Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Celina
Installation of additional uv disinfection trains and associated appurtenances in existing uv channels and new control appurtenances are included. An electrical distribution facility is provided with a standby power generator unit. Sludge transfer pumps direct solids from the existing sludge holding tanks to a sludge dewatering facility that uses belt press technology to dewater the sludge. See outside link.
Posted Date
Apr 17, 2026
Due Date
May 26, 2026
Release: Apr 17, 2026
City of Celina
Close: May 26, 2026
Installation of additional uv disinfection trains and associated appurtenances in existing uv channels and new control appurtenances are included. An electrical distribution facility is provided with a standby power generator unit. Sludge transfer pumps direct solids from the existing sludge holding tanks to a sludge dewatering facility that uses belt press technology to dewater the sludge. See outside link.
AvailableCity of Celina
The City of Celina is soliciting bids for the procurement of various water and wastewater parts and accessories, including brass parts, nipples, and stormwater lids. This invitation to bid is a renewal and addendum for North Texas Winwater supplies. The solicitation is currently open for submissions until April 21, 2026.
Posted Date
Mar 31, 2026
Due Date
Apr 21, 2026
Release: Mar 31, 2026
City of Celina
Close: Apr 21, 2026
The City of Celina is soliciting bids for the procurement of various water and wastewater parts and accessories, including brass parts, nipples, and stormwater lids. This invitation to bid is a renewal and addendum for North Texas Winwater supplies. The solicitation is currently open for submissions until April 21, 2026.
City of Celina
Work consist of 43 LF of 12" PVC water line by open cut, 97 LF of 12" PVC restrained water line with casing spacers, 97 LF of 24" steel casing by bore, 2 EA of connect to existing 12" water line, remove and dispose of existing 12" water line and damaged concrete embedment, 3 CY of grout and abandon-in-place existing 12" water line, 43 LF of trench safety, 43 LF of seeding, fertilizer, and erosion control.
Posted Date
-
Due Date
Apr 13, 2026
Release: -
City of Celina
Close: Apr 13, 2026
Work consist of 43 LF of 12" PVC water line by open cut, 97 LF of 12" PVC restrained water line with casing spacers, 97 LF of 24" steel casing by bore, 2 EA of connect to existing 12" water line, remove and dispose of existing 12" water line and damaged concrete embedment, 3 CY of grout and abandon-in-place existing 12" water line, 43 LF of trench safety, 43 LF of seeding, fertilizer, and erosion control.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $50,000, use sole source.
Coops: If your product is on Sourcewell, OMNIA Partners, or BuyBoard, use that vehicle to piggyback and buy now.
City of Celina rarely uses sole source above the standard $50,000 competitive bidding threshold. A notarized vendor affidavit is required and justification must be strong.
Board meetings and strategic plans from City of Celina
The City Council discussed and adopted the budget for FY 2025-2026, focusing on key areas such as fiscal sustainability, public safety, development-related operations, infrastructure maintenance, and employee compensation and benefits. The budget includes investments in new resources for the Police and Fire Departments, improvements to development services, and maintenance of streets, drainage, and water and wastewater infrastructure. It also addresses employee compensation through market adjustments and step increases. The budget aims to balance the needs of a growing community while ensuring long-term financial stability and high-quality service delivery.
The Celina Public Library Master Plan focuses on expanding library services and facilities to meet the needs of the growing Celina community through 2040. Key areas of focus include increasing physical and digital collections, enhancing technology and programming, and developing new library spaces and services. The plan outlines a phased implementation strategy, including short-term solutions like expanded digital access and non-traditional services, as well as long-term goals such as building a new library/government center and regional libraries to ensure equitable access and exemplary service levels.
The Stormwater Management Plan for the City of Celina outlines the city's strategies for managing stormwater discharge in compliance with the Texas Pollution Discharge Elimination System permit. The plan details various Best Management Practices (BMPs) across several Minimum Control Measures (MCMs) to reduce pollutants in stormwater runoff. It includes public education, illicit discharge detection and elimination, construction site runoff control, post-construction stormwater management, and pollution prevention measures for municipal operations. The plan also addresses impaired water bodies, specifically Wilson Creek, by implementing BMPs to decrease bacteria levels. The plan aims to improve water quality, ensure regulatory compliance, and promote community involvement in stormwater management.
The City of Celina's plan incorporates solar resource development as part of its Celina 2040 Comprehensive Plan. It focuses on exploring LEED certification, developing incentives for renewable energy investments (such as solar, wind, and electric charging stations), and pursuing certification as a solar-ready community under the Department of Energy's SolSmart program. Key actions include encouraging solar energy development, providing a solar panel checklist to streamline permitting, and offering a planning solar fact sheet with requirements.
The City Council is accepting the proposed property tax rate and setting the date, time, and location for a public hearing on the proposed property tax rate. The council is also establishing the date, time, and location for a public hearing on the proposed Fiscal Year 2023-2024 Budget and setting a date to conduct a vote to adopt the budget.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Celina's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database