RFP Catalog/Water Infrastructure

Water Infrastructure RFPs

Track water infrastructure RFP opportunities from water utilities, water districts, and municipal water departments. Discover solicitations for water treatment plants, water meters, distribution systems, and water infrastructure projects updated daily.

Borough of Brackenridge

Scope of work generally includes the electrical construction modifications required for the improvements being constructed under the General Construction Contract including all equipment, building electrical, SCADA and control system improvements. Electrical contract also includes furnishing and installing replacement electric actuators for the existing filtration valves (valves to remain).

Posted Date

Dec 9, 2025

Due Date

Jun 26, 2026

Timeline Progress87%
Borough of Brackenridge

he scope of work includes, the conversion of the existing 1.0 MG finished water storage tank into a final clearwell with internal baffling, building expansion including installation of new flocculation tanks, lamella type plate clarifiers, and site piping reconfiguration. Flocculation and clarification system upgrades include replacing conventional clarifiers with new Lamella type plate clarifiers, installation of new flocculation tanks with flash mixing, demolition of an existing concrete clarifier, expansion / renovation of the existing water treatment plant building and all general/mechanical construction required. Site construction generally includes exterior and interior piping modifications include relocating finished water piping, new 16-IN raw water feed line, installation of new vaults and modification of existing vaults, demolition of piping to be abandoned, and implementing/maintaining temporary bypass piping.

Posted Date

Dec 9, 2025

Due Date

Jun 26, 2026

Timeline Progress87%
New York City

Work include inspection, testing, maintenance and repair of fire alarm system and fire suppression system.

Posted Date

May 28, 2026

Due Date

Jun 30, 2026

Timeline Progress11%
City of Wellston

Water treatment plant improvements project.

Posted Date

Apr 1, 2026

Due Date

Jun 1, 2026

Timeline Progress100%
Sacramento County Water Agency

Sacramento County Water Agency (SCWA) seeks qualified waste-hauling firms to provide scheduled and as-needed sludge removal, transportation, and disposal services at the Vineyard Surface Water Treatment Plant. The contract term is anticipated to begin September 21, 2026, and run through September 20, 2027, with up to four one-year renewal options. Questions are due June 12, 2026, and sealed bids are due June 26, 2026, at 2:00 PM Pacific.

Posted Date

May 22, 2026

Due Date

Jun 26, 2026

Timeline Progress28%
Cape Fear Public Utility Authority

The Cape Fear Public Utility Authority is soliciting bids for the rehabilitation of the 4MG Clearwell at the Sweeney Water Treatment Plant. The project scope includes the replacement of expansion joint caulking within the confined spaces of the clearwell and the cleaning and inspection of drain lines. Bids are being accepted until the deadline in June 2026 to ensure the continued integrity of the water treatment infrastructure.

Posted Date

May 21, 2026

Due Date

Jun 9, 2026

Timeline Progress56%
County of Sacramento

Provide comprehensive sludge removal and waste collection services.

Posted Date

May 22, 2026

Due Date

Jun 26, 2026

Timeline Progress28%
Cape Fear Public Utility Authority

Work includes water treatment plant 4mg clearwell rehabilitation pr3.

Posted Date

Mar 19, 2026

Due Date

Jun 9, 2026

Timeline Progress90%
City of Gainesville

The City of Gainesville is requesting proposals for the Water Treatment Plant VFD Replacement Project. The Project will consist of Work occurring at two different sites. Work at Riverside WTP consists of the following major elements: Demolition of the existing high service pump No. 6 and raw water pump No. 4 motor control centers and variable frequency drives and the installation of the new high service pump No. 6 and raw water pump No. 4 motor control centers and variable frequency drives. Work at Lakeside WTP consists of the following major elements: Demolition of the existing high service pump No. 1 motor control center and variable frequency drive and the installation of the new high service pump No.

Posted Date

Apr 22, 2026

Due Date

Jul 9, 2026

Timeline Progress51%
Bay County

Work includes construction of new filters 12, 13, and 14 adjacent to filters 9-11 and the installation of a new transfer pump no. 5 in transfer pump station no. 2. The new filter building includes the filter underdrains, filter media, filter piping, filter control valves and gates, filter piping headers, and appurtenances. The project also includes modifications to the wtp yard piping, electrical and scada system improvements for the new facilities, sitework,

Posted Date

Apr 30, 2026

Due Date

Jun 4, 2026

Timeline Progress91%
City of Durham

Project generally consists of the complete installation of a 54" and 30" filter effluent bypass pipe, a 72" PCCP line stop, a 72" PCCP tapping sleeve and valve assembly, a 54" ductile iron tapping sleeve and valve assembly, a 24" ductile iron tapping sleeve and valve assembly, extending existing filtered effluent chemical feed lines, a chemical injection vault, and civil site improvements.

Posted Date

May 14, 2026

Due Date

Jun 25, 2026

Timeline Progress42%
Immokalee Water And Sewer District

Procurement and installation of two new disk filters at their Wastewater Treatment Plant. The new filter facility will be used to provide non-potable public access reuse water. Design includes the two disk filters with additional space for a third filter. Other components of the project include equipment foundations, piping, bypass pumping, inline mixer, electrical, lighting, controls and panels, and other associated equipment.

Posted Date

Mar 4, 2026

Due Date

Jun 8, 2026

Timeline Progress92%
BLUE Grass Army Depot

Provide water/wastewater treatment plant and boiler repairs.

Posted Date

May 12, 2026

Due Date

Jun 12, 2026

Timeline Progress64%
City of Marco Island

Construction of an open storage structure to house 60 portable generators. Project includes furnishing, installing, and commissioning a prefabricated steel structure, along with site improvements including, but not limited to, concrete foundation, electrical system, plumbing, pavement, drainage, and other associated work.

Posted Date

Apr 19, 2026

Due Date

Jun 2, 2026

Timeline Progress97%
City of Gatesville

Work consist of removal and installation of two new recycle lift station pumps, installation of approx. 660 lf of 6" pvc dr 18 forcemain, elecrical & controls, lift station selective demolition.

Posted Date

May 22, 2026

Due Date

Jun 16, 2026

Timeline Progress39%
City of Galax

The City of Galax is seeking bids for the construction, supply, and testing of diesel generators and automatic transfer switches for its Water Treatment Plant and pump stations, including concrete pads and associated infrastructure.

Posted Date

-

Due Date

Jun 2, 2026

Gulf Shores Utilities

The project includes the following work: construction of a new water treatment facility on an existing water treatment plant, associated process equipment, piping, concrete work, electrical work, instrumentation and controls, and civil/site work.

Posted Date

May 29, 2026

Due Date

Jul 30, 2026

Timeline Progress4%
South Central Connecticut Regional Water Authority

The project includes replacement of the fluorosilic acid (fluoride) chemical feed system including day tank, metering pumps, transfer pumps, piping and valves, related electrical modifications, painting, and touch up of chemical resistant coating.

Posted Date

May 19, 2026

Due Date

Jun 30, 2026

Timeline Progress30%
Coolbaugh Township

Removal and replacement in kind of two (2) existing Sulzer ABS submersible pumps and the furnishing and installation of the mechanical piping, valves, appurtenance, associated structural support, TopVault system, miscellaneous equipment, electrical instrumentation and control wiring in the existing Coolbaugh Township Wastewater Treatment Plant influent pump station.

Posted Date

May 6, 2026

Due Date

Jun 9, 2026

Timeline Progress76%
City of Miramar

Water treatment plant sand separator.

Posted Date

Feb 4, 2026

Due Date

Jun 4, 2026

Timeline Progress97%

Win More Water Infrastructure RFPs

Get AI-powered buying signals and real-time alerts for water infrastructure opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available