Water Infrastructure RFPs
Track water infrastructure RFP opportunities from water utilities, water districts, and municipal water departments. Discover solicitations for water treatment plants, water meters, distribution systems, and water infrastructure projects updated daily.
Advvanced meter AMI and water meter project.
Posted Date
Feb 17, 2026
Due Date
Mar 17, 2026
Advanced Meter AMI and Water Meter Project
Release: Feb 17, 2026
Close: Mar 17, 2026
Advvanced meter AMI and water meter project.
AvailableThe City of Chehalis is seeking sealed bids for the purchase of a 300 Ultrasonic AMI Water Meter System Upgrade.
Posted Date
Feb 4, 2026
Due Date
Feb 20, 2026
AMI Water Meter Upgrade
Release: Feb 4, 2026
Close: Feb 20, 2026
The City of Chehalis is seeking sealed bids for the purchase of a 300 Ultrasonic AMI Water Meter System Upgrade.
Furnish chemicals for water treatment plant & wastewater treatment plant. See attached file.
Posted Date
Feb 11, 2026
Due Date
Mar 6, 2026
Water Treatment Plant & Wastewater Treatment Plant Chemical
Release: Feb 11, 2026
Close: Mar 6, 2026
Furnish chemicals for water treatment plant & wastewater treatment plant. See attached file.
AvailableProject shall consist of general improvements, its filtration, and scada systems. Sub bid categorizes include electrical and painting.
Posted Date
Feb 4, 2026
Due Date
Mar 26, 2026
Water Treatment Plant Improvements - SCADA, Filtration and general improvements
Release: Feb 4, 2026
Close: Mar 26, 2026
Project shall consist of general improvements, its filtration, and scada systems. Sub bid categorizes include electrical and painting.
AvailableProject consists of water meter replacement project - installation only. Work includes approx 1,215 AMR Meter; 750 meter boxes; 607 backflow valves; 415 curb stops.
Posted Date
Feb 10, 2026
Due Date
Mar 10, 2026
Source Water Rehabilitation Project Contract "B" AMR Water Meter Replacement Project - Installation Only
Release: Feb 10, 2026
Close: Mar 10, 2026
Project consists of water meter replacement project - installation only. Work includes approx 1,215 AMR Meter; 750 meter boxes; 607 backflow valves; 415 curb stops.
AvailableProject will consist of the replacing existing 5/8" x 3/4", 3/4" and 1" water meters with electronic meters and installation and activation of sensus ami transmitters for sending the water meters readings to the existing sensus ami network.
Posted Date
-
Due Date
Mar 6, 2026
Close: Mar 6, 2026
Project will consist of the replacing existing 5/8" x 3/4", 3/4" and 1" water meters with electronic meters and installation and activation of sensus ami transmitters for sending the water meters readings to the existing sensus ami network.
AvailableDesign and construction support services for a water filtration treatment system to remove manganese from four groundwater wells.
Posted Date
Jan 15, 2026
Due Date
Feb 23, 2026
Construction Design Documents for Water Filtration Treatment System
Release: Jan 15, 2026
Close: Feb 23, 2026
Design and construction support services for a water filtration treatment system to remove manganese from four groundwater wells.
Water Treatment Plant Project
AvailableExpand and rehabilitate the water treatment plant.
Posted Date
Feb 6, 2026
Due Date
Mar 9, 2026
Water Treatment Plant Project
Release: Feb 6, 2026
Close: Mar 9, 2026
Expand and rehabilitate the water treatment plant.
AvailableProvide water treatment plant upgrades.
Posted Date
Feb 12, 2026
Due Date
Mar 31, 2026
Contract A: Water Treatment Plant Upgrades
Release: Feb 12, 2026
Close: Mar 31, 2026
Provide water treatment plant upgrades.
AvailableWater Treatment Plant Doors
AvailableScope consists to supply and install new metal front doors at the Water Treatment Plant.
Posted Date
Feb 18, 2026
Due Date
Mar 10, 2026
Water Treatment Plant Doors
Release: Feb 18, 2026
Close: Mar 10, 2026
Scope consists to supply and install new metal front doors at the Water Treatment Plant.
AvailableImprovements to the Water Treatment Plant (WTP) for the Borough.
Posted Date
Nov 24, 2025
Due Date
Feb 24, 2026
Comly Avenue Water Treatment Plant Project
Release: Nov 24, 2025
Close: Feb 24, 2026
Improvements to the Water Treatment Plant (WTP) for the Borough.
AvailableThe work for this project consists of the construction of a new 0.28 MGD ion exchange and filtration water treatment plant and all associated site work, electrical, plumbing, instrumentation & controls, and all other associated features. It also includes installation of a lift station and approx. 5,719 LF of 6" C900 PVC force main.
Posted Date
-
Due Date
Mar 27, 2026
Mazon, IL - New Water Treatment Plant
Release: -
Close: Mar 27, 2026
The work for this project consists of the construction of a new 0.28 MGD ion exchange and filtration water treatment plant and all associated site work, electrical, plumbing, instrumentation & controls, and all other associated features. It also includes installation of a lift station and approx. 5,719 LF of 6" C900 PVC force main.
AvailableWater treatment plant improvements.
Posted Date
Jan 24, 2026
Due Date
Mar 27, 2026
Indiana American Water Terre Haute Water Treatment Plant Improvements
Release: Jan 24, 2026
Close: Mar 27, 2026
Water treatment plant improvements.
AvailableProcurement and delivery of specified chemicals for the City of Effingham Water Treatment Plant.
Posted Date
Feb 13, 2026
Due Date
Apr 7, 2026
FY 2027 Water Treatment Plant Chemicals
Release: Feb 13, 2026
Close: Apr 7, 2026
Procurement and delivery of specified chemicals for the City of Effingham Water Treatment Plant.
AvailableThe Town of Orange issued a PPEA solicitation for the rehabilitation of its Water Treatment Plant filter system, including the replacement of granular filter media and repair of underdrains. The project involves structural and process improvements to filtration units to meet Virginia Department of Health standards. The estimated value of the project ranges from $500,000 to $1,500,000 with a response deadline in April 2026.
Posted Date
Jan 23, 2026
Due Date
Apr 22, 2026
Water Treatment Plant Filter Replacement Project
Release: Jan 23, 2026
Close: Apr 22, 2026
The Town of Orange issued a PPEA solicitation for the rehabilitation of its Water Treatment Plant filter system, including the replacement of granular filter media and repair of underdrains. The project involves structural and process improvements to filtration units to meet Virginia Department of Health standards. The estimated value of the project ranges from $500,000 to $1,500,000 with a response deadline in April 2026.
AvailablePepperell Water Treatment Plant RFQ
AvailableThe Town of Pepperell is soliciting Statements of Qualifications from qualified general contractors and subcontractors for construction of a 1.3 million gallon per day PFAS water treatment plant (including cartridge filtration and granular activated carbon for PFAS removal). The project includes decommissioning the existing plant, pipelines, SCADA and electrical upgrades, and other site utilities; an estimated construction cost is approximately $20,000,000. A pre-bid meeting is scheduled for 2026-03-05 at 9:00 AM and proposals are due by the bid opening on 2026-03-11 at 2:00 PM.
Posted Date
Feb 17, 2026
Due Date
Mar 11, 2026
Pepperell Water Treatment Plant RFQ
Release: Feb 17, 2026
Close: Mar 11, 2026
The Town of Pepperell is soliciting Statements of Qualifications from qualified general contractors and subcontractors for construction of a 1.3 million gallon per day PFAS water treatment plant (including cartridge filtration and granular activated carbon for PFAS removal). The project includes decommissioning the existing plant, pipelines, SCADA and electrical upgrades, and other site utilities; an estimated construction cost is approximately $20,000,000. A pre-bid meeting is scheduled for 2026-03-05 at 9:00 AM and proposals are due by the bid opening on 2026-03-11 at 2:00 PM.
AvailableWater treatment plant sand separator.
Posted Date
Feb 4, 2026
Due Date
Mar 12, 2026
East Water Treatment Plant Sand Separator Project
Release: Feb 4, 2026
Close: Mar 12, 2026
Water treatment plant sand separator.
AvailableThe U.S. Department of State seeks contractors to provide preventative maintenance, water treatment services, and water quality testing for potable water systems at the U.S. Embassy in Kigali, Rwanda. The work includes routine and corrective servicing, chemical treatment, maintenance of filtration skids and reverse osmosis systems, and operator training. The procurement is unrestricted, has a one-year base period with four one-year options, and will be awarded to the lowest-priced technically acceptable offeror.
Posted Date
Feb 6, 2026
Due Date
Mar 6, 2026
Preventative Maintenance Water Treatment Plant
Release: Feb 6, 2026
Close: Mar 6, 2026
The U.S. Department of State seeks contractors to provide preventative maintenance, water treatment services, and water quality testing for potable water systems at the U.S. Embassy in Kigali, Rwanda. The work includes routine and corrective servicing, chemical treatment, maintenance of filtration skids and reverse osmosis systems, and operator training. The procurement is unrestricted, has a one-year base period with four one-year options, and will be awarded to the lowest-priced technically acceptable offeror.
AvailableConstruction of a new reverse osmosis treatment plant, ground storage tanks, high service pump station, water pipeline, and a storage building.
Posted Date
Feb 12, 2026
Due Date
Mar 30, 2026
Macomb Water Treatment Plant Improvements
Release: Feb 12, 2026
Close: Mar 30, 2026
Construction of a new reverse osmosis treatment plant, ground storage tanks, high service pump station, water pipeline, and a storage building.
AvailableThe U.S. Naval Facilities Engineering Command issued Solicitation N3319126R0004 for a firm-fixed-price Design-Build construction contract to build a Water Treatment Plant Annex at Naval Support Facility Deveselu, Romania. The scope includes construction of a pre-engineered metal building to house administrative and lab functions, hazardous chemical storage, and modifications to the existing ultra-filtration building. The contract is a full and open competition with an estimated value between $5M and $12M and a response deadline of March 2, 2026.
Posted Date
Feb 3, 2026
Due Date
Mar 2, 2026
Water Treatment Plant Annex (Romania)
Release: Feb 3, 2026
Close: Mar 2, 2026
The U.S. Naval Facilities Engineering Command issued Solicitation N3319126R0004 for a firm-fixed-price Design-Build construction contract to build a Water Treatment Plant Annex at Naval Support Facility Deveselu, Romania. The scope includes construction of a pre-engineered metal building to house administrative and lab functions, hazardous chemical storage, and modifications to the existing ultra-filtration building. The contract is a full and open competition with an estimated value between $5M and $12M and a response deadline of March 2, 2026.
AvailableWin More Water Infrastructure RFPs
Get AI-powered buying signals and real-time alerts for water infrastructure opportunities