Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Sturgeon Bay Utilities's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Water/Sewer Utility Manager
General Manager
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Sturgeon Bay Utilities
The work shall consist of approx. the demolishing of three (3) blowers and providing three (3) new blowers, demolishing fine bubble diffused aeration systems in three (3) aeration tanks and providing new fine bubble diffused aeration systems in the three (3) aeration tanks, demolishing and providing new dissolved oxygen (D.O.) meters, rehabilitating two (2) existing blowers (Contract Allowance), demolishing two (2) return activated sludge (RAS) pumps and providing two (2) new RAS pumps, demolishing a waste activated sludge (WAS) pump and providing a new WAS pump, providing a new fine screen with washer/compactor, demolishing and providing new coagulant feed lines, concrete repair, demolishing a motor control center and providing a new motor control center, heating and ventilation improvements, demolishing and providing new lights, plumbing improvements, providing new doors, new instruments, new controls and other items described in the Bidding Documents for the Wastewater Treatment Facility Aeration System, RAS/WAS Pumping and Fine Screen Improvements Project complete and operational for the Sturgeon Bay Utilities Wastewater Treatment Facility. See outside links for more details.
Posted Date
Jan 5, 2026
Due Date
Jan 29, 2026
Release: Jan 5, 2026
Sturgeon Bay Utilities
Close: Jan 29, 2026
The work shall consist of approx. the demolishing of three (3) blowers and providing three (3) new blowers, demolishing fine bubble diffused aeration systems in three (3) aeration tanks and providing new fine bubble diffused aeration systems in the three (3) aeration tanks, demolishing and providing new dissolved oxygen (D.O.) meters, rehabilitating two (2) existing blowers (Contract Allowance), demolishing two (2) return activated sludge (RAS) pumps and providing two (2) new RAS pumps, demolishing a waste activated sludge (WAS) pump and providing a new WAS pump, providing a new fine screen with washer/compactor, demolishing and providing new coagulant feed lines, concrete repair, demolishing a motor control center and providing a new motor control center, heating and ventilation improvements, demolishing and providing new lights, plumbing improvements, providing new doors, new instruments, new controls and other items described in the Bidding Documents for the Wastewater Treatment Facility Aeration System, RAS/WAS Pumping and Fine Screen Improvements Project complete and operational for the Sturgeon Bay Utilities Wastewater Treatment Facility. See outside links for more details.
AvailableSturgeon Bay Utilities
Work shall consist of emptying and power washing the thermophilic digester, removing and rehabilitating the cover of the digester, demolishing the digester gas mixing system and providing two (2) new mechanical draft tube mixers, reinstalling the digester cover, demolishing a belt filter press and conveyor and providing a new belt filter press and conveyor, demolishing and providing a new thermophilic digester transfer pump, demolishing and providing a new boiler/heat exchanger, emptying and power-washing the mesophilic digesters, coating and providing new lights in the chemical feed room, heating and ventilation improvements, plumbing improvements, new instruments and other items described in the bidding documents for the wastewater treatment facility solids handling improvements project complete and operational for the sturgeon bay utilities wastewater treatment facility.
Posted Date
Jan 10, 2025
Due Date
Feb 3, 2025
Release: Jan 10, 2025
Sturgeon Bay Utilities
Close: Feb 3, 2025
Work shall consist of emptying and power washing the thermophilic digester, removing and rehabilitating the cover of the digester, demolishing the digester gas mixing system and providing two (2) new mechanical draft tube mixers, reinstalling the digester cover, demolishing a belt filter press and conveyor and providing a new belt filter press and conveyor, demolishing and providing a new thermophilic digester transfer pump, demolishing and providing a new boiler/heat exchanger, emptying and power-washing the mesophilic digesters, coating and providing new lights in the chemical feed room, heating and ventilation improvements, plumbing improvements, new instruments and other items described in the bidding documents for the wastewater treatment facility solids handling improvements project complete and operational for the sturgeon bay utilities wastewater treatment facility.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.