Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Fort Pierce Utilities Authority
Procurement of approximately 125,400 lbs (11,000 gallons) annually of Ortho/Polyphosphate Blended Liquid (Corrosion Inhibitor) for the Fort Pierce Utilities Authority Water Treatment Plant.
Posted Date
-
Due Date
Jul 24, 2026
Fort Pierce Utilities Authority
Close: Jul 24, 2026
Procurement of approximately 125,400 lbs (11,000 gallons) annually of Ortho/Polyphosphate Blended Liquid (Corrosion Inhibitor) for the Fort Pierce Utilities Authority Water Treatment Plant.
AvailableFort Pierce Utilities Authority
Fort Pierce Utilities Authority (FPUA) is accepting proposals from qualified, licensed, and insured contractors for the turnkey installation of two predesigned blast wall enclosures to protect an above ground gasoline/diesel fuel tank and a liquefied natural gas (LNG) fueling station tank at the Energy Services Center (ESC) located at 1701 South 37th Street, Fort Pierce, FL. The scope of work includes hazard modeling (blast, thermal, dispersion), full structural and civil design, permitting, regulatory submittals, materials procurement, construction, commissioning, and project closeout, with bonds required. The project must comply with HUD, NFPA 30, NFPA 59A, UFC, API RP 752/753, and Florida Building Code wind-borne debris standards, with an estimated completion date of approximately March 1, 2027.
Posted Date
Jun 23, 2026
Due Date
Aug 11, 2026
Release: Jun 23, 2026
Fort Pierce Utilities Authority
Close: Aug 11, 2026
Fort Pierce Utilities Authority (FPUA) is accepting proposals from qualified, licensed, and insured contractors for the turnkey installation of two predesigned blast wall enclosures to protect an above ground gasoline/diesel fuel tank and a liquefied natural gas (LNG) fueling station tank at the Energy Services Center (ESC) located at 1701 South 37th Street, Fort Pierce, FL. The scope of work includes hazard modeling (blast, thermal, dispersion), full structural and civil design, permitting, regulatory submittals, materials procurement, construction, commissioning, and project closeout, with bonds required. The project must comply with HUD, NFPA 30, NFPA 59A, UFC, API RP 752/753, and Florida Building Code wind-borne debris standards, with an estimated completion date of approximately March 1, 2027.
AvailableFort Pierce Utilities Authority
Fort Pierce Utilities Authority (FPUA) is accepting proposals from qualified, licensed, and insured contractors for the turnkey installation of two predesigned blast wall enclosures to protect an above ground gasoline/diesel fuel tank and a liquefied natural gas (LNG) fueling station tank at the Energy Services Center (ESC) located at 1701 South 37th Street, Fort Pierce, FL. The scope of work includes hazard modeling (blast, thermal, dispersion), full structural and civil design, permitting, regulatory submittals, materials procurement, construction, commissioning, and project closeout, with bonds required. The project must comply with HUD, NFPA 30, NFPA 59A, UFC, API RP 752/753, and Florida Building Code wind-borne debris standards, with an estimated completion date of approximately March 1, 2027.
Posted Date
Jun 23, 2026
Due Date
Aug 11, 2026
Release: Jun 23, 2026
Fort Pierce Utilities Authority
Close: Aug 11, 2026
Fort Pierce Utilities Authority (FPUA) is accepting proposals from qualified, licensed, and insured contractors for the turnkey installation of two predesigned blast wall enclosures to protect an above ground gasoline/diesel fuel tank and a liquefied natural gas (LNG) fueling station tank at the Energy Services Center (ESC) located at 1701 South 37th Street, Fort Pierce, FL. The scope of work includes hazard modeling (blast, thermal, dispersion), full structural and civil design, permitting, regulatory submittals, materials procurement, construction, commissioning, and project closeout, with bonds required. The project must comply with HUD, NFPA 30, NFPA 59A, UFC, API RP 752/753, and Florida Building Code wind-borne debris standards, with an estimated completion date of approximately March 1, 2027.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Fort Pierce Utilities Authority
The Board discussed and approved various operational and administrative items, including an insurance policy update for the Mainland Water Reclamation and Reuse Facility and an award of bid for the supply of Anhydrous Ammonia. Key approvals included a contract for dedicated internet access, a communications cloud service agreement, and a facility use agreement for 4th of July fireworks. Additionally, the Board authorized a mural project at Jaycee Park, accepted grant funding for wastewater treatment plant relocation, and approved website redesign services. Other actions involved supporting a grant application for the Manatee Center, reviewing community activities, and settling PFAS litigation. The Board also approved an amendment for a force main extension and transformer replacements at the Totten Substation.
The board discussed and took action on several items including the approval of a service agreement for generator maintenance, the authorization of make-ready work for telecommunications attachments on utility poles, the approval of a wastewater expansion project on West 1st Street, and the renewal of an enterprise advantage program agreement with ESRI. Additionally, the board approved various construction and engineering agreements, including roadway illumination services, force main design services, and amendments to compliance management contracts, alongside an assignment agreement for gas capacity.
The agenda focuses on educational presentations regarding wastewater basics, an introduction of a new intern, and an acknowledgement of the former committee chairman. A significant portion of the agenda is dedicated to a formal letter of support for the Wastewater Treatment Plant Relocation and Reuse Project, highlighting the community benefits, environmental impacts, and the importance of securing state appropriations for the initiative. The meeting also includes standard committee and staff reporting sessions.
The committee discussed the fiber expansion strategy, community access initiatives, and the implementation of a Brand Ambassador program to promote FPUAnet. The discussion included details on infrastructure deployment, competitive positioning, and the use of neighborhood registration data to drive expansion planning. The committee also signed letters of appreciation for former members and voted to approve a letter of support for the SPARC Electric Grant, which aims to fund upgrades to electric lines, breakers, and transformers. Additionally, staff provided highlights on upcoming community events and budget workshops.
The Board meeting included discussions on several key items: the design services for the new Island Lift Station (Phase 1), gate maintenance and repairs, and a five-year preventative maintenance contract for the ESC Building UPS. Additionally, the Board reviewed lawn and ground maintenance contracts for the Water Reclamation and Refuse Facility, an illumination agreement with the Florida Department of Transportation, and budget requests for the Sunrise Village PUD. Regulatory and policy matters addressed included an interlocal agreement with the Town of St. Lucie Village for potable water construction, the adoption of a Contribution in Aid of Construction credit policy, electric line extension agreements, and amendments to organizational rules and regulations.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Fort Pierce Utilities Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge