City of Starkville
The City of Starkville seeks bids for the Ernest E. Jones Wastewater Treatment Plant to construct a new headworks facility, secondary clarifier improvements, and return sludge pump station improvements. A pre‑bid meeting is scheduled for November 18, 2025 at 10:00 AM, and bids are due December 18, 2025 at 12:00 PM local time.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Raleigh
Seeking design and construction phase services for one new 160-foot diameter secondary clarifier and one additional return activated sludge (ras) pump in the existing ras pump station currently serving clarifiers n1 and n2 at the neuse river resource recovery facility (nrrrf).
Posted Date
Nov 6, 2025
Due Date
Dec 12, 2025
Release: Nov 6, 2025
City of Raleigh
Close: Dec 12, 2025
Seeking design and construction phase services for one new 160-foot diameter secondary clarifier and one additional return activated sludge (ras) pump in the existing ras pump station currently serving clarifiers n1 and n2 at the neuse river resource recovery facility (nrrrf).
AvailableCity of Kenosha
The project consists of constructing: replacement of primary clarifier sludge mechanisms and drives; replacement of MCC10-1A/1B in its existing location; temporary power panel/starter arrangement to maintain operation of clarifier drives during MCC replacement; provide new conduit and wiring for clarifier drives; replacement of primary clarifier effluent troughs and weirs; crack repair and concrete rehabilitation; bid alternate no. 1 - fiberglass enclosures.
Posted Date
Oct 9, 2025
Due Date
Nov 18, 2025
Release: Oct 9, 2025
City of Kenosha
Close: Nov 18, 2025
The project consists of constructing: replacement of primary clarifier sludge mechanisms and drives; replacement of MCC10-1A/1B in its existing location; temporary power panel/starter arrangement to maintain operation of clarifier drives during MCC replacement; provide new conduit and wiring for clarifier drives; replacement of primary clarifier effluent troughs and weirs; crack repair and concrete rehabilitation; bid alternate no. 1 - fiberglass enclosures.
City of Aurora
UV Chanel Slide Gates: work consists of demo of existing slide gates (face mounted, downward opening, 24”x36”, manually operated) and install new COA pre-procured gates. Secondary Clarifier Scum Baffling System: Work consists of installation of new COA pre-procured scum baffling system for both Secondary Clarifiers 1 & 2. Work must be done sequentially as one (1) Secondary Clarifier must remain in operation at all times to maintain biology. Additionally, this work will include monitoring and lowering of existing groundwater levels. This is achieved utilizing existing dewatering wells and discharging to adjacent retention pond. Contractor must supply and install temporary pumps, generator power, and freeze protection of discharge lines.
Posted Date
Nov 14, 2025
Due Date
Dec 2, 2025
Release: Nov 14, 2025
City of Aurora
Close: Dec 2, 2025
UV Chanel Slide Gates: work consists of demo of existing slide gates (face mounted, downward opening, 24”x36”, manually operated) and install new COA pre-procured gates. Secondary Clarifier Scum Baffling System: Work consists of installation of new COA pre-procured scum baffling system for both Secondary Clarifiers 1 & 2. Work must be done sequentially as one (1) Secondary Clarifier must remain in operation at all times to maintain biology. Additionally, this work will include monitoring and lowering of existing groundwater levels. This is achieved utilizing existing dewatering wells and discharging to adjacent retention pond. Contractor must supply and install temporary pumps, generator power, and freeze protection of discharge lines.
AvailableCity of Wyoming
The Work of this Contract is generally described as replacement of the existing screenings and grit systems with new multi-rake screens with washing/compaction for screening handling, and grit classifiers and pumps. The work includes new process piping and equipment, structural, plumbing, electrical, and instrumentation and control components.
Posted Date
Oct 21, 2025
Due Date
Nov 25, 2025
Release: Oct 21, 2025
City of Wyoming
Close: Nov 25, 2025
The Work of this Contract is generally described as replacement of the existing screenings and grit systems with new multi-rake screens with washing/compaction for screening handling, and grit classifiers and pumps. The work includes new process piping and equipment, structural, plumbing, electrical, and instrumentation and control components.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis