Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Major rehabilitation of the existing Plant 3 Headworks building, including screen rehabilitation, new screenings conveyance, new vortex grit collector, new grit slurry pump, and grit washer. Also, replacement and installation of 60-inch screw pumps at the Far West Sewer Pump Station, new HVAC, gas safety equipment, manual bar rack channel construction, and miscellaneous site work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Construction consists of: major rehabilitation of the existing plant 3 headworks building including: existing screen rehabilitation, new screenings conveyance and dewatering/compaction, a new vortex grit collector, new grit slurry pump and grit washer. Additionally, two 60" screw pumps will be replaced and one new 60" screw pump will be installed at the far west sewer pump station. New hvac will be provided for the plant 3 headworks buildings (screen room, washer-compactor room, electrical room, and grit washer room) and gas safety equipment will be installed in classified areas. A manual bar rack channel will be constructed. All existing slide gates will be removed and/or replaced. Miscellaneous site piping, grading, electrical, controls, architecture, mechanical, and plumbing work will be included.
Posted Date
Dec 2, 2025
Due Date
Jan 16, 2026
Release: Dec 2, 2025
Close: Jan 16, 2026
Construction consists of: major rehabilitation of the existing plant 3 headworks building including: existing screen rehabilitation, new screenings conveyance and dewatering/compaction, a new vortex grit collector, new grit slurry pump and grit washer. Additionally, two 60" screw pumps will be replaced and one new 60" screw pump will be installed at the far west sewer pump station. New hvac will be provided for the plant 3 headworks buildings (screen room, washer-compactor room, electrical room, and grit washer room) and gas safety equipment will be installed in classified areas. A manual bar rack channel will be constructed. All existing slide gates will be removed and/or replaced. Miscellaneous site piping, grading, electrical, controls, architecture, mechanical, and plumbing work will be included.
AvailableThe City of Bullhead City is soliciting bids for construction improvements at the Section 10 Water Reclamation Plant, specifically for Clarifier 3 and RAS/WAS pump station upgrades. This project involves constructing a third clarifier, adding a new RAS/WAS pump, replacing two existing pumps, and includes various civil and SCADA upgrades. The estimated project cost ranges from $1,000,000 to $5,000,000 with a 180-day duration.
Posted Date
Dec 10, 2025
Due Date
Jan 14, 2026
Release: Dec 10, 2025
Close: Jan 14, 2026
The City of Bullhead City is soliciting bids for construction improvements at the Section 10 Water Reclamation Plant, specifically for Clarifier 3 and RAS/WAS pump station upgrades. This project involves constructing a third clarifier, adding a new RAS/WAS pump, replacing two existing pumps, and includes various civil and SCADA upgrades. The estimated project cost ranges from $1,000,000 to $5,000,000 with a 180-day duration.
AvailableOperations is soliciting proposals from ESCOs to provide energy service and improvements on the LBWRP existing aeration system, which includes PACs, air distribution piping, diffusers, baffles, mixers, biotrickling filters, associated instrumentation and controls, foam spray, and other improvements at the plant (“Aeration System”) that can save energy, reduce costs, increase production of recycled water, and ensure continued compliance with increasingly stringent regulatory requirements (“Services”). For this RFP, “ESCO” refers to any entity qualified to provide a turn-key utility conservation program that includes the services and requirements set forth in this RFP.
Posted Date
Oct 15, 2025
Due Date
Jan 27, 2026
Release: Oct 15, 2025
Close: Jan 27, 2026
Operations is soliciting proposals from ESCOs to provide energy service and improvements on the LBWRP existing aeration system, which includes PACs, air distribution piping, diffusers, baffles, mixers, biotrickling filters, associated instrumentation and controls, foam spray, and other improvements at the plant (“Aeration System”) that can save energy, reduce costs, increase production of recycled water, and ensure continued compliance with increasingly stringent regulatory requirements (“Services”). For this RFP, “ESCO” refers to any entity qualified to provide a turn-key utility conservation program that includes the services and requirements set forth in this RFP.
AvailableThe City of Starkville seeks bids for the Ernest E. Jones Wastewater Treatment Plant to construct a new headworks facility, secondary clarifier improvements, and return sludge pump station improvements. A pre‑bid meeting is scheduled for November 18, 2025 at 10:00 AM, and bids are due December 18, 2025 at 12:00 PM local time.
Posted Date
Nov 5, 2025
Due Date
Dec 18, 2025
Release: Nov 5, 2025
Close: Dec 18, 2025
The City of Starkville seeks bids for the Ernest E. Jones Wastewater Treatment Plant to construct a new headworks facility, secondary clarifier improvements, and return sludge pump station improvements. A pre‑bid meeting is scheduled for November 18, 2025 at 10:00 AM, and bids are due December 18, 2025 at 12:00 PM local time.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.