Installation of Fiber Optic Cables at the Shorrock St. Well Field RFP
Aug 6, 2026
Closes
Aug 18, 2026
Installation of fiber optic cabling at the Well Field as follows: 48-strand single mode fiber from head end to first manhole; splice in manhole, then distribute (4) 12-strand single mode fiber runs — one to each well location; 1 FIS large outdoor splice case; 48 fusion splices; 2U CCH for SCADA head end; 4 WM boxes; 8 12-port LC couplers; 50 LC pigtails; 10 x 2-meter single mode fiber optic patch cords (included in scope); LTMUA to open manholes as needed.