumping and Fine Screen Improvements Project complete and operational for the Sturgeon Bay Utilities Wastewater Treatment Facility. See outside links for more details.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Operations is soliciting proposals from ESCOs to provide energy service and improvements on the LBWRP existing aeration system, which includes PACs, air distribution piping, diffusers, baffles, mixers, biotrickling filters, associated instrumentation and controls, foam spray, and other improvements at the plant (“Aeration System”) that can save energy, reduce costs, increase production of recycled water, and ensure continued compliance with increasingly stringent regulatory requirements (“Services”). For this RFP, “ESCO” refers to any entity qualified to provide a turn-key utility conservation program that includes the services and requirements set forth in this RFP.
Posted Date
Oct 15, 2025
Due Date
Jan 27, 2026
Release: Oct 15, 2025
Close: Jan 27, 2026
Operations is soliciting proposals from ESCOs to provide energy service and improvements on the LBWRP existing aeration system, which includes PACs, air distribution piping, diffusers, baffles, mixers, biotrickling filters, associated instrumentation and controls, foam spray, and other improvements at the plant (“Aeration System”) that can save energy, reduce costs, increase production of recycled water, and ensure continued compliance with increasingly stringent regulatory requirements (“Services”). For this RFP, “ESCO” refers to any entity qualified to provide a turn-key utility conservation program that includes the services and requirements set forth in this RFP.
AvailableConstruction of the city lead service and system improvements project. This project includes replacement of approx. 280 water service lines as well as SCADA replacement throughout the distribution system.
Posted Date
Dec 31, 2025
Due Date
Feb 2, 2026
Release: Dec 31, 2025
Close: Feb 2, 2026
Construction of the city lead service and system improvements project. This project includes replacement of approx. 280 water service lines as well as SCADA replacement throughout the distribution system.
AvailableThe existing aeration basin is a four-quadrant rectangular concrete structure with diffuser aeration system in all quadrants. This project involves replacement of aeration diffuser grid system in two quadrants of the four quadrant aeration basin. Replacement includes aeration piping, fittings, supports, diffusers and all appurtenances.
Posted Date
Dec 4, 2025
Due Date
Jan 8, 2026
Release: Dec 4, 2025
Close: Jan 8, 2026
The existing aeration basin is a four-quadrant rectangular concrete structure with diffuser aeration system in all quadrants. This project involves replacement of aeration diffuser grid system in two quadrants of the four quadrant aeration basin. Replacement includes aeration piping, fittings, supports, diffusers and all appurtenances.
The Project includes the Construction of wastewater treatment plant improvements and replacements including demolition of solids handling pumps, piping, and valves, and demolition of other miscellaneous items as required. Improvements include a new pavilion above UV disinfection system, replacement of chemical feed pumps, new solids handling pumps and associated piping and valves, painting of existing basement, new solids digester aeration and mixing equipment including air piping and valves, new sidewalk and parking facility, and new natural gas generator. All required appurtenances, interconnecting piping and valving, electrical improvements, and controls are included.
Posted Date
Dec 14, 2025
Due Date
Jan 15, 2026
Release: Dec 14, 2025
Close: Jan 15, 2026
The Project includes the Construction of wastewater treatment plant improvements and replacements including demolition of solids handling pumps, piping, and valves, and demolition of other miscellaneous items as required. Improvements include a new pavilion above UV disinfection system, replacement of chemical feed pumps, new solids handling pumps and associated piping and valves, painting of existing basement, new solids digester aeration and mixing equipment including air piping and valves, new sidewalk and parking facility, and new natural gas generator. All required appurtenances, interconnecting piping and valving, electrical improvements, and controls are included.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis