Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This solicitation requests site-grading, earthwork and utility-installation work to prepare the Sioux Center generation site, including excavation/embankment, building excavation/borrow, placement of topsoil, installation of storm, sanitary and water services, pavement patching, and site restoration. The project was posted in mid-January 2026 and is a construction procurement (not a grant); contractors must provide labor, materials, equipment, and bonds and follow the project specifications. The official posting is available via the buyer's QuestCDN posting (linked above) where submission instructions and any bid documents/addenda must be obtained and verified.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Sioux Center (Sioux Center Municipal Utilities) is soliciting contractors to perform comprehensive site grading and utility work to prepare a new generation site, including excavation, embankment, topsoil placement, storm/sanitary/water service installation, pavement patching, and site restoration. The solicitation was posted on 2026-01-14 and proposals are due by 2026-02-12; full plans/specs are hosted on QuestCDN (posting is password-protected). The estimated contract value is approximately $500,000–$1,000,000 and this is a single project solicitation (not a grant).
Posted Date
Jan 14, 2026
Due Date
Feb 12, 2026
Release: Jan 14, 2026
Close: Feb 12, 2026
The City of Sioux Center (Sioux Center Municipal Utilities) is soliciting contractors to perform comprehensive site grading and utility work to prepare a new generation site, including excavation, embankment, topsoil placement, storm/sanitary/water service installation, pavement patching, and site restoration. The solicitation was posted on 2026-01-14 and proposals are due by 2026-02-12; full plans/specs are hosted on QuestCDN (posting is password-protected). The estimated contract value is approximately $500,000–$1,000,000 and this is a single project solicitation (not a grant).
AvailableThe North Carolina Department of Public Safety – North Carolina National Guard (CFMO) seeks professional engineering/architectural services for the Camp Butner Training Center cantonment site grading project. Scope includes realigning a gravel road intersection with Roberts Chapel Road, utility corridor realignment for future development, additional gravel parking, and preparation of four building pads. Letters of Interest and SF-254 are requested; the total project budget is approximately $2,016,000, with proposals due January 26, 2026 at 4:00 pm local time.
Posted Date
Dec 18, 2025
Due Date
Jan 26, 2026
Release: Dec 18, 2025
Close: Jan 26, 2026
The North Carolina Department of Public Safety – North Carolina National Guard (CFMO) seeks professional engineering/architectural services for the Camp Butner Training Center cantonment site grading project. Scope includes realigning a gravel road intersection with Roberts Chapel Road, utility corridor realignment for future development, additional gravel parking, and preparation of four building pads. Letters of Interest and SF-254 are requested; the total project budget is approximately $2,016,000, with proposals due January 26, 2026 at 4:00 pm local time.
The intersection safety will be improved by realigning two driveways, requiring demolition and new construction of approximately 800 LF of gravel road. Will require demolition and construction of ditches, earthen berms, sidewalks and gates. New intersection will incorporate pedestrian crossing with signage and area lighting. Includes realigning utilities along the new gravel roadway, ensuring adequate and ready availability of water, sewer, electrical and communications for future connections. All utilities are available within the project site; however, location and capacity planning will be required. Site work also includes addition of approximately 20,000 SF of gravel parking area and four (4) building pads for future buildings (2 x 2,000 SF and 2 x 5,000 SF).
Posted Date
Dec 18, 2025
Due Date
Jan 26, 2026
Release: Dec 18, 2025
Close: Jan 26, 2026
The solicitation requests comprehensive site grading at the Southeast Substation site, including supplying labor, materials, and equipment, installation of fill, placement of gravel surfacing, and erosion control (silt fences). Janesville Utilities is issuing the solicitation to prepare the substation site for further construction or use. The posting was made in mid-January 2026 and the response deadline is in early February 2026.
Posted Date
Jan 13, 2026
Due Date
Feb 3, 2026
Release: Jan 13, 2026
Close: Feb 3, 2026
The solicitation requests comprehensive site grading at the Southeast Substation site, including supplying labor, materials, and equipment, installation of fill, placement of gravel surfacing, and erosion control (silt fences). Janesville Utilities is issuing the solicitation to prepare the substation site for further construction or use. The posting was made in mid-January 2026 and the response deadline is in early February 2026.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →The intersection safety will be improved by realigning two driveways, requiring demolition and new construction of approximately 800 LF of gravel road. Will require demolition and construction of ditches, earthen berms, sidewalks and gates. New intersection will incorporate pedestrian crossing with signage and area lighting. Includes realigning utilities along the new gravel roadway, ensuring adequate and ready availability of water, sewer, electrical and communications for future connections. All utilities are available within the project site; however, location and capacity planning will be required. Site work also includes addition of approximately 20,000 SF of gravel parking area and four (4) building pads for future buildings (2 x 2,000 SF and 2 x 5,000 SF).
Available