RFP Catalog/Utilities

Utilities RFPs

Find utilities RFP opportunities from public utility districts, municipal utilities, and utility commissions. Search solicitations for utility infrastructure, utility services, and utility management systems updated daily.

Mecklenburg County

The scope of work includes demolition, grading, utilities, prefabricated bridge installation, hardscape, planting, and other site improvements.

Posted Date

-

Due Date

Jun 2, 2026

City of Bainbridge Island

2026 small works roster. Proposed work includes roads, transportation, utilities, facilities, and other construction and repair projects.

Posted Date

Jan 7, 2026

Due Date

Dec 31, 2026

Timeline Progress40%
Big Cypress Stewardship District

Proposed project described, which may include but not be limited to earthwork, stormwater management, utilities, vehicular & pedestrian bridges and roadway.

Posted Date

May 7, 2026

Due Date

Jun 8, 2026

Timeline Progress77%
Village of Pellston

Construction of a 150,000 gallon elevated water tank with appurtenances, associated utilities including 12" diameter watermain, and site improvements.

Posted Date

May 22, 2026

Due Date

Jun 22, 2026

Timeline Progress31%
University Of Florida

Project includes Concrete Foundations, HVAC (Sitework), Electrical (Sitework), Sitework & Utilities, Ground Improvements (Auger Cast Piles).

Posted Date

May 26, 2026

Due Date

Jun 10, 2026

Timeline Progress38%
City of De Witt

Demolition of properties. Environmental abatement, disposal of asbestos and hazardous materials, select structure demolition, disconnection of utilities, and Site restoration.

Posted Date

May 11, 2026

Due Date

Jun 3, 2026

Timeline Progress90%
Nevada State Public Works Board

New west bound travel lane, raised medians, misc entrance center paving, misc underground utilities, new fee booth.

Posted Date

May 23, 2026

Due Date

Jun 18, 2026

Timeline Progress34%
Mountain Area Regional Transit Authority

Invitation to bid for the construction of a new one-story bus service facility administration office building, including related site work, grading, and underground utilities.

Posted Date

-

Due Date

Oct 31, 2027

City of Lynn Haven

The work of this contract generally includes improvements, modifications, and additions to: streetscape, lighting, landscape and irrigation, hardscape, roadway improvements, signage, and minor utilities and site furnishings.

Posted Date

May 13, 2026

Due Date

Jun 30, 2026

Timeline Progress39%
Borough of Wilson

1.5" mill and overlay on two (2) Borough Roads. Protecting existing trees and vegetation to remain; Removing trees and other vegetation; Clearing and grubbing and pavement removal; Topsoil stripping; Removing above-grade site improvements; Disconnecting, capping or sealing, and abandoning site utilities in place; Disconnecting, capping or sealing, and removing site utilities; Saw cutting existing pavement, curb, sidewalk, etc. as required at the limits of the proposed construction.

Posted Date

May 7, 2026

Due Date

Jun 16, 2026

Timeline Progress62%
Town of Mukwonago

The project includes grading, erosion control, pavement installation, and building construction. The utilities for the buildings will be installed via an existing water service nearby and a proposed septic field.

Posted Date

Mar 3, 2026

Due Date

Jun 3, 2026

Timeline Progress98%
Vancouver City Housing Authority

Work includes but is not limited to, 625 LF of new residential arterial roadway, sidewalks, stormwater facilities, street lighting, flashing beacon crossing and associated underground utilities.

Posted Date

May 5, 2026

Due Date

Jun 4, 2026

Timeline Progress89%
U.S. Army Engineer District New Orleans

The work consists of the removal and satisfactory disposal of dredged material excavated from the Tiger Pass Bar Channel and identification of utilities, within the limits shown on the contract drawings.

Posted Date

Feb 6, 2025

Due Date

Feb 5, 2027

Timeline Progress66%
Borough of Elizabethtown

Emergency and maintenance work for the Borough owned utilities, including but not limited to the Owner’s existing sanitary sewer and storm sewer collection and conveyance systems to include repair of existing facilities

Posted Date

May 14, 2026

Due Date

Jun 16, 2026

Timeline Progress54%
Lucia Mar Unified School District

The project consists of the construction of an approx 2,800 SF classroom building and associated site work, including walkways, ramps, accessibility upgrades and associated above grade and underground utilities.

Posted Date

Apr 26, 2026

Due Date

Jun 30, 2026

Timeline Progress55%
City of Kalamazoo

Consist of removing the existing catwalks over the four(4) clarifiers; removing and disconnecting the existing utilities before removal of the catwalk; cleaning the existing bearing pads; furnishing and installing new steel joists; reinstalling the existing catwalks onto the new steel joists; reinstalling and reconnecting all utilities; and furnishing and installing two (2) new life-safety throw rings with post and not less than one hundred fifty (150) feet of rope.

Posted Date

May 9, 2026

Due Date

Jun 9, 2026

Timeline Progress73%
Aldine Independent School District

Work consist of civil site work package for the new education and performing arts center building. Package B includes utilities, site-work and site paving for the new building.

Posted Date

May 15, 2026

Due Date

Jun 10, 2026

Timeline Progress64%
Lakes Highway District #2

Construct one new building primarily for brine storage and production with a small break area and restroom for employees. Work includes site development and tying buildings into new and existing utilities.

Posted Date

May 15, 2026

Due Date

Jun 4, 2026

Timeline Progress84%
Cobb County School District

Consists of the demolition of the existing softball field house and associated infrastructure. Construction of a new fieldhouse with locker room, restrooms, storage rooms, and office. Sitework will include new utilities for the site.

Posted Date

May 5, 2026

Due Date

Jun 4, 2026

Timeline Progress89%
The University of Alabama

Work involves replacing 14" thermal hot water piping, excavation, and road restorationGeneral Contractors and Prime Sitework/Utilities Contractors are required to prequalify prior to bidding or performing work.

Posted Date

May 17, 2026

Due Date

Jun 9, 2026

Timeline Progress64%

Win More Utilities RFPs

Get AI-powered buying signals and real-time alerts for utilities opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available