RFP Catalog/Water Infrastructure

Water Infrastructure RFPs

Track water infrastructure RFP opportunities from water utilities, water districts, and municipal water departments. Discover solicitations for water treatment plants, water meters, distribution systems, and water infrastructure projects updated daily.

City of Waite Park

Removal and replacement of the filter media and filter underdrains at the WTP and associated inspection and cleaning.

Posted Date

May 19, 2026

Due Date

Jun 24, 2026

Timeline Progress35%
City of Roma

Installation of New 800A Service Entrance Rated MTS/ATS and 500kW Generator at Water Treatment Plant. Installation of New 600A Service Entrance Rated MTS/ATS and 250kW Generator at High Service Pump Station. Installation of Fused Disconnect, Transformer, and Lighting Panel at High Service Pump Station. SCADA integration of ATS and Generator.

Posted Date

May 4, 2026

Due Date

Jun 4, 2026

Timeline Progress89%
City of Cedar Rapids

The City of Cedar Rapids is seeking Construction Manager at Risk (CMAR) services for the 2026 Northwest Water Treatment Plant Capacity Improvements project. This two-step procurement process involves a Statement of Qualifications followed by a Request for Proposals for shortlisted firms. The project aims to enhance the capacity of the Northwest Water Treatment Plant with a final contract award scheduled for August 2026.

Posted Date

Apr 29, 2026

Due Date

Jun 3, 2026

Timeline Progress93%
Bristol County Water Authority

Project consists of demolition. Work will include hazardous materials abatement of lead paint, asbestos-containing building materials, pcb-containing materials, universal hazardous wastes, and other materials requiring special handling and disposal, as well as demolition of existing structures and appurtenances.

Posted Date

-

Due Date

Jun 11, 2026

Santa Clarita Valley Water Agency

Installation of approx. 1,760 LF of 8" PVC sewer line, 475 LF of concrete retaining wall, 650 LF of drainage ditch, 430 LF of curb and gutter, 14 sewer manholes and 3,600 SY of new asphalt concrete access road, and all associated work.

Posted Date

Apr 14, 2026

Due Date

Jun 3, 2026

Timeline Progress95%
Town of New Castle

The principal features of the work shall include the installation of a 9,600 gallon #2 fuel oil aboveground storage tank, foundation slab, piping, leak detection and associated equipment, and the in-place closure of two 10,000 gallon #2 fuel oil underground storage tanks.

Posted Date

May 20, 2026

Due Date

Jun 18, 2026

Timeline Progress40%
Passaic Valley Water Commission

Chemical Fill Station including replacement of five (5) 2" Diameter chemical pipes, valves, and disconnects, installation of a check valve at each of the five chemical lines, cut and cap the inactive pipes, replacements of concrete pad and bollards, replacement of existing compressed air pipe and hose reel, replacement of existing and installation of new heat trace systems.

Posted Date

May 14, 2026

Due Date

Jun 9, 2026

Timeline Progress68%
City of Miramar

The City of Miramar is soliciting bids to replace the existing sand separator at the East Water Treatment Plant, including design, procurement, and installation of a new sand separator system. The solicitation is issued as an Invitation for Bid (IFB) and seeks a qualified contractor to complete the work in compliance with applicable laws and regulations. Bidding opened on 2026-05-05 and closes on 2026-06-04; procurement documents are provided via the buyer's posting on DemandStar.

Posted Date

May 5, 2026

Due Date

Jun 4, 2026

Timeline Progress89%
City of Durham

The City of Durham Department of Water Management is soliciting Statements of Qualifications for professional engineering services to evaluate and design upgrades at the Brown Water Treatment Plant to address filtrate and lagoon decant discharge. The project aims to mitigate hydraulic limitations and potential gravity sewer overflows through preliminary engineering, field data collection, and evaluation of conveyance alternatives. Future phases may include detailed design, permitting, and construction services following the initial technical evaluation.

Posted Date

May 11, 2026

Due Date

Jun 12, 2026

Timeline Progress65%
City of Cedar Rapids

The work generally consists of removal and replacement of the existing systems on several buildings and roof repairs at six separate buildings. Roof replacement consists of adhered EPDM single-ply and asphalt shingle steep roofing. This project includes interior protection, tear-off, deck replacement, painting, plumbing, insulation, mechanical, vapor retarder, electrical, masonry, rough carpentry, joint sealants, and roof-related sheet metal work.

Posted Date

May 13, 2026

Due Date

Jun 10, 2026

Timeline Progress67%
Madison Suburban Utility District

The Project consists of rehabilitating two water treatment plant sludge lagoons totaling approx. 2.6 acres. Rehabilitation efforts include the installation of new high-density polyethylene liner systems, new concrete sumps, new concrete walkways, new asphalt perimeter road, and the replacement of existing piping and valves.

Posted Date

May 1, 2026

Due Date

Jun 23, 2026

Timeline Progress58%
City of Fernley

Work consists of loading, transportation, and disposal of residual solids generated during the drinking water treatment process, containing approximately 2.0% total suspended solids.

Posted Date

May 13, 2026

Due Date

Jun 3, 2026

Timeline Progress89%
City of Dilley

Project consists of but is not limited to water system improvements for the city, including site improvements, replacement of the existing aerator at the water plant, installation of a variable frequency drive (vfd) system, clear well/filter improvements including replacement of filter media and underdrain/distribution piping, and installation of an emergency backup generator system at the civic center well. Work includes all labor, materials, equipment, connections, appurtenances, testing, and incidentals required for a complete and operational installation.

Posted Date

May 14, 2026

Due Date

Jun 2, 2026

Timeline Progress93%
City of Havelock

The City of Havelock is soliciting fixed-price bids for Bulk Solar Salt to be delivered in approximately 25-ton pneumatic truckloads to the city’s water treatment plant. Estimated usage is roughly 2–3 truckloads per month, totaling approximately 600–900 tons for the contract period ending June 30, 2027. Bidders must provide a Certificate of Analysis for the salt grade and comply with North Carolina procurement statutes, including E-Verify requirements.

Posted Date

May 12, 2026

Due Date

Jun 18, 2026

Timeline Progress53%
City of Clovis

Provide professional engineering services for the surface water treatment plant clear well expansion design project.

Posted Date

May 11, 2026

Due Date

Jun 12, 2026

Timeline Progress65%
Massachusetts Water Resources Authority

Supply and delivery of hydrofluorosilicic acid

Posted Date

May 23, 2026

Due Date

Jun 10, 2026

Timeline Progress48%
Selma Water Works and Sewer Board

Concrete trough repair at the water treatment plant.

Posted Date

May 13, 2026

Due Date

Jun 4, 2026

Timeline Progress85%
City of Ithaca

Water treatment plant polyaluminum chloride stave tank liner replacement. Provide labor and materials to remove and replace the existing PVC liner in one (1) wood stave chemical storage tank used for Polyaluminum Chloride (34%) storage. Work includes conducting a pre-construction site survey, removing the existing liner, preparing the tank, installing protective padding, furnishing and installing a new PVC liner, reinstalling the tank cover, and optional installation of two pre-purchased tank level sensors. See attached file.

Posted Date

May 11, 2026

Due Date

Jun 18, 2026

Timeline Progress55%
Massachusetts Water Resources Authority

Supply and delivery of aqua ammonia.

Posted Date

May 23, 2026

Due Date

Jun 11, 2026

Timeline Progress46%
South Central Connecticut Regional Water Authority

Complete fabrication and installation of eight new local control consoles (LCC) to replace the eight existing local control consoles, as well as modifications to monitoring and control wiring for valves, backwash and surface wash pumps at the lake gaillard water treatment plant (WTP) facility operated by the authority. The upgrade for each LCC will replace existing LCCS with new consoles and panels. Programming and configuration services will be provided by the owner, or the owner s designated representative.

Posted Date

May 8, 2026

Due Date

Jun 10, 2026

Timeline Progress72%

Win More Water Infrastructure RFPs

Get AI-powered buying signals and real-time alerts for water infrastructure opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available