Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include construction of all plumbing improvement associated with the proposed water treatment plant.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work include construction of all electrical improvements associated with the proposed water treatment plant and raw water pump station.
Posted Date
Dec 16, 2025
Due Date
Feb 4, 2026
Release: Dec 16, 2025
Close: Feb 4, 2026
Work include construction of all electrical improvements associated with the proposed water treatment plant and raw water pump station.
AvailablePremium
Access the largest public sector contact database
1A. Construction of a New water treatment plant, including two (2) 0.5 MGD membrane ultrafiltration skids, one clean-inplace sid, Chemical storage and metering system, two (2) finished water pumps and associated piping, valving, controls integration and start up. Construction of improvements to the existing taw water intake maintenance building, including two (2) raw water pumps, associated piping, valving, controls integration and start up. 1B. Construction of all electrical improvements. 1C. Construction of HVAC systems. 1D. Construction of all plumbing improvements.
Posted Date
Dec 16, 2025
Due Date
Feb 4, 2026
Release: Dec 16, 2025
Close: Feb 4, 2026
1A. Construction of a New water treatment plant, including two (2) 0.5 MGD membrane ultrafiltration skids, one clean-inplace sid, Chemical storage and metering system, two (2) finished water pumps and associated piping, valving, controls integration and start up. Construction of improvements to the existing taw water intake maintenance building, including two (2) raw water pumps, associated piping, valving, controls integration and start up. 1B. Construction of all electrical improvements. 1C. Construction of HVAC systems. 1D. Construction of all plumbing improvements.
AvailableWork include construction of heating, ventilation and air conditioning (hvac) system for the proposed water treatment plant and raw water pump station.
Posted Date
Dec 16, 2025
Due Date
Feb 4, 2026
Release: Dec 16, 2025
Close: Feb 4, 2026
Work include construction of heating, ventilation and air conditioning (hvac) system for the proposed water treatment plant and raw water pump station.
AvailableThe Village of Attica is soliciting sealed bids for multiple prime contracts to construct new drinking water treatment equipment, a new pole‑barn structure, a finished‑water pump station, lagoon, site utilities, and associated systems at its Water Treatment Plant. Bids are due at the Village Clerk’s Office by 2:00 PM local time on December 18, 2025, and the project is partially funded by WIIA and DWSRF through EFC.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Close: Dec 18, 2025
The Village of Attica is soliciting sealed bids for multiple prime contracts to construct new drinking water treatment equipment, a new pole‑barn structure, a finished‑water pump station, lagoon, site utilities, and associated systems at its Water Treatment Plant. Bids are due at the Village Clerk’s Office by 2:00 PM local time on December 18, 2025, and the project is partially funded by WIIA and DWSRF through EFC.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis