Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project Description Excavation and construction of a third clarifier and associated yard piping, addition of a new RAS/WAS pump, and replacement of two existing RAS/WAS pumps. Construction of new clarifier splitter box and demolition of existing splitter box. Upsizing of existing secondary effluent (SE) piping and addition of SE manhole (Additive Alternate No.1). Support the rehabilitation of two existing clarifiers by cleaning the existing tanks, concrete repair as identified during cleaning, and coating of the concrete in the existing tanks. Work will include, but not be limited to, excavation, concrete work, site grading and SCADA upgrades with programming performed by Owner’s SCADA programmer.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes : construction of the 8'-0" x 8'-0" cast in place concrete battery e influent conduit, extending from the north side of the existing meter building to the new battery e mixing chamber, and including a new motorized knife gate valve and magnetic flow meter.
Posted Date
Sep 9, 2025
Due Date
Mar 3, 2026
Release: Sep 9, 2025
Close: Mar 3, 2026
Work includes : construction of the 8'-0" x 8'-0" cast in place concrete battery e influent conduit, extending from the north side of the existing meter building to the new battery e mixing chamber, and including a new motorized knife gate valve and magnetic flow meter.
AvailableThe work shall consist of approx. the demolishing of three (3) blowers and providing three (3) new blowers, demolishing fine bubble diffused aeration systems in three (3) aeration tanks and providing new fine bubble diffused aeration systems in the three (3) aeration tanks, demolishing and providing new dissolved oxygen (D.O.) meters, rehabilitating two (2) existing blowers (Contract Allowance), demolishing two (2) return activated sludge (RAS) pumps and providing two (2) new RAS pumps, demolishing a waste activated sludge (WAS) pump and providing a new WAS pump, providing a new fine screen with washer/compactor, demolishing and providing new coagulant feed lines, concrete repair, demolishing a motor control center and providing a new motor control center, heating and ventilation improvements, demolishing and providing new lights, plumbing improvements, providing new doors, new instruments, new controls and other items described in the Bidding Documents for the Wastewater Treatment Facility Aeration System, RAS/WAS Pumping and Fine Screen Improvements Project complete and operational for the Sturgeon Bay Utilities Wastewater Treatment Facility. See outside links for more details.
Posted Date
Jan 5, 2026
Due Date
Jan 29, 2026
Provide powered activated carbon 600000 ibs.
Posted Date
Jan 9, 2026
Due Date
Feb 3, 2026
Release: Jan 9, 2026
Close: Feb 3, 2026
Provide powered activated carbon 600000 ibs.
AvailableThe City of Evanston is soliciting bids to replace a sludge pump and motor at the Evanston Water Treatment Plant, including procurement, delivery, installation, wiring, testing, and commissioning. The contractor must supply a motor of approximately 40 HP and a pump meeting specified flow, head, and connection requirements, perform integration with existing electrical and control systems, and provide commissioning documentation. A mandatory pre-bid meeting is scheduled and contact information is provided; documentation is available from the bid source link.
Posted Date
Dec 11, 2025
Due Date
Jan 27, 2026
Release: Dec 11, 2025
Close: Jan 27, 2026
The City of Evanston is soliciting bids to replace a sludge pump and motor at the Evanston Water Treatment Plant, including procurement, delivery, installation, wiring, testing, and commissioning. The contractor must supply a motor of approximately 40 HP and a pump meeting specified flow, head, and connection requirements, perform integration with existing electrical and control systems, and provide commissioning documentation. A mandatory pre-bid meeting is scheduled and contact information is provided; documentation is available from the bid source link.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 29, 2026
The work shall consist of approx. the demolishing of three (3) blowers and providing three (3) new blowers, demolishing fine bubble diffused aeration systems in three (3) aeration tanks and providing new fine bubble diffused aeration systems in the three (3) aeration tanks, demolishing and providing new dissolved oxygen (D.O.) meters, rehabilitating two (2) existing blowers (Contract Allowance), demolishing two (2) return activated sludge (RAS) pumps and providing two (2) new RAS pumps, demolishing a waste activated sludge (WAS) pump and providing a new WAS pump, providing a new fine screen with washer/compactor, demolishing and providing new coagulant feed lines, concrete repair, demolishing a motor control center and providing a new motor control center, heating and ventilation improvements, demolishing and providing new lights, plumbing improvements, providing new doors, new instruments, new controls and other items described in the Bidding Documents for the Wastewater Treatment Facility Aeration System, RAS/WAS Pumping and Fine Screen Improvements Project complete and operational for the Sturgeon Bay Utilities Wastewater Treatment Facility. See outside links for more details.
Available