Gogebic Range Trail Authority - Snowmobile Trail 2 Reconstruction RFP
Posted
Sep 15, 2026
Oct 1, 2026
Work includes approx. of 2,943 CY of embankment, CIP; 2,822 CY of excavation, earth; 50 CY of excavation, rock; 9,248 LF of erosion control, silt fence; 4,141 TON of aggregate surface CSE; 24 FT of culv, CL A, conc, 36"; 32 LF of gurdrail, reconst, type B; 50 EA of channelizing device, 42", fluorescent, furn; 50 EA of channelizing device, 42", fluorescent, oper; 288 SF of sign, type B, temp, prismatic, furn; 288 SF of sign, type B, temp, prismatic, oper; 5,531 SY of slope restoration, non-freeway, type C.