RFP Catalog/Water Infrastructure

Water Infrastructure RFPs

Track water infrastructure RFP opportunities from water utilities, water districts, and municipal water departments. Discover solicitations for water treatment plants, water meters, distribution systems, and water infrastructure projects updated daily.

City of Warner Robins

Seeking proposals from qualified and experienced contractors capable of performing an Advanced Metering Infrastructure (AMI) Water Meter Replacement Project. This is a citywide initiative aimed at upgrading outdated water meters with advanced, automated metering technology.

Posted Date

Mar 9, 2026

Due Date

Apr 24, 2026

Progress79%
City of Port Jervis

The City of Port Jervis is seeking qualified contractors for the rehabilitation of its water filtration plant filters. The project scope includes the demolition of existing filter media and equipment followed by the installation of new filter media and related components such as valves and controls. Bids are being managed by the City Clerk Treasurer with technical oversight from MHE Engineering.

Posted Date

Mar 18, 2026

Due Date

Apr 20, 2026

Progress83%
City of Lynwood

The City of Lynwood is soliciting bids to remove existing water meters citywide and replace them with new Advanced (Smart) Meters, including reconnection to customer and public service lines. The solicitation requires both electronic and paper responses, includes a required remote pre-bid meeting, and sets bonding requirements and liquidated damages. Bids are due May 19, 2026, and questions must be submitted via the PlanetBids Q&A by May 6, 2026.

Posted Date

Apr 8, 2026

Due Date

May 19, 2026

Progress15%
Avon Lake Regional Water

Provide all tools, material, equipment, & labor for demolition of existing structures at the water filtration plant, including all required permits, demolition, hauling of all debris, asbestos and lead mitigation, and complete site restoration.

Posted Date

Mar 30, 2026

Due Date

Apr 22, 2026

Progress66%
Placer Co Water Agency

Construction and commissioning of a 10 million gallons per day drinking water treatment plant at the Ophir Road site, including new process, chemical, solids-handling, and pump station buildings plus modifications to the existing raw water pump station. The solicitation requires prequalification for General Contractors and Electrical Subcontractors and includes full sitework, piping, electrical, instrumentation, controls, and related systems. The posting was issued by the Placer County Water Agency and bids are due June 3, 2026.

Posted Date

Mar 4, 2026

Due Date

Jun 3, 2026

Progress45%
Borough of Paulsboro

Construction of a public water system filter building with two new granular activated carbon contactor trains and relocation of one existing contactor train (4 new vessels and 2 existing vessels for 6 vessels in total) at an existing water treatment facility. Work will include demolition of a decommissioned water treatment facility and construction of a new pre-engineered metal building (approx. dimensions 100-ft x 50 ft), helical pier foundation, grade beams, floor slab, heating and ventilation, electrical, plumbing, piping, site restoration, grading, paving, and associated supporting construction. Work also includes improvements and modifications at an existing water treatment facility to accommodate the new filter process.

Posted Date

Mar 27, 2026

Due Date

Apr 28, 2026

Progress57%
Town of Jonesville

Work includes rehabilitation of 200,000 gal 64' dia concrete clearwell, two story filter building addition approx 22' x 28', addition will include two (2) 9' by 10' gravity filters, associated site work, rehabilitation of the existing two (2) 9 ft x 10 ft gravity filters, scada system components.

Posted Date

Mar 31, 2026

Due Date

May 5, 2026

Progress41%
Bci Municipal (Sewer) Authority

Provide waste water treatment plant improvements. Construction of a new treatment building which will have equipment including sequencing batch reactors, aerobic digesters, and all pumps, blowers, piping, wiring, and appurtenances necessary. Construction also includes rehabilitation of the existing control building and sewage pump stations, as well as new influent wet well, effluent aeration, and chemical storage facilities. Work also involves demolition of all decommissioned equipment and piping. Bids are requested for the following Contracts: Contract 2026-1: General/Mechanical Work, Contract 2026-2: HVAC Work, Contract 2026-3: Plumbing Work, Contract 2026-4: Electrical Work & Contract 2026-5: Pump Station Work.

Posted Date

Mar 3, 2026

Due Date

Apr 17, 2026

Progress94%
City of Watertown

Process chemicals for the water treatment plant.

Posted Date

Mar 27, 2026

Due Date

Apr 23, 2026

Progress68%
Oakmont Borough Municipal (Water) Authority

Work consists of the hauling and disposal of water treatment plant dewatered sludge.

Posted Date

Apr 7, 2026

Due Date

May 20, 2026

Progress17%
Town of Rockport

Installation of ventilation-and-heating-only air handling units, boiler circulation pump replacements, replacement of hot-water unit heaters, heat pump installations and associated supporting electrical and controls.

Posted Date

Mar 25, 2026

Due Date

Apr 23, 2026

Progress70%
City of Chillicothe

Provide chemicals.

Posted Date

Mar 20, 2026

Due Date

Apr 14, 2026

City of Fernley

The City of Fernley is soliciting statements of qualifications from engineering consultants for the expansion and improvement of its water treatment plant to treat surface water from the Truckee River. The project scope includes modifications for PFAS removal, taste and odor control, and site improvements such as new sedimentation basins and reservoir overflow channels. The selected consultant will also provide electrical and SCADA integration, regulatory permitting support, and construction-related services.

Posted Date

Apr 8, 2026

Due Date

May 8, 2026

Progress21%
City of Hubbard

Project location includes The City of Hubbard Water Treatment Plant at 3101 2nd St., areas located on 2nd St., and on the lot at 3050 2nd St.. The work to be performed consists of upgrading the WTP and includes removal and/or relocation of existing equipment at the site; furnishing and installing new equipment including a new pump system, water filter unit, filter media, upgraded backup generator, updated SCADA system, a new well house; and the associated civil, architectural, structural, plumbing, mechanical, and electrical improvements required to support the project. Complete installation of the new facilities shall include, but not be limited to, providing a constant pressure pumping system that will provide potable water to the City's existing distribution system as identified within the project Specifications and as shown on the project Drawings.

Posted Date

Mar 25, 2026

Due Date

Apr 23, 2026

Progress70%
City of Gainesville

Provide water treatment plant chemical improvements project. The riverside wtp improvements consist of the replacement of the fluoride and polyphosphate feed systems with bulk storage tanks, chemical day tanks, and chemical transfer and feed pumps. The lakeside wtp improvements consist of the installation of a pre-purchased onsite sodium hypochlorite generation (oshg) system and brine tank.

Posted Date

Feb 25, 2026

Due Date

Apr 23, 2026

Progress85%
Village of Carpentersville

Work will consist of 710 feet of open-cut 8" sanitary sewer, sanitary service r&r, sanitary valves in vaults, connections, abandonments, patching and overlay, curb and gutter r&r, sidewalk r&r, clearing, restoration, and all other ancillary work.

Posted Date

Mar 26, 2026

Due Date

Apr 30, 2026

Progress55%
City of Big Rapids

Work includes improvements to two existing clarifiers at the water treatment plant including recoating of existing steel mechanisms and support structures, recoating of clarifier room ceiling, repair of concrete spalls at clarifier perimeter railing, replacement of clarifier rubber skirt, and all related work.

Posted Date

Mar 19, 2026

Due Date

Apr 14, 2026

City of Wellston

Work includes water treatment plant improvements.

Posted Date

Apr 1, 2026

Due Date

May 5, 2026

Progress39%
City of Atlantic Beach

The work consists of the demolition and removal of the existing gas chlorine tanks, gas detection equipment, fill equipment, hoist, crane rail, solenoids, injection systems and all associated control systems. The contractor shall furnish and install two (2) 500- gallon double- walled liquid chlorine storage tanks, complete with chemical feed pumps and all required valves, piping, supports and appurtenances. The work shall also include all necessary electrical conduit, wiring, control systems and panels required to provide a complete and fully operational chlorine storage and feed system

Posted Date

Mar 26, 2026

Due Date

Apr 22, 2026

Progress71%
Town of Orange

The Town of Orange issued a PPEA solicitation for the rehabilitation of its Water Treatment Plant filter system, including the replacement of granular filter media and repair of underdrains. The project involves structural and process improvements to filtration units to meet Virginia Department of Health standards. The estimated value of the project ranges from $500,000 to $1,500,000 with a response deadline in April 2026.

Posted Date

Jan 23, 2026

Due Date

Apr 22, 2026

Progress91%

Win More Water Infrastructure RFPs

Get AI-powered buying signals and real-time alerts for water infrastructure opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available