Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The general nature of the work on which bids will be received consists of construction of a 115 kV rated, substation. The work consists of concrete foundations and concrete work, steel, fencing, conduit and ductwork, manholes, ground grid, power and control cables, buswork, control enclosure, and AC and DC wiring. This also includes the installation of Owner-furnished, steel structures, circuit breakers, CVT’s and 115 kV GOAB switches and relocating an existing Circuit Switcher and Transformer. This will also consist of connecting to switchgear, and control panels. Modifications to the existing control panels at the Industrial and West substation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Detroit Lakes Public Utilities is seeking proposals for the construction of a 115 kV rated Jet Substation. The project scope includes owner-furnished equipment installations, foundations, steel, grounding, cable work, and control enclosures. The solicitation was posted on January 3, 2026, with a response deadline of January 29, 2026, but full documents are password-protected on QuestCDN.
Posted Date
Jan 3, 2026
Due Date
Jan 29, 2026
Release: Jan 3, 2026
Close: Jan 29, 2026
The Detroit Lakes Public Utilities is seeking proposals for the construction of a 115 kV rated Jet Substation. The project scope includes owner-furnished equipment installations, foundations, steel, grounding, cable work, and control enclosures. The solicitation was posted on January 3, 2026, with a response deadline of January 29, 2026, but full documents are password-protected on QuestCDN.
AvailableThe City utility (New Braunfels Utilities) seeks a contractor to construct the Kohlenberg Substation, including site preparation, excavation, foundations, structural construction, electrical work, trenching, grounding, site security, materials handling, and related appurtenances. The procurement is a sealed-bid RFP/IFB process with a non-mandatory pre-bid meeting on 2026-01-06 and a question deadline of 2026-02-03. Bids are due electronically via the OpenGov portal on 2026-02-12 at 2:00pm Central Time; the project estimate shown on the aggregator is $5M$15M (AI estimate) but the official posting does not state a firm estimate.
Posted Date
Dec 19, 2025
Due Date
Feb 12, 2026
Release: Dec 19, 2025
Close: Feb 12, 2026
The City utility (New Braunfels Utilities) seeks a contractor to construct the Kohlenberg Substation, including site preparation, excavation, foundations, structural construction, electrical work, trenching, grounding, site security, materials handling, and related appurtenances. The procurement is a sealed-bid RFP/IFB process with a non-mandatory pre-bid meeting on 2026-01-06 and a question deadline of 2026-02-03. Bids are due electronically via the OpenGov portal on 2026-02-12 at 2:00pm Central Time; the project estimate shown on the aggregator is $5M$15M (AI estimate) but the official posting does not state a firm estimate.
General Construction Work of Substation No. 7 69 KV Solar Line Terminal Addition
Posted Date
Dec 30, 2025
Due Date
Jan 15, 2026
Release: Dec 30, 2025
Close: Jan 15, 2026
General Construction Work of Substation No. 7 69 KV Solar Line Terminal Addition
AvailableWork includes design, manufacture, testing, and delivery of the substation expansion - substation steel and equipment. The work for which bids are to be received consists of: design of substation steel structures, structure foundations, and substation ground grid. Providing all materials for the substation structures and ground grid. Providing all station insulators, switches, and bus work.
Posted Date
Nov 22, 2025
Due Date
Jan 8, 2026
Release: Nov 22, 2025
Close: Jan 8, 2026
Work includes design, manufacture, testing, and delivery of the substation expansion - substation steel and equipment. The work for which bids are to be received consists of: design of substation steel structures, structure foundations, and substation ground grid. Providing all materials for the substation structures and ground grid. Providing all station insulators, switches, and bus work.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.