Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The existing aeration basin is a four-quadrant rectangular concrete structure with diffuser aeration system in all quadrants. This project involves replacement of aeration diffuser grid system in two quadrants of the four quadrant aeration basin. Replacement includes aeration piping, fittings, supports, diffusers and all appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide wastewater treatment plant aeration basin rehabilitation and grit system replacement. The aeration basin air system requires a full rehabilitation. The scope of work includes: dewatering, removing and disposing the accumulated sludge, and cleaning all four cells of the aeration basin; complete replacement of all air distribution system in all four cells of the aeration basin. Once initial cleaning is complete, all remaining metal piping, fittings, and valves from the blowers to the new joints on the drop pipes in the aeration basin will be blast-cleaned and repainted. Due to the current inaccessibility of the filled cells, additional repairs to pedestals, tank walls, and floors may be required. See attached file.
Posted Date
Nov 19, 2025
Due Date
Dec 19, 2025
Premium
Access the largest public sector contact database
Close: Dec 19, 2025
Provide wastewater treatment plant aeration basin rehabilitation and grit system replacement. The aeration basin air system requires a full rehabilitation. The scope of work includes: dewatering, removing and disposing the accumulated sludge, and cleaning all four cells of the aeration basin; complete replacement of all air distribution system in all four cells of the aeration basin. Once initial cleaning is complete, all remaining metal piping, fittings, and valves from the blowers to the new joints on the drop pipes in the aeration basin will be blast-cleaned and repainted. Due to the current inaccessibility of the filled cells, additional repairs to pedestals, tank walls, and floors may be required. See attached file.
AvailableSt. John the Baptist Parish Government solicits contractors to rehabilitate the aeration basin and replace the grit system at the River Road Wastewater Treatment Plant, providing all labor, materials, equipment, and services required by the contract documents. The solicitation was posted Nov 19, 2025 with proposals due Dec 19, 2025, and HigherGov notes it does not track documents for this opportunity and directs users to the original source link.
Posted Date
Nov 19, 2025
Due Date
Dec 19, 2025
Release: Nov 19, 2025
Close: Dec 19, 2025
St. John the Baptist Parish Government solicits contractors to rehabilitate the aeration basin and replace the grit system at the River Road Wastewater Treatment Plant, providing all labor, materials, equipment, and services required by the contract documents. The solicitation was posted Nov 19, 2025 with proposals due Dec 19, 2025, and HigherGov notes it does not track documents for this opportunity and directs users to the original source link.
AvailableWater pollution control plant aeration basin diffuser improvements phase 2 as follows: the work of this contract contains upgrades to the west aeration basin complex and is generally described as follows: upgrades to the aeration diffusers and low pressure piping feeding aeration basin 7, 8, and 9; owner to furnish aeration diffusers and flow control valves. Design of pipe support and thermal expansion system. Additional upgrades of wastewater treatment facilities including structural, electrical, and instrumentation and control.
Posted Date
Nov 6, 2025
Due Date
Dec 18, 2025
Release: Nov 6, 2025
Close: Dec 18, 2025
Water pollution control plant aeration basin diffuser improvements phase 2 as follows: the work of this contract contains upgrades to the west aeration basin complex and is generally described as follows: upgrades to the aeration diffusers and low pressure piping feeding aeration basin 7, 8, and 9; owner to furnish aeration diffusers and flow control valves. Design of pipe support and thermal expansion system. Additional upgrades of wastewater treatment facilities including structural, electrical, and instrumentation and control.
AvailableWork includes demolition of plant III structures and yard piping, etc., construction of four aeration basins, a blower building, hydraulic splitter structures, associated yard piping, earthwork, and electrical improvements, and rehabilitation of the existing plant ii RAS/WAS pump station, and all other work. See attached files.
Posted Date
Oct 18, 2025
Due Date
Dec 16, 2025
Release: Oct 18, 2025
Close: Dec 16, 2025
Work includes demolition of plant III structures and yard piping, etc., construction of four aeration basins, a blower building, hydraulic splitter structures, associated yard piping, earthwork, and electrical improvements, and rehabilitation of the existing plant ii RAS/WAS pump station, and all other work. See attached files.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis