Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Erosion Control Improvements include approx. 3,990 LF of silt fence, 8,240 LF of curlex matting, and all related miscellaneous items and appurtenances. Earthwork Improvements include approx. 63,105 CY of unclassified excavation, 13,680 CY of clay pond liner, processing and placement of 13,169 CY of utility spoils, and all related miscellaneous items and appurtenances. Utility Improvements include approx. 6,640 LF of 12" to 8" PVC water, 3,475 LF of 8" sanitary sewer, 4,447 LF of 7' x 5' RCB through 18" RCP onsite storm sewer, 155 LF of 8' x 4' RCB and 18" RCP storm sewer, and all related miscellaneous items and appurtenances. Paving Improvements include approx. 20,458 SY of 6"- 3,600 psi concrete street pavement and bike lane on approx. 19,821 SY of 6" lime stabilized subgrade, signage, striping, intersection traffic signals, and all related miscellaneous items and appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes Approx 60,000 CY of Unclassified Excavation and Placement of Fill Approx 277 lots of Moisture Conditioning, Erosion Control to Support Excavation.
Posted Date
Dec 6, 2025
Due Date
Dec 23, 2025
Release: Dec 6, 2025
Close: Dec 23, 2025
Work includes Approx 60,000 CY of Unclassified Excavation and Placement of Fill Approx 277 lots of Moisture Conditioning, Erosion Control to Support Excavation.
AvailableDistrictwide paving improvements.
Posted Date
Nov 20, 2025
Due Date
Dec 17, 2025
Release: Nov 20, 2025
Close: Dec 17, 2025
Districtwide paving improvements.
AvailablePaving maintenance, improvements and stormwater construction project.
Posted Date
Nov 20, 2025
Due Date
Dec 17, 2025
Release: Nov 20, 2025
Close: Dec 17, 2025
Paving maintenance, improvements and stormwater construction project.
AvailableProposed contract includes erosion control projects at six (6) different locations in the City of Dallas. The erosion control projects include construction of gabion walls with varying heights and lengths and rock ripraps along different creek banks.
Posted Date
Nov 26, 2025
Due Date
Dec 19, 2025
Release: Nov 26, 2025
Close: Dec 19, 2025
Proposed contract includes erosion control projects at six (6) different locations in the City of Dallas. The erosion control projects include construction of gabion walls with varying heights and lengths and rock ripraps along different creek banks.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis