Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Operations is soliciting proposals from ESCOs to provide energy service and improvements on the LBWRP existing aeration system, which includes PACs, air distribution piping, diffusers, baffles, mixers, biotrickling filters, associated instrumentation and controls, foam spray, and other improvements at the plant (“Aeration System”) that can save energy, reduce costs, increase production of recycled water, and ensure continued compliance with increasingly stringent regulatory requirements (“Services”). For this RFP, “ESCO” refers to any entity qualified to provide a turn-key utility conservation program that includes the services and requirements set forth in this RFP.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of improvements to the existing Water Reclamation Facility to expand the existing activated sludge system and implement Enhanced Biological Nutrient Removal system utilizing the A2O process. This project includes construction of new activated sludge tanks, new blowers, splitter structures, a final clarifier conversion, UV equipment, sludge pumping, chemical feed equipment, site work, electrical, control, and mechanical improvements. The project also include equipment replacements including grit removal, primary clarifier mechanisms/weir/baffles, a final clarifier drive, sludge pumps, a sludge storage tank, heat exchangers, gravity belt thickener rehabilitation, and blowers. Project includes demolition of the existing trickling filters, intermediate clarifiers. manholes, and select piping. Project also includes site/civil, mechanical, electrical, and controls improvements. All work is as outlined in the Contract documents.
Posted Date
Jan 7, 2026
Due Date
Feb 18, 2026
Release: Jan 7, 2026
Close: Feb 18, 2026
Project consists of improvements to the existing Water Reclamation Facility to expand the existing activated sludge system and implement Enhanced Biological Nutrient Removal system utilizing the A2O process. This project includes construction of new activated sludge tanks, new blowers, splitter structures, a final clarifier conversion, UV equipment, sludge pumping, chemical feed equipment, site work, electrical, control, and mechanical improvements. The project also include equipment replacements including grit removal, primary clarifier mechanisms/weir/baffles, a final clarifier drive, sludge pumps, a sludge storage tank, heat exchangers, gravity belt thickener rehabilitation, and blowers. Project includes demolition of the existing trickling filters, intermediate clarifiers. manholes, and select piping. Project also includes site/civil, mechanical, electrical, and controls improvements. All work is as outlined in the Contract documents.
AvailableWater treatment plant improvements including, but not limited to, the construction of a second clear well, complete filter reconstruction, electrical system upgrades, a new backwash waste sump and pump station, repurposing the existing high service pump station, a new high service pumpstation and chemical building, existing chemical feed system improvements, sludge handling/processing improvements, stormwater system updates, and miscellaneous civil/site improvements.
Posted Date
Nov 6, 2025
Due Date
Jan 15, 2026
Release: Nov 6, 2025
Close: Jan 15, 2026
Water treatment plant improvements including, but not limited to, the construction of a second clear well, complete filter reconstruction, electrical system upgrades, a new backwash waste sump and pump station, repurposing the existing high service pump station, a new high service pumpstation and chemical building, existing chemical feed system improvements, sludge handling/processing improvements, stormwater system updates, and miscellaneous civil/site improvements.
Construction consists of: major rehabilitation of the existing plant 3 headworks building including: existing screen rehabilitation, new screenings conveyance and dewatering/compaction, a new vortex grit collector, new grit slurry pump and grit washer. Additionally, two 60" screw pumps will be replaced and one new 60" screw pump will be installed at the far west sewer pump station. New hvac will be provided for the plant 3 headworks buildings (screen room, washer-compactor room, electrical room, and grit washer room) and gas safety equipment will be installed in classified areas. A manual bar rack channel will be constructed. All existing slide gates will be removed and/or replaced. Miscellaneous site piping, grading, electrical, controls, architecture, mechanical, and plumbing work will be included.
Posted Date
Dec 2, 2025
Due Date
Jan 16, 2026
Major rehabilitation of the existing Plant 3 Headworks building, including screen rehabilitation, new screenings conveyance, new vortex grit collector, new grit slurry pump, and grit washer. Also, replacement and installation of 60-inch screw pumps at the Far West Sewer Pump Station, new HVAC, gas safety equipment, manual bar rack channel construction, and miscellaneous site work.
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
Major rehabilitation of the existing Plant 3 Headworks building, including screen rehabilitation, new screenings conveyance, new vortex grit collector, new grit slurry pump, and grit washer. Also, replacement and installation of 60-inch screw pumps at the Far West Sewer Pump Station, new HVAC, gas safety equipment, manual bar rack channel construction, and miscellaneous site work.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction consists of: major rehabilitation of the existing plant 3 headworks building including: existing screen rehabilitation, new screenings conveyance and dewatering/compaction, a new vortex grit collector, new grit slurry pump and grit washer. Additionally, two 60" screw pumps will be replaced and one new 60" screw pump will be installed at the far west sewer pump station. New hvac will be provided for the plant 3 headworks buildings (screen room, washer-compactor room, electrical room, and grit washer room) and gas safety equipment will be installed in classified areas. A manual bar rack channel will be constructed. All existing slide gates will be removed and/or replaced. Miscellaneous site piping, grading, electrical, controls, architecture, mechanical, and plumbing work will be included.