RFP Catalog/Utilities

Utilities RFPs

Find utilities RFP opportunities from public utility districts, municipal utilities, and utility commissions. Search solicitations for utility infrastructure, utility services, and utility management systems updated daily.

U.S. Army Engineer District Alaska

This notice is a Request for Information (RFI) / market intelligence from the U.S. Army Corps of Engineers, Alaska District seeking industry input for Preconstruction Services and construction for the Utilities and Infrastructure Fighter Town Recapitalization at Joint Base Elmendorf Richardson (JBER), Alaska. The project covers Phase I work on a 500+ acre site including mass civil earthworks (≈10 million cubic yards), comprehensive campus utilities (including a new 20 MVA electrical substation), airfield and logistics infrastructure, and phased execution; the estimated acquisition magnitude is $400,000,000 to $600,000,000. The planned acquisition strategy is Construction Manager at Risk delivered via Other Transaction Authority (OTA); responses (PDF) were requested by email to the listed USACE contacts by 24 July 2026 at 2:00 PM Alaska Time.

Posted Date

Jul 13, 2026

Due Date

Jul 24, 2026

Timeline Progress51%
Oklahoma City Housing Authority

The Oklahoma City Housing Authority (OCHA) and Community Enhancement Corporation (CEC) are soliciting competitive proposals from qualified contractors for site utility infrastructure construction—including water main, domestic water service, storm water, fire lines, sanitary sewer, and fire hydrants—for Phase 1 of the Creston Park Redevelopment Project located at N. Martin Luther King Ave. and NE 28th/29th Streets in Oklahoma City, Oklahoma. The project is funded in whole or in part by American Rescue Plan Act (ARPA) federal funds and is subject to Davis-Bacon prevailing wage requirements. Proposals are due no later than 5:00 PM CST on July 23, 2026, and written questions must be submitted by 5:00 PM CST on July 13, 2026.

Posted Date

-

Due Date

Jul 23, 2026

Greenville Utilities Commission

Furnishing of approx.: 25 - STK# 205010 Transformers, 15 KVA CSP 7200V. 25 - STK# 205020 Transformers, 25 KVA CSP 7200V.

Posted Date

Jun 25, 2026

Due Date

Jul 21, 2026

Timeline Progress91%
City of North Port

The City of North Port, Florida is soliciting formal quotes for furnishings for the new Utilities Building, which is replacing the former Utilities facility on Price Boulevard that was rendered uninhabitable by Hurricane Ian. The successful vendor will supply and install furniture, fixtures, and equipment for the administrative and operational spaces of the new facility currently under construction on Pan American Boulevard. Quotes are due by July 27, 2026, with the project expected to be completed by fall 2026.

Posted Date

Jul 10, 2026

Due Date

Jul 27, 2026

Timeline Progress51%
City of Bartow

Seeking catalog or retail discounts from qualified vendors interested in supplying various supplies, parts and equipment as it specifically relates to water & wastewater utilities for the City Public Works Department and other City.

Posted Date

May 16, 2025

Due Date

May 31, 2029

Timeline Progress29%
City of West Palm Beach

The City of West Palm Beach is seeking a qualified, experienced, and responsive firm to provide Dispatch Professional Answering Services for the City's Public Utilities Department. This RFP (No. 25.26.215 SS) is open and proposals must be submitted by 3:00 PM on July 30, 2026, with one original, one electronic version on a flash drive, and five copies in a sealed envelope. Solicitation documents are only available electronically and free of charge by registering on the City's third-party procurement site, DemandStar, and contact with anyone other than Procurement Division staff is grounds for disqualification.

Posted Date

Jul 7, 2026

Due Date

Jul 30, 2026

Timeline Progress51%
City of Wichita

On-call contractor services for water utilities. Provide on-call construction services for the public works & utilities department.

Posted Date

-

Due Date

Jul 31, 2026

City of Cape Coral

The City of Cape Coral’s North 3 Utilities Extension Project (UEP) is a multi-year infrastructure program to extend potable water, sewer, irrigation and build associated roads and stormwater improvements across roughly three square miles in northwest Cape Coral. The City states design is in progress (60–75% complete) and that bidding is anticipated around Summer 2026 with construction expected to begin by the end of 2026 and run approximately two years. As of 2026-06-26 no buyer-posted solicitation, bid package PDF, or formal bid close date was found on the City’s public procurement pages; the City indicates formal solicitations are published via its vendor/solicitation portal (OpenGov / IonWave).

Posted Date

-

Due Date

Aug 31, 2026

Carrollton Utilities

Project includes all Work required to rehabilitate and expand the existing wastewater treatment plant (WWTP) to an average daily treatment capacity of 2.5 million gallons per day (MGD). This Work involves comprehensive mechanical and electrical rehabilitation of critical treatment process components, as well as construction of new infrastructure to support increased capacity and improved operational performance. This Project includes the full mechanical and electrical rehabilitation of the existing clarifiers, Biotower trickling filters, ultraviolet (UV) disinfection system, lagoon liner, and electrical room. This Project also involves the modification of piping and valving systems associated with the Biotower process to improve flow control, operational flexibility, and system reliability. In addition to the rehabilitation efforts, the Project includes the construction of a new Biotower Pump Station and a new UV disinfection channel. See outside link.

Posted Date

-

Due Date

Aug 6, 2026

Caribou Utilities District

Provide professional engineering services for a comprehensive wastewater infrastructure improvement program serving the Caribou wastewater collection and treatment system. The program may include improvements to pump stations, force mains, wastewater treatment facilities, headworks infrastructure, SCADA systems, standby power systems, and associated appurtenances.

Posted Date

-

Due Date

Jul 31, 2026

Intermountain Regional Office, Region 4

The US Forest Service (Region 4 / Manti-LaSal National Forest) issued a synopsis/solicitation for installing water, sewer, and electrical utility lines and making connections to trailer pads in Monticello, UT. Work includes connecting a new 2" HDPE water line and a 6" sewer line to existing systems, coordinating transformer/meter installation with Empire Electric, and optional site work such as 36" trenching, crushed aggregate for trailer pads/roadway, and an asphalt apron. The procurement is a Small Business set-aside (NAICS 237110) with a fixed-price type scope and a response deadline in August 2026.

Posted Date

Jul 7, 2026

Due Date

Aug 10, 2026

Timeline Progress34%
Collier County

Seeking answering service.

Posted Date

Jul 13, 2026

Due Date

Aug 13, 2026

Timeline Progress18%
Prescott National Forest

This contract is comprised of installing utility lines, connections to existing lines and connections to trailer pads. Utilities included are electrical, water and sewer. Option items included are trenching, providing and spreading gravel and installation of an asphalt apron. Utilities – Water - The new water line will be connected to the existing water line between the meter and bunkhouse. Main water line will remain same size as existing line. Existing line is a 2” poly line. New water line will be a 2” HDPE blue Poly and connect to existing. One stop and waste to be installed within 5ft of new and existing line connection. Sewer – The new sewer line will be connected to the existing sewer line at the bunkhouse. Main line will be 6” with trailer connections being 6” to 3” Wye’s. Drainage must remain between 1/8” – ¼” per ft across the entirety of the line. Must meet state code. Electrical – A transformer and drop-down meter will need to be coordinated and installed with Empire Electric and conduit and wiring ran from meter to the trailer pads. Contractor will be responsible for determining sizing of conduit and wiring. Must meet state code.

Posted Date

Jul 7, 2026

Due Date

Aug 10, 2026

Timeline Progress34%
City of Irving

Install two GE Multilin 850 relays and two GE Multilin 869 relays.

Posted Date

Jun 5, 2026

Due Date

Jul 17, 2026

City of Waverly

Replacement of the Waverly Utilities boat ramp and parking lot located at Three Rivers Park.

Posted Date

Jul 7, 2026

Due Date

Jul 27, 2026

Timeline Progress58%
City of San Diego

The City of San Diego Public Utilities Department (Pure Water Operations Division) issued an RFP for bulk delivery of antiscalant (threshold inhibitor) on an as-needed basis to the North City Pure Water Facility for RO pretreatment. The solicitation is an RFP with both electronic and possible hard-copy submission requirements, includes a required onsite pre-bid meeting (06/30/2026) and an online Q&A deadline (07/02/2026). Proposals are due 07/17/2026 at 2:00 PM PDT and contact information is provided for the City procurement contact.

Posted Date

Jun 24, 2026

Due Date

Jul 17, 2026

City of Cape Coral

The City of Cape Coral’s North 3 Utilities Extension Project (UEP) is a multi-year infrastructure program to extend potable water, sewer, irrigation and build associated roads and stormwater improvements across roughly three square miles in northwest Cape Coral. The City states design is in progress (60–75% complete) and that bidding is anticipated around Summer 2026 with construction expected to begin by the end of 2026 and run approximately two years. As of 2026-06-26 no buyer-posted solicitation, bid package PDF, or formal bid close date was found on the City’s public procurement pages; the City indicates formal solicitations are published via its vendor/solicitation portal (OpenGov / IonWave).

Posted Date

-

Due Date

Aug 31, 2026

City of West Palm Beach

The City of West Palm Beach is seeking a qualified, experienced, and responsive firm to provide Dispatch Professional Answering Services for the City's Public Utilities Department. This RFP (No. 25.26.215 SS) is open and proposals must be submitted by 3:00 PM on July 30, 2026, with one original, one electronic version on a flash drive, and five copies in a sealed envelope. Solicitation documents are only available electronically and free of charge by registering on the City's third-party procurement site, DemandStar, and contact with anyone other than Procurement Division staff is grounds for disqualification.

Posted Date

Jul 7, 2026

Due Date

Jul 30, 2026

Timeline Progress51%
City of Spirit Lake

Work generally consists of approximately 2,138 linear feet of 8" PVC C900 Water Main installation and approximately 2,760 linear feet of 6" PVC C900 Sanitary Sewer Force Main installation to include, but not limited to: -Clearing and Grubbing -Full Depth Patches -Temporary Traffic Control -Erosion Control Items.

Posted Date

Jul 16, 2026

Due Date

Aug 6, 2026

Timeline Progress13%
Gulf Shores Utilities

The project includes the following work: construction of a new water treatment facility on an existing water treatment plant, associated process equipment, piping, concrete work, electrical work, instrumentation and controls, and civil/site work.

Posted Date

May 29, 2026

Due Date

Jul 30, 2026

Timeline Progress82%

Win More Utilities RFPs

Get AI-powered buying signals and real-time alerts for utilities opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available