Utilities RFPs
Find utilities RFP opportunities from public utility districts, municipal utilities, and utility commissions. Search solicitations for utility infrastructure, utility services, and utility management systems updated daily.
The City of Rio Rancho issued RFP 26-003-UT to establish on-call engineering services for its Utilities Department, covering land surveying and multiple engineering disciplines to support city facilities and infrastructure. The RFP is open with questions due May 28, 2026, and final submissions due June 18, 2026. Proposal materials and exhibits are available on the City’s official procurement portal, though registration is required for download.
Posted Date
Release: May 21, 2026
Due Date
Close: Jun 18, 2026
High Rock Utilities Upgrade
AvailableProject includes approx. 700 LF of 4" Sanitary Sewer Pipe Lining; 400 LF of 6" Sanitary Sewer Pipe Lining, Lumpsum of Install, Flush, and Pressure Test Potable Water Distribution System.
Posted Date
Release: Apr 30, 2026
Due Date
Close: Jun 3, 2026
Consists of underground utilities and leak detection services for commercial harbor facilities, statewide, on an open end, as needed basis.
Posted Date
Release: May 19, 2026
Due Date
Close: Jun 16, 2026
Work shall consist of cleaning all the exposed exterior surfaces for the requested water and wastewater storage tanks. This also includes facility exterior and interior surfaces of existing facilities. Exterior surface areas for tanks include but are not limited to; concrete foundations, concrete pedestals, concrete roof systems, steel columns, steel pedestals, steel tank bowls, catwalks, ladders, support members and accessories attached to the tank.
Posted Date
Release: May 18, 2026
Due Date
Close: Jun 27, 2026
Project work includes: Demolition, site work, utility, grading, electrical, ADA Restrooms fixtures, Door & wall finishes, sign,Roofing,plumbing, mechanical .
Posted Date
Release: May 22, 2026
Due Date
Close: Jun 10, 2026
The project includes renovation of the sanitary sewer and water systems and separation of the EBRPD sanitary sewer system and water supply from the adjacent Wellness Center property.
Posted Date
Release: Apr 23, 2026
Due Date
Close: Jun 24, 2026
Provide a crane truck.
Posted Date
Release: May 28, 2026
Due Date
Close: Jun 12, 2026
2026 21D Bury Private Utilities
AvailableConverting existing overhead electrical service to underground power to service hangar facilities and turf restoration.
Posted Date
Release: May 19, 2026
Due Date
Close: Jun 17, 2026
Seeking catalog or retail discounts from qualified vendors interested in supplying various supplies, parts and equipment as it specifically relates to water & wastewater utilities for the City Public Works Department and other City.
Posted Date
Release: May 16, 2025
Due Date
Close: May 31, 2029
2026 catchbasins, manholes, and streets & utilities improvements.
Posted Date
Release: May 11, 2026
Due Date
Close: Jun 3, 2026
Work includes to construct water main and gravity sanitary sewer main replacement, drainage installation, roadway restoration, curb, gutter and sidewalk restoration.
Posted Date
Release: Apr 24, 2026
Due Date
Close: Jun 2, 2026
Provide on-call professional engineering services.
Posted Date
Release: May 21, 2026
Due Date
Close: Jun 25, 2026
The City of Redlands seeks bids for on-call pavement repair services to remove temporary asphalt and install permanent pavement, including striping and traffic loops. The contract period is scheduled from July 1, 2026, through June 30, 2027, with an option for a one-year extension. Bids are due by June 4, 2026, and the project covers work within City streets and rights-of-way.
Posted Date
Release: May 14, 2026
Due Date
Close: Jun 4, 2026
Power Transformer: One (1) 13.44/17.92/22.4 MVA at 65°C, ONAN/ONAF/ONAF, 67 kV Delta to 13.8/7.97 GRDY with LTC and accessories.
Posted Date
Release: Apr 28, 2026
Due Date
Close: Jun 10, 2026
Pinellas County is soliciting professional engineering services for the design and post-design construction phase services for a new Utility Operations Center at the Logan Pumping Station Site. The project scope includes creating design plans, permitting, CMAR coordination, and construction-phase services for the new facility. This project is partially funded by a Hazard Mitigation Grant Program (HMGP), and the contract includes specific grant provisions for the construction phase.
Posted Date
Release: May 22, 2026
Due Date
Close: Jun 23, 2026
The project constructs potable water, sanitary sewer, and storm drainage utilities for the Warrior Training Center Foundry Facility at Fort Benning, Georgia. Work includes the installation of approximately 340 LF of 8-inch ductile iron potable water main, 760 LF of PVC/ductile iron sanitary sewer main, and a 19x30-inch HERCP storm pipe. The contract requires specific bonding and MWBE participation goals, with a scheduled completion date of June 25, 2026.
Posted Date
Release: May 21, 2026
Due Date
Close: Jun 25, 2026
Item A: street lighting fusing equipment. Item B: long light arms. Item C: street light foundation; for power installation. Item D: breakaway transformer bases; AASHTO approved for highway lighting. Item E: Cobra head street light - LED for roadway locations, 12,800 lumens. Item F: street light fixtures: post top mount. Item G: street light fixtures: LED roadway fixture, 34,000 lumens. Item H: roadway luminaire - 152-watt LED, type III optics. Item I: roadway luminaire - 152-watt LED, with photo controller. Item J: roadway luminaire - 152-watt LED, 20 - 277-volt. Item K: roadway luminaire - 152-watt LED, cobra head design. Item L: large teardrop LED, asymmetric bowl glass and door.
Posted Date
Release: May 21, 2026
Due Date
Close: Jun 9, 2026
Provide radio telemetry services.
Posted Date
Release: May 18, 2026
Due Date
Close: Jun 15, 2026
This project will replace the roof at veterinary medicine utilities boiler building with EPDM membrane material.
Posted Date
Release: -
Due Date
Close: Jun 11, 2026
Work consists of the installation and connection of electric meters and meter sockets, conduit, and miscellaneous assembles. The project also consists of removal of existing meter sockets, secondary conductor, conduit, and miscellaneous assemblies. The project includes the cutover of new and existing electric meters at residences and businesses to the new underground primary distribution system.
Posted Date
Release: May 12, 2026
Due Date
Close: Jun 9, 2026
Win More Utilities RFPs
Get AI-powered buying signals and real-time alerts for utilities opportunities