Utilities RFPs
Find utilities RFP opportunities from public utility districts, municipal utilities, and utility commissions. Search solicitations for utility infrastructure, utility services, and utility management systems updated daily.
Legionella Water Testing
AvailableProvide consolidated water utilities management services by conducting cwum sustainability services, validation sampling and testing, equipment servicing, continuous water monitoring, and web-based data management.
Posted Date
Release: Apr 15, 2026
Due Date
Close: Jun 10, 2026
Emergency and maintenance work for the township owned utilities, including but not limited to the owner s existing sanitary sewer and storm sewer collection and conveyance systems to include repair of existing facilities.
Posted Date
Release: Apr 22, 2026
Due Date
Close: Jun 22, 2026
Demolition on the site includes structures, foundations, paving, utilities, and other improvements to the site as well as hazardous material removal prior to demolition. Backfilling and grading will be required. See outside link.
Posted Date
Release: -
Due Date
Close: Jun 24, 2026
Annual Procurement of Wire & Cable
AvailableGainesville Regional Utilities (GRU) issued RFP 2026-067 to establish a multi-year supply contract for various groups of wire and cable. The buyer seeks suppliers to furnish one or more groups of wire and cable to generate supply-chain efficiencies and reduce total cost of ownership. Responses are due June 18, 2026 at 2:00 PM Eastern, and the project lists Gainesville Regional Utilities (301 SE 4th Avenue, Gainesville, FL) as the place of performance.
Posted Date
Release: May 19, 2026
Due Date
Close: Jun 18, 2026
Work consist of demolition, concrete, site structural, roofing, thermal & moisture protection, doors & windows, conveying systems, aluminum and glazing, equipment, fire protection, plumbing, hvac, electrical, utilities.
Posted Date
Release: -
Due Date
Close: Jun 24, 2026
To stabilize and transform the approx. 150,000 SF industrial building, situated on 15 acres, into a mix of office and industrial uses. LCRA maintains security guard presence 24/7. Utilities are operational.
Posted Date
Release: May 11, 2026
Due Date
Close: Jun 2, 2026
East Palestine Train Depot Project
AvailableWork inlcudes new utilities and service connections, electrical, hvac, plumbing, bathrooms, kitchen installation, insulation, floor improvements, exterior drainage and sidewalk replacement, building expansion and concrete patios.
Posted Date
Release: May 6, 2026
Due Date
Close: Jun 3, 2026
Dobbins New Relocatable Classroom
AvailableWork includes demolition, grading, paving, building pad preparation, walkways, and related work for the complete installation of one 50'x52' relocatable classroom. Project includes utilities and fire alarm.
Posted Date
Release: May 1, 2026
Due Date
Close: Jun 1, 2026
Lease of municipal lands for a communications facility, including associated ground equipment area, access, and utilities, all as more fully set forth in the Bid Package and Form of Land Lease Agreement.
Posted Date
Release: May 12, 2026
Due Date
Close: Jun 10, 2026
Fairmont State University is seeking proposals for a comprehensive Campus Facilities Master Plan to guide future physical development, encompassing facilities, infrastructure, utilities, space allocation, transportation, safety, signage, and sustainability.
Posted Date
Release: May 8, 2026
Due Date
Close: Jun 12, 2026
Demolition of Pine Middle School
AvailableDemolition of school building with the removal of all associated site features, including concrete, asphalt surfaces, tennis courts, fencing, monument sign, vegetation, underground utilities, and two (2) storage containers.
Posted Date
Release: Apr 17, 2026
Due Date
Close: Jun 2, 2026
2026 7th & Well Reconstruction
AvailableReconstruction will install 700' of water main, 1,470' of sanitary sewer, and 760' of storm sewer utilities. Project will also include asphalt pavement, concrete curb & gutter and aprons, restoration, and traffic control.
Posted Date
Release: May 21, 2026
Due Date
Close: Jun 9, 2026
Work includes excavation, site utilities, concrete, precast, misc. Metals, metal roofing, siding, doors, coiling door, painting/coating, equipment, instrumentation, plumbing/process piping, hvac, and electrical.
Posted Date
Release: May 22, 2026
Due Date
Close: Jun 5, 2026
Project includes but is not limited to: Removal and replacement of four rooftop units (cooling only) and their associated curbs, controls and utilities. Demolition of existing, in-line hydronic coils and piping. Demo and replacement of existing exhaust fans.
Posted Date
Release: Apr 20, 2026
Due Date
Close: Jun 4, 2026
Community Solar Port of Ridgefield
AvailableDesign, supply, and install a PV system on the rooftop of the building at the Port of Ridgefield as part of the Clark Public Utilities Community Solar at the Port of Ridgefield Program. Aggregate PV DC capacity shall be 180 kW.
Posted Date
Release: May 14, 2026
Due Date
Close: Jun 5, 2026
Additional Hydraulic Improvements
AvailableProvide construction of two riffle structures within the river, replacement of storm sewers and structures, demolition of water, sanitary gas utilities, monitoring wells, northern pedestrian bridge ramp, and the excavation of a floodplain bench.
Posted Date
Release: May 26, 2026
Due Date
Close: Jun 23, 2026
This RFP is for vegetation control spraying services for 18 electric utility substations (bare ground treatment) and approximately 800 miles of distribution line rights-of-way (grass-friendly treatment) for the Orangeburg Department of Public Utilities.
Posted Date
Release: Apr 21, 2026
Due Date
Close: Jul 21, 2026
Citywide Janitorial Services (RFP)
AvailableProvide comprehensive janitorial, sanitation, custodial, and related support services for city-owned parks, buildings, facilities, public restrooms, public pools, administrative offices, the employee medical health center, and public works and utilities operations.
Posted Date
Release: May 18, 2026
Due Date
Close: Jun 18, 2026
Seeking bids for selective demolition services. Phase 1 (remediation): all ACM abatement, household hazardous waste (HHW)/universal waste removal, shall be performed from within the buildings; phase 2 (utilities): disconnect all utilities (gas, sewer, electrical) and cap them incompliance with local codes; phase 3 (demolition & removal): demolition of ancillary buildings and foundations and removal of all demolished materials from the site as described in exhibits a2 and a3; phase 4 (restoration): backfill, site grading, seeding, strawing, and final site restoration.
Posted Date
Release: May 19, 2026
Due Date
Close: Jun 9, 2026
Work includes : horizontal directional drilling to furnish and install HDPE conduits of varying sizes in a joint utility trench for the purpose of relocating existing overhead utilities and other utility lines that conflict with planned public improvement project work.
Posted Date
Release: May 15, 2026
Due Date
Close: Jun 2, 2026
Public preview limited to 5 pages
Starbridge customers get unlimited access to thousands of opportunities, contact data, and competitive intelligence.
Book a Demo →Win More Utilities RFPs
Get AI-powered buying signals and real-time alerts for utilities opportunities