Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
he scope of work includes, the conversion of the existing 1.0 MG finished water storage tank into a final clearwell with internal baffling, building expansion including installation of new flocculation tanks, lamella type plate clarifiers, and site piping reconfiguration. Flocculation and clarification system upgrades include replacing conventional clarifiers with new Lamella type plate clarifiers, installation of new flocculation tanks with flash mixing, demolition of an existing concrete clarifier, expansion / renovation of the existing water treatment plant building and all general/mechanical construction required. Site construction generally includes exterior and interior piping modifications include relocating finished water piping, new 16-IN raw water feed line, installation of new vaults and modification of existing vaults, demolition of piping to be abandoned, and implementing/maintaining temporary bypass piping.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Scope of work generally includes the electrical construction modifications required for the improvements being constructed under the General Construction Contract including all equipment, building electrical, SCADA and control system improvements. Electrical contract also includes furnishing and installing replacement electric actuators for the existing filtration valves (valves to remain).
Posted Date
Dec 9, 2025
Due Date
Jan 5, 2026
Release: Dec 9, 2025
Close: Jan 5, 2026
Scope of work generally includes the electrical construction modifications required for the improvements being constructed under the General Construction Contract including all equipment, building electrical, SCADA and control system improvements. Electrical contract also includes furnishing and installing replacement electric actuators for the existing filtration valves (valves to remain).
AvailableThe Project includes the following Work: Addition of pressure filtration to the existing Reverse Osmosis Drinking Water Treatment Plant. Includes piping, valving, pressure filter system, chemical feed systems, electrical and controls.
Posted Date
Nov 21, 2025
Due Date
Dec 17, 2025
Release: Nov 21, 2025
Close: Dec 17, 2025
The Project includes the following Work: Addition of pressure filtration to the existing Reverse Osmosis Drinking Water Treatment Plant. Includes piping, valving, pressure filter system, chemical feed systems, electrical and controls.
AvailableWater treatment plant improvements including, but not limited to, the construction of a second clear well, complete filter reconstruction, electrical system upgrades, a new backwash waste sump and pump station, repurposing the existing high service pump station, a new high service pumpstation and chemical building, existing chemical feed system improvements, sludge handling/processing improvements, stormwater system updates, and miscellaneous civil/site improvements.
Posted Date
Nov 6, 2025
Due Date
Jan 8, 2026
Release: Nov 6, 2025
Close: Jan 8, 2026
Water treatment plant improvements including, but not limited to, the construction of a second clear well, complete filter reconstruction, electrical system upgrades, a new backwash waste sump and pump station, repurposing the existing high service pump station, a new high service pumpstation and chemical building, existing chemical feed system improvements, sludge handling/processing improvements, stormwater system updates, and miscellaneous civil/site improvements.
Demolition of the water filtration plant; construction of a new intermediate and high lift pump station (IHLPS) on the site of the demolished center clearwell; construction of a new south reservoir on the site of the demolished south clearwell; construction of a new north reservoir on the site of the demolished north clearwell; installation of new WFP emergency generators and generators' switchgear; replacement of low lift pumps and piping, electrical systems, and building mechanical systems in the LL-HSPS; replacement of low lift pump drives in the backup low lift pump station; installation of flow meter vault improvements; installation of CT/BWS basin improvements; installation of buried piping and electrical ductbank; installation of modifications to the WFP supervisory control and data acquisition (SCADA) system; installation of a new storm water outfall to lake; WFP site fencing, surface restoration and landscaping.
Posted Date
Nov 26, 2025
Due Date
Jan 22, 2026
Release: Nov 26, 2025
Close: Jan 22, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Demolition of the water filtration plant; construction of a new intermediate and high lift pump station (IHLPS) on the site of the demolished center clearwell; construction of a new south reservoir on the site of the demolished south clearwell; construction of a new north reservoir on the site of the demolished north clearwell; installation of new WFP emergency generators and generators' switchgear; replacement of low lift pumps and piping, electrical systems, and building mechanical systems in the LL-HSPS; replacement of low lift pump drives in the backup low lift pump station; installation of flow meter vault improvements; installation of CT/BWS basin improvements; installation of buried piping and electrical ductbank; installation of modifications to the WFP supervisory control and data acquisition (SCADA) system; installation of a new storm water outfall to lake; WFP site fencing, surface restoration and landscaping.
Available