12" Water Transmission Line Improvements
Posted
Aug 13, 2026
Sep 3, 2026
Work includes approx. 7,357 LF of 12" PVC C900 DR-18 (trenching), 36 LF of 12" PVC C900 DR-18 (by bore), 36 LF of 20" steel encasement (by bore), 3 EA of 12" gate valves and boxes, 2 EA of 12" x 12" tapping sleeves and valves with boxes, 4 EA of 12" x 6" tees, 9 LB of 12" 45° bends, 2 LF of 12" 90° bends, 3 EA of complete two-way fire hydrants, 16 SY of asphalt pavement removal and replacement with concrete, 250 LF of fence removal and replacement, 62 SY of gravel removal and replacement, and 4,905 SY of hydro mulching.