Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Robinson Palestine Water Commissions's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Robinson Palestine Water Commissions
The Project includes the following Work: Division A: Water Treatment Plant Campus Division A includes a new 1,800 gallon per minute filtration and Per- and Polyfluoroalkyl (PFAS) removal water treatment plant with related site improvements and accessories; associated pumps, piping, valves, structures, electrical work and appurtenances. Electrical work includes outside conduits, feeders, and light poles. Division B: Ground Storage Tanks Division B includes two (2) one million gallons (1,000,000 gallons) ground storage tanks. Work includes site grading, earthwork, foundation, steel erection, and coating. Foundation/concrete work to include valve vault, valve(s), and piping extend outside of the vault or foundation shall be included. Electrical conduits, conductors, and pressure sensors are not included in the contract. Division C: Underground Piping Division C includes all underground water main, water services, sanitary sewer, and storm sewer within 5' of the building/structure or foundation. In addition to the water main, all manhole structures (excluding the head tank) shall be included. Fire hydrants to flush the head tank shall be included in Division C work. This work includes the conversion of the raw water main to finish water main. This will require multiple mobilization to connect, disconnect, tap and plug the water mains.
Posted Date
Nov 19, 2025
Due Date
Feb 4, 2026
Release: Nov 19, 2025
Robinson Palestine Water Commissions
Close: Feb 4, 2026
The Project includes the following Work: Division A: Water Treatment Plant Campus Division A includes a new 1,800 gallon per minute filtration and Per- and Polyfluoroalkyl (PFAS) removal water treatment plant with related site improvements and accessories; associated pumps, piping, valves, structures, electrical work and appurtenances. Electrical work includes outside conduits, feeders, and light poles. Division B: Ground Storage Tanks Division B includes two (2) one million gallons (1,000,000 gallons) ground storage tanks. Work includes site grading, earthwork, foundation, steel erection, and coating. Foundation/concrete work to include valve vault, valve(s), and piping extend outside of the vault or foundation shall be included. Electrical conduits, conductors, and pressure sensors are not included in the contract. Division C: Underground Piping Division C includes all underground water main, water services, sanitary sewer, and storm sewer within 5' of the building/structure or foundation. In addition to the water main, all manhole structures (excluding the head tank) shall be included. Fire hydrants to flush the head tank shall be included in Division C work. This work includes the conversion of the raw water main to finish water main. This will require multiple mobilization to connect, disconnect, tap and plug the water mains.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.