Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Fort Wayne
Water pollution control plant aeration basin diffuser improvements phase 2 as follows: the work of this contract contains upgrades to the west aeration basin complex and is generally described as follows: upgrades to the aeration diffusers and low pressure piping feeding aeration basin 7, 8, and 9; owner to furnish aeration diffusers and flow control valves. Design of pipe support and thermal expansion system. Additional upgrades of wastewater treatment facilities including structural, electrical, and instrumentation and control.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Collin County Mud 1
North Collin County Municipal Utility District No. 1 is soliciting sealed bids for excavation improvements for Songhill Phase 2, including approximately 114,325 cubic yards of cut and fill with erosion control and retaining walls. Bids are due by 1:30 PM local time on December 10, 2025 at BGE, Inc. in Frisco, Texas; bid documents are available via CivCast.
Posted Date
-
Due Date
Dec 10, 2025
Collin County Mud 1
Close: Dec 10, 2025
North Collin County Municipal Utility District No. 1 is soliciting sealed bids for excavation improvements for Songhill Phase 2, including approximately 114,325 cubic yards of cut and fill with erosion control and retaining walls. Bids are due by 1:30 PM local time on December 10, 2025 at BGE, Inc. in Frisco, Texas; bid documents are available via CivCast.
AvailableGreater Peoria Sanitary District
WWTP aeration gallery tunnel.
Posted Date
Nov 4, 2025
Due Date
Dec 5, 2025
Release: Nov 4, 2025
Greater Peoria Sanitary District
Close: Dec 5, 2025
WWTP aeration gallery tunnel.
AvailableCity of Jerseyville
The City of Jerseyville intends to construct Pleasant Street Drainage Improvements – Phase 2, including storm sewer construction, lining, grading, and pavement patching. Bids are due December 17, 2025.
Posted Date
-
Due Date
Dec 17, 2025
City of Jerseyville
Close: Dec 17, 2025
The City of Jerseyville intends to construct Pleasant Street Drainage Improvements – Phase 2, including storm sewer construction, lining, grading, and pavement patching. Bids are due December 17, 2025.
AvailableSanitation Districts Of Los Angeles County
Operations is soliciting proposals from ESCOs to provide energy service and improvements on the LBWRP existing aeration system, which includes PACs, air distribution piping, diffusers, baffles, mixers, biotrickling filters, associated instrumentation and controls, foam spray, and other improvements at the plant (“Aeration System”) that can save energy, reduce costs, increase production of recycled water, and ensure continued compliance with increasingly stringent regulatory requirements (“Services”). For this RFP, “ESCO” refers to any entity qualified to provide a turn-key utility conservation program that includes the services and requirements set forth in this RFP.
Posted Date
Oct 15, 2025
Due Date
Jan 27, 2026
Release: Oct 15, 2025
Sanitation Districts Of Los Angeles County
Close: Jan 27, 2026
Operations is soliciting proposals from ESCOs to provide energy service and improvements on the LBWRP existing aeration system, which includes PACs, air distribution piping, diffusers, baffles, mixers, biotrickling filters, associated instrumentation and controls, foam spray, and other improvements at the plant (“Aeration System”) that can save energy, reduce costs, increase production of recycled water, and ensure continued compliance with increasingly stringent regulatory requirements (“Services”). For this RFP, “ESCO” refers to any entity qualified to provide a turn-key utility conservation program that includes the services and requirements set forth in this RFP.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis