Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Seattle Public Utilities
Seattle Public Utilities (SPU) is seeking proposals from qualified consultant firms to provide on-call electrical engineering support services under RFP/Contract 26-114-S. The selected consultant(s) will provide electrical engineering design, analysis, and technical support for various SPU projects on an as-needed basis. This is an on-call/task-order type contract supporting SPU's electrical infrastructure needs during the 2025-2027 biennium.
Posted Date
Jul 11, 2026
Due Date
Aug 10, 2026
Release: Jul 11, 2026
Seattle Public Utilities
Close: Aug 10, 2026
Seattle Public Utilities (SPU) is seeking proposals from qualified consultant firms to provide on-call electrical engineering support services under RFP/Contract 26-114-S. The selected consultant(s) will provide electrical engineering design, analysis, and technical support for various SPU projects on an as-needed basis. This is an on-call/task-order type contract supporting SPU's electrical infrastructure needs during the 2025-2027 biennium.
AvailableSeattle Public Utilities
The City of Seattle, through its Seattle Public Utilities department, is seeking a contractor for the Water Main Rehabilitation Package 6 - North (PW#2024-054), valued at approximately $5,715,000. The project involves abandoning in-place existing watermains and installing new ductile iron watermain pipe (4- to 12-inch diameter) with valving, fire hydrants, and appurtenances at three different sites in Seattle, using open-trench and trenchless construction methods, along with storm drainage improvements, a pressure regulating station with SCADA monitoring, and related pavement/sidewalk restoration. This is a construction bid (not a grant program) being publicly advertised alongside parallel Central and South packages as part of SPU's ongoing watermain renewal program.
Posted Date
Jul 2, 2026
Due Date
Jul 29, 2026
Release: Jul 2, 2026
Seattle Public Utilities
Close: Jul 29, 2026
The City of Seattle, through its Seattle Public Utilities department, is seeking a contractor for the Water Main Rehabilitation Package 6 - North (PW#2024-054), valued at approximately $5,715,000. The project involves abandoning in-place existing watermains and installing new ductile iron watermain pipe (4- to 12-inch diameter) with valving, fire hydrants, and appurtenances at three different sites in Seattle, using open-trench and trenchless construction methods, along with storm drainage improvements, a pressure regulating station with SCADA monitoring, and related pavement/sidewalk restoration. This is a construction bid (not a grant program) being publicly advertised alongside parallel Central and South packages as part of SPU's ongoing watermain renewal program.
AvailableSeattle Public Utilities
This is a construction solicitation for the replacement of the existing culvert running beneath 45th Avenue SW in West Seattle, which carries Fauntleroy Creek and is at risk of failure, posted with reference PW#2025-017. The project includes civil demolition with in-stream bypass, tree protection, site work, stream work, grading, utility installation, roadway paving, landscaping, soldier pile shoring, cast-in-place concrete construction, and habitat restoration along Fauntleroy Creek. The engineer's estimate is approximately $26.2 million, with bids due July 29, 2026 at 2:00 PM PDT.
Posted Date
Jun 25, 2026
Due Date
Jul 29, 2026
Release: Jun 25, 2026
Seattle Public Utilities
Close: Jul 29, 2026
This is a construction solicitation for the replacement of the existing culvert running beneath 45th Avenue SW in West Seattle, which carries Fauntleroy Creek and is at risk of failure, posted with reference PW#2025-017. The project includes civil demolition with in-stream bypass, tree protection, site work, stream work, grading, utility installation, roadway paving, landscaping, soldier pile shoring, cast-in-place concrete construction, and habitat restoration along Fauntleroy Creek. The engineer's estimate is approximately $26.2 million, with bids due July 29, 2026 at 2:00 PM PDT.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Chief Financial Officer (Financial and Risk Services)
Chief Operating Officer – Drainage and Wastewater & Logistics
Premium
Access the largest public sector contact database
© 2026 Starbridge