Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Raleigh
Seeking design and construction phase services for one new 160-foot diameter secondary clarifier and one additional return activated sludge (ras) pump in the existing ras pump station currently serving clarifiers n1 and n2 at the neuse river resource recovery facility (nrrrf).
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Silver Bay
Provide contracting services for the rehabilitation of a Water Treatment Facility. The rehabilitation will primarily consist of construction of a new construction of a new booster station, pump and equipment replacements, rapid mix and flocculator mixer replacements, clarifier mechanism replacement, replacement of chemical feed equipment, electrical room addition to existing building, distribution system modifications, SCADA system replacement, associated electrical and mechanical system upgrades, and other miscellaneous site improvements.
Posted Date
Oct 31, 2025
Due Date
Nov 21, 2025
Release: Oct 31, 2025
City of Silver Bay
Close: Nov 21, 2025
Provide contracting services for the rehabilitation of a Water Treatment Facility. The rehabilitation will primarily consist of construction of a new construction of a new booster station, pump and equipment replacements, rapid mix and flocculator mixer replacements, clarifier mechanism replacement, replacement of chemical feed equipment, electrical room addition to existing building, distribution system modifications, SCADA system replacement, associated electrical and mechanical system upgrades, and other miscellaneous site improvements.
AvailableCity of Elk River
Biosolids removal, demolition of two existing wastewater lagoons, construction of two new wastewater lagoons, HDPE liners, aeration piping and diffusers, transfer structures, liquid chlorine mixing equipment, and piping.
Posted Date
Nov 5, 2025
Due Date
Dec 4, 2025
Release: Nov 5, 2025
City of Elk River
Close: Dec 4, 2025
Biosolids removal, demolition of two existing wastewater lagoons, construction of two new wastewater lagoons, HDPE liners, aeration piping and diffusers, transfer structures, liquid chlorine mixing equipment, and piping.
AvailableCity of Starkville
The City of Starkville seeks bids for the Ernest E. Jones Wastewater Treatment Plant to construct a new headworks facility, secondary clarifier improvements, and return sludge pump station improvements. A pre‑bid meeting is scheduled for November 18, 2025 at 10:00 AM, and bids are due December 18, 2025 at 12:00 PM local time.
Posted Date
Nov 5, 2025
Due Date
Dec 18, 2025
Release: Nov 5, 2025
City of Starkville
Close: Dec 18, 2025
The City of Starkville seeks bids for the Ernest E. Jones Wastewater Treatment Plant to construct a new headworks facility, secondary clarifier improvements, and return sludge pump station improvements. A pre‑bid meeting is scheduled for November 18, 2025 at 10:00 AM, and bids are due December 18, 2025 at 12:00 PM local time.
AvailableWendell School District 232
Provide CM/GC services for pre-construction and construction services for upcoming district facility improvement projects. Assist the district and its design team with budgeting, constructability reviews, scheduling and general contracting services under a CM/GC delivery model. Projects include a parking lot, gym improvements, and campus-wide improvements.
Posted Date
Nov 6, 2025
Due Date
Nov 20, 2025
Release: Nov 6, 2025
Wendell School District 232
Close: Nov 20, 2025
Provide CM/GC services for pre-construction and construction services for upcoming district facility improvement projects. Assist the district and its design team with budgeting, constructability reviews, scheduling and general contracting services under a CM/GC delivery model. Projects include a parking lot, gym improvements, and campus-wide improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis