Huntington Street Watermain Replacement
Jul 29, 2026
Closes
Aug 25, 2026
Watermain replacement. Construct +/- 7,780 LF of 8", 10" and 16" watermain, including curb stops, gate valves, hydrants, bypass and other associated work. Work includes 140 LF of 3/4" copper lateral piping; 55 LF of 1" copper lateral piping; 50 LF of 10" DI water main piping; 3,225 LF of 16" DI water main piping; 6 EA fire hydrant assembly; 25 SY of gravel driveway restoration; 525 SF of concrete sidewalk restoration; 10 LF of concrete curb; 1 LS site restoration; 2,850 SY of lawn restoration; 200 SY of miscellaneous excavation. See attached file.