Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Princeton Public Utilities
Work consists of the installation and connection of electric meters and meter sockets, conduit, and miscellaneous assembles. The project also consists of removal of existing meter sockets, secondary conductor, conduit, and miscellaneous assemblies. The project includes the cutover of new and existing electric meters at residences and businesses to the new underground primary distribution system.
Posted Date
May 12, 2026
Due Date
Jun 9, 2026
Release: May 12, 2026
Princeton Public Utilities
Close: Jun 9, 2026
Work consists of the installation and connection of electric meters and meter sockets, conduit, and miscellaneous assembles. The project also consists of removal of existing meter sockets, secondary conductor, conduit, and miscellaneous assemblies. The project includes the cutover of new and existing electric meters at residences and businesses to the new underground primary distribution system.
AvailablePrinceton Public Utilities
This solicitation requests site-grading, earthwork and utility-installation work to prepare the Sioux Center generation site, including excavation/embankment, building excavation/borrow, placement of topsoil, installation of storm, sanitary and water services, pavement patching, and site restoration. The project was posted in mid-January 2026 and is a construction procurement (not a grant); contractors must provide labor, materials, equipment, and bonds and follow the project specifications. The official posting is available via the buyer's QuestCDN posting (linked above) where submission instructions and any bid documents/addenda must be obtained and verified.
Posted Date
Jan 14, 2026
Due Date
Feb 11, 2026
Release: Jan 14, 2026
Princeton Public Utilities
Close: Feb 11, 2026
This solicitation requests site-grading, earthwork and utility-installation work to prepare the Sioux Center generation site, including excavation/embankment, building excavation/borrow, placement of topsoil, installation of storm, sanitary and water services, pavement patching, and site restoration. The project was posted in mid-January 2026 and is a construction procurement (not a grant); contractors must provide labor, materials, equipment, and bonds and follow the project specifications. The official posting is available via the buyer's QuestCDN posting (linked above) where submission instructions and any bid documents/addenda must be obtained and verified.
Princeton Public Utilities
Construction of mainline and residential underground electric distribution lines including primary, secondary, and service circuitry; and the installation of cables, box pads, and other related equipment and material.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Princeton Public Utilities
Close: Jan 14, 2026
Construction of mainline and residential underground electric distribution lines including primary, secondary, and service circuitry; and the installation of cables, box pads, and other related equipment and material.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Princeton Public Utilities
The commission discussed adding a resolution to allow bid advertisements for an electric meter project. A new standing agenda item was established to facilitate regular communication between the commission and the city council liaison. Additionally, the commission reviewed department reports and discussed the current commercial deposit policy, including the potential implementation of application fees and background checks for new commercial accounts.
The commission held a regular meeting that included the swearing-in of a new commissioner and a discussion on official chair and vice-chair positions, clarifying that the vice-chair assumes the chair role in the event of a vacancy. The agenda also included reports from department superintendents regarding utility equipment and material updates, such as the CAT plant and electric department projects. Additionally, there was a discussion on the status of EV charging stations and a comprehensive review of the ongoing transition to new financial reporting software, which will include redesigned general ledger accounts to improve transparency and future financial reporting.
The Commission discussed several key items including the transition to a new billing software, the impact of Winter Storm Fern on financial operations, and necessary updates to EV charging rates to comply with state laws regarding energy-based billing. Additionally, the meeting covered project updates such as the Third Street Reconstruction, PFAS management proposals, and the upcoming capital improvements plan. The Commission also reviewed internal reports from the General Manager and various department superintendents, and discussed potential financial reporting policies and committee updates.
The agenda for the meeting includes reviewing and potentially approving the minutes from the January 28, 2026, Regular Meeting and the certification of accounts payable. Reports cover the General Manager's overview, financial statements (Income Statement, Balance Sheet, Trial Balance, Cash Reserves), and updates on SMMPA and EV Chargers. Key items on the regular agenda include discussion and authorization regarding the Third Street Bid Package, the impact of Winter Storm Fern, next steps for PFAS management including a Phase 3 proposal from Bolton & Menk, a review of 2025 financials, an update to the City Council, and the postponement of the March Commission Meeting to April 1, 2026.
The meeting commenced with a roll call, noting one commissioner was attending remotely. Key discussions included the approval of the agenda, following a motion and second. Public comment was provided by an attendee regarding a required $700 utility deposit for a new small business space, which they believed was excessive given the low annual utility costs. The commission acknowledged the concern and agreed to have staff review the deposit policy for future consideration, though current policy required the deposit to avoid service interruption. The consent agenda was approved, including discussion regarding the reimbursement process for SIMPA energy interest rebate program costs. Under the regular agenda, discussion centered on the Third Street bid package, which included road, sewer, and stormwater components, as well as a water main improvement. An alternate bid for redoing part of 14th Avenue was included for review. The commission approved the bidding process based on the engineering firm's memo. Additionally, there was a discussion concerning the impact of recent winter storms (e.g., Storm Fern) on the energy system due to extreme cold temperatures, noting that all member units were called upon to run for extended periods.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Princeton Public Utilities's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge