Airport Road Wastewater Improvements
Aug 20, 2026
Closes
Sep 23, 2026
Work inlcudes 72 LF 8" pvc astm-d3034 (10'-15' trench) including excavation and backfill (street trench); 159 LF 12" pvc astm-d3034 (10'-15' trench) including excavation and backfill (street trench); 165 LF 12" pvc astm-d3034 installed in 24" steel casing; 165 LF bore and encase with 24" steel encasement pipe (min. 7/16" wall thickness); 1 EA 5' diameter precast concrete manhole w/ composite ring and cover (all depths); 1 EA 6' diameter precast concrete manhole w/ composite ring and cover and connect to ex. 21" wastewater (all depths). See attached file.
