Tallula New Water Treatment Plant
Posted
-
Dec 16, 2026
Construction of a new 200 gpm well, two (2) new below ground concrete detention tanks, a 36’ x 56’ pre-engineered building, four (4) vertical pressure filters, two (2) 200 gpm high-service pumps, chemical feed equipment, finished water main, site piping, electrical, controls, site grading, finished grading, backwash lagoons, and demolition of the existing water treatment plant and associated structures.



