Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Air Force Materiel Command
The C-5 Galaxy aircraft relies on various adhesive bonded honeycomb panels to provide aerodynamic contours and adds structural integrity to airframes. Manufacturing bonded panels requires strict control in facility contamination levels, building temperature/humidity, tracking adhesive life, autoclave operation and bond line surface preparations. C-5 bonded panel manufacturing follows detailed processing specifications, and in the case of highly contoured areas, requires an experienced technical staff to interpret aircraft loft data.
Posted Date
Mar 4, 2026
Due Date
Mar 26, 2026
Release: Mar 4, 2026
Air Force Materiel Command
Close: Mar 26, 2026
The C-5 Galaxy aircraft relies on various adhesive bonded honeycomb panels to provide aerodynamic contours and adds structural integrity to airframes. Manufacturing bonded panels requires strict control in facility contamination levels, building temperature/humidity, tracking adhesive life, autoclave operation and bond line surface preparations. C-5 bonded panel manufacturing follows detailed processing specifications, and in the case of highly contoured areas, requires an experienced technical staff to interpret aircraft loft data.
AvailableAir Force Materiel Command
The engineering and manufacturing knowledge for egress components for USAF Air Launch Cruise Missile.
Posted Date
Mar 5, 2026
Due Date
Mar 21, 2026
Release: Mar 5, 2026
Air Force Materiel Command
Close: Mar 21, 2026
The engineering and manufacturing knowledge for egress components for USAF Air Launch Cruise Missile.
AvailableAir Force Materiel Command
The Department of the Air Force is seeking a contractor for the remanufacture of the F108 Turbine Clearance Control Valve, a critical safety item requiring specific qualification standards. This sole-source requirement is issued to AAR Corp., though other responsible sources with an approved Source Approval Request may submit proposals. The contract covers a base year plus four one-year options for a total five-year ordering period.
Posted Date
Mar 4, 2026
Due Date
Mar 20, 2026
Release: Mar 4, 2026
Air Force Materiel Command
Close: Mar 20, 2026
The Department of the Air Force is seeking a contractor for the remanufacture of the F108 Turbine Clearance Control Valve, a critical safety item requiring specific qualification standards. This sole-source requirement is issued to AAR Corp., though other responsible sources with an approved Source Approval Request may submit proposals. The contract covers a base year plus four one-year options for a total five-year ordering period.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Air Force Materiel Command's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Director of Engineering and Technical Management and Chief Engineer, Air Force Materiel Command (AFMC/EN)
Director of Engineering and Technical Management and Chief Engineer, Air Force Materiel Command
Premium
Access the largest public sector contact database