RFP Catalog/Water Infrastructure

Water Infrastructure RFPs

Track water infrastructure RFP opportunities from water utilities, water districts, and municipal water departments. Discover solicitations for water treatment plants, water meters, distribution systems, and water infrastructure projects updated daily.

City of Pueblo

Project will consist of renovation of the existing split-level, approximately 4,300 square foot wastewater headworks building includes phased demolition, construction of new staff and mechanical spaces, replacement of building systems, and envelope upgrades while maintaining plant operations.

Posted Date

Apr 21, 2026

Due Date

Jun 3, 2026

Timeline Progress95%
North Garland County Regional Water Distribution District

Wastewater treatment plant improvements.

Posted Date

May 8, 2026

Due Date

Jun 4, 2026

Timeline Progress88%
City of Coshocton

Replacement of 3 digester tanks, 2 digester boiler heat exchanger combination units, the digester mixing system, all exposed digester gas and sludge piping.

Posted Date

Apr 20, 2026

Due Date

Jun 23, 2026

Timeline Progress65%
Town of Whitewright

Work includes, but is not limited to, installation of a lift station and valve vault, cloth media disk filter, secondary clarifier, chlorine contact basin, various concrete boxes, associated mechanical equipment, yard piping and valves, trench and excavation safety, and all appurtenances

Posted Date

Feb 23, 2026

Due Date

Jun 4, 2026

Timeline Progress97%
City of Oxnard

Replacement of water-based fire protection systems.

Posted Date

May 12, 2026

Due Date

Jun 11, 2026

Timeline Progress66%
Elsinore Valley Municipal Water District

Canyon lake water treatment plant improvements fixed price design-build.

Posted Date

Mar 17, 2026

Due Date

Jun 24, 2026

Timeline Progress76%
Village of Oak Harbor

In general, the work consists of approx. construction of a head works treatment process including screening, raw sewage pumping plant electrical and controls; new Orbal oxidation ditch treatment process including grit removal, two new secondary clarifiers, new ultraviolet disinfection treatment and meter flume with outfall to the Portage River. The solids handling of the plant include modifications to the existing blower building, existing digester building, installation of a new sludge feed pump and a new sludge dewatering building with truck loading. The improvements will also include support services such as heating ventilation, plumbing, electrical, instrumentation and controls and SCADA. The existing plant is planned to be demolished as a part of the work.

Posted Date

Apr 20, 2026

Due Date

Jun 4, 2026

Timeline Progress93%
City of Pasco

Provide qualified consulting engineering firms to provide professional services for the evaluation, design, and preparation of construction documents for improvements to the city's wastewater treatment plant (wwtp). Project elements include, but are not limited to, upgrades to the non-potable water pumping system and the anaerobic digester gas storage and gas handling systems; Anticipated improvements include evaluation and replacement of non-potable water system pumps, anaerobic digester cleaning, valve replacement, and upgrades to the digester gas handling system. Work will also include evaluation and replacement of the existing digester gas storage membrane (Dystor membrane or approved equal), along with associated system components to improve reliability, safety, and operational performance.

Posted Date

May 13, 2026

Due Date

Jun 9, 2026

Timeline Progress69%
City of Howard Lake

Project includes the following Work: 1. Construction of a new groundwater treatment plant including control space, storage area, aerator, detention tank, concrete filters, clearwell, reclaim tank, chemical feed, associated equipment, and appurtenances. 2. Demolition of existing buildings. 3. Furnish and install new power distribution and generation equipment, electrical systems, process controls, and supervisory control and data acquisition (SCADA) systems. 4. Various other trades associated with the work above including HVAC, plumbing electrical controls, painting and coating systems and civil site improvements.

Posted Date

May 19, 2026

Due Date

Jun 25, 2026

Timeline Progress34%
Dallas County Park Cities Municipal Utility District

Furnishing the following itemized chemicals for water purification. Item i lime slurry (hydrated) projected annual usage: 1700 tons item ii liquid sodium hypochlorite 12% projected annual usage: 750 tons_ item iii liquid sodium hydroxide 50% projected annual usage: 2,500 gallons item iv liquid citric acid 50% projected annual usage: 5,000 gallons item v liquid hydrochloric acid 33% projected annual usage: 165 gallons item vi liquid sodium bisulfite 38% projected annual usage: 1000 gallons item vii ferric sulfate 50% solution projected annual usage: 750 tons item viii liquid ammonium sulfate projected annual usage: 155 tons all chemicals shall be ansi/nsf standard 60 approved for use in the treatment of drinking water and shall comply with the appropriate awwa standards.

Posted Date

May 21, 2026

Due Date

Jun 8, 2026

Timeline Progress60%
City of Three Rivers

Provide Water Treatment Additive chemicals (i.e., ferric chloride, chlorine, sulfur dioxide, polymer).

Posted Date

May 14, 2026

Due Date

Jun 4, 2026

Timeline Progress84%
Town of New Castle

Purchase various water treatment chemcials; liquid aluminum sulfate, hydrofluorosilicic acid, liquid polymeric phosphate, liquid sodium ortho-phosphate, and potassium permanganate to be used at a drinking water plant.

Posted Date

May 21, 2026

Due Date

Jun 22, 2026

Timeline Progress33%
South Carolina Department of Natural Resources

Water treatment services for the protection and efficient operation of HVAC water processing equipment.

Posted Date

May 26, 2026

Due Date

Jul 7, 2026

Timeline Progress14%
City of East Dublin

The City of East Dublin is soliciting bids for the supply and delivery of water treatment chemicals including liquid chlorine, hydrofluorosilicic acid, and potassium permanganate for its treatment plants. All chemicals must meet NSF 60 certification and AWWA requirements for the contract period spanning July 1, 2026, to June 30, 2027. Bidders must be authorized dealers and submit required documentation such as W-9 forms by the June 8, 2026 deadline.

Posted Date

May 22, 2026

Due Date

Jun 8, 2026

Timeline Progress57%
City of Iowa Falls

Replacement of two horizontal split case centrifugal high service pumps. The electrical power equipment associated with the pumps will also be replaced, and revisions will be made to the plant control system. The project also includes associated demolition, mechanical and other associated items.

Posted Date

May 11, 2026

Due Date

Jun 9, 2026

Timeline Progress71%
B-Y Water User District

Work includes removing and replacing existing domestic water meters with new meters and equipment compatible with automated meter reading technology. Meters are typically located in residential settings but do include agricultural, industrial, and small business settings. The project also includes replacing pressure reducing valves and dual-check valves. There are approximately 5,311 meters within the current system and are marked for replacement.

Posted Date

May 21, 2026

Due Date

Jun 4, 2026

Timeline Progress77%
City of Milledgeville

Chemicals for water treatment/wastewater treatment plants.

Posted Date

May 24, 2026

Due Date

Jun 24, 2026

Timeline Progress25%
City of Houston

Work includes 1 EA 48" build forward identification sign; 250 LF reinforced filter fabric fence; 450 LF inlet protection barriers; 1 LS fema reimbursement bid item. Demolition at thickened sludge pump station only as shown and noted on the drawings and as specified, and including salvage as noted on the drawings and as specified, for a complete and properly operating system; 1 LS demolition for all other items not 1 LS thickened sludge pump station improvements as shown and noted on the drawings and as specified, for a complete and properly operating system. See attached file.

Posted Date

Aug 5, 2026

Due Date

Jun 11, 2026

Timeline Progress0%
City of Northampton

Wastewater treatment plant sludge and grit disposal services.

Posted Date

May 18, 2026

Due Date

Jun 2, 2026

Timeline Progress91%
City of Plantation

The City of Plantation is requesting bids from licensed contractors for the Regional Wastewater Treatment Plant Administration Building Renovation Project. The scope of work includes mechanical, electrical, and plumbing renovations performed in accordance with official plans and specifications. A mandatory pre-bid meeting and site visit are required for all interested bidders prior to the June 30, 2026 deadline.

Posted Date

May 6, 2026

Due Date

Jun 30, 2026

Timeline Progress47%

Public preview limited to 5 pages

Starbridge customers get unlimited access to thousands of opportunities, contact data, and competitive intelligence.

Book a Demo →

Win More Water Infrastructure RFPs

Get AI-powered buying signals and real-time alerts for water infrastructure opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available