Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Watertown
Work includes 180 CY unclassified excavation and disposal; 25 CY select granular fill; 10 CY controlled low strength material; 60 CY trench and culvert excavation; 140 CY subbase course type 2; 145 TON 9.5 f2 top course asphalt 80 series compaction; 230 TON 19 f9 binder course asphalt 80 series compaction; 230 TON 19 f9 binder course asphalt 80 series compaction; 95 TON 37.4 f9 base course asphalt 80 series compaction; 325 GAL diluted tack coat; 1,100 LF asphalt pavement joint adhesive; 1,500 SY misc cold milling of bituminous concrete. See attached file.
Posted Date
Jun 10, 2026
Due Date
Jul 7, 2026
Release: Jun 10, 2026
City of Watertown
Close: Jul 7, 2026
Work includes 180 CY unclassified excavation and disposal; 25 CY select granular fill; 10 CY controlled low strength material; 60 CY trench and culvert excavation; 140 CY subbase course type 2; 145 TON 9.5 f2 top course asphalt 80 series compaction; 230 TON 19 f9 binder course asphalt 80 series compaction; 230 TON 19 f9 binder course asphalt 80 series compaction; 95 TON 37.4 f9 base course asphalt 80 series compaction; 325 GAL diluted tack coat; 1,100 LF asphalt pavement joint adhesive; 1,500 SY misc cold milling of bituminous concrete. See attached file.
AvailableCity of Watertown
Work includes generator will be installed within 15' of pump station building, image of location attache ; generator will be set on a 6" thick precast concrete pad, reinforced with #4 rebar 12" oc and 6" reveal on all sides; a 12" thick gravel subbase compacted at 6" lifts will be installed for the concrete pad; conduit runs from transfer switch will be stubbed up through concrete pad and base of generator; 100a service rated fusible automatic transfer switch will be installed adjacent to the existing meter channel. Provide a HDPE backboard & stainless hardware to support new switch as well as the existing manual transfer switch, generator plug & cellular communicator; existing transfer switch will remain in series on load side of new ats. See attached file.
Posted Date
Jun 10, 2026
Due Date
Jul 7, 2026
Release: Jun 10, 2026
City of Watertown
Close: Jul 7, 2026
Work includes generator will be installed within 15' of pump station building, image of location attache ; generator will be set on a 6" thick precast concrete pad, reinforced with #4 rebar 12" oc and 6" reveal on all sides; a 12" thick gravel subbase compacted at 6" lifts will be installed for the concrete pad; conduit runs from transfer switch will be stubbed up through concrete pad and base of generator; 100a service rated fusible automatic transfer switch will be installed adjacent to the existing meter channel. Provide a HDPE backboard & stainless hardware to support new switch as well as the existing manual transfer switch, generator plug & cellular communicator; existing transfer switch will remain in series on load side of new ats. See attached file.
AvailableCity of Watertown
Community forestry tree pruning. Qualified tree care professionals to conduct priority tree pruning. The goals of this project are to enter into a contract with a qualified vendor, hereafter known as the Contractor, to minimize tree related risk to citizens, private and publicly owned property, in increasing the overall health of Watertown's urban forest, and furthering the enhancement of our neighborhoods and parks. See attached file.
Posted Date
Jun 2, 2026
Due Date
Jun 23, 2026
Release: Jun 2, 2026
City of Watertown
Close: Jun 23, 2026
Community forestry tree pruning. Qualified tree care professionals to conduct priority tree pruning. The goals of this project are to enter into a contract with a qualified vendor, hereafter known as the Contractor, to minimize tree related risk to citizens, private and publicly owned property, in increasing the overall health of Watertown's urban forest, and furthering the enhancement of our neighborhoods and parks. See attached file.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $20,000, use sole source.
Coops: Suggest NY OGS Centralized Contracts or coops (OMNIA Partners, Sourcewell, NASPO ValuePoint). Buyer hasn’t historically used coops, but you can encourage them to explore these procurement programs as future options.
City of Watertown, NY
Threshold: Competitive bidding at $20,000; there is a complete lack of evidence for sole source awards above this amount.
Board meetings and strategic plans from City of Watertown
The Comprehensive Plan is a policy document guiding development within the community, used by the City Council, Planning Board, Zoning Board of Appeals, City Staff, and the public. It contains ten overarching goals for Watertown's future and recommendations to achieve them, dividing the City into future land use character areas.
The 2016-2020 Consolidated Plan for the City of Watertown focuses on neighborhood stabilization and revitalization, affordable housing rehabilitation, and homeless assistance. It also includes homeownership, job support and creation, fair housing education and support of public services. The plan aims to address community development needs through citizen participation and community outreach, identifying high-priority needs such as decent affordable housing, public infrastructure improvements, blight elimination, and economic development.
The 2021-2025 Consolidated Plan for the City of Watertown focuses on neighborhood stabilization and revitalization, affordable housing rehabilitation, increasing homeownership opportunities, environmental enrichment, job support and creation, fair housing education, support of public services and homeless assistance. The plan addresses community development needs through citizen participation and community outreach.
The City of Watertown's Consolidated Plan for 2014 and 2015 focuses on residential neighborhood stabilization and revitalization through housing rehabilitation, public infrastructure improvements, and blight elimination. Key priorities include addressing decent affordable housing, public infrastructure improvements, blight elimination, and homelessness prevention. The plan targets seven low- to moderate-income neighborhoods and aims to improve the city's housing stock, public infrastructure, and assistance to homeless individuals in coordination with Points North Housing Coalition.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Watertown's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge