Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Sandy
The City of Sandy, Oregon is soliciting sealed proposals from experienced contractors for its Sewer Mainline and Manhole Rehab project, expected to take place in 2027. Bidders must comply with Oregon Prevailing Wage Rates and submit first-tier subcontractor disclosure forms within two hours of bid closing. The City reserves the right to reject any or all bids and to waive informalities.
Posted Date
-
Due Date
Sep 3, 2026
Release: -
City of Sandy
Close: Sep 3, 2026
The City of Sandy, Oregon is soliciting sealed proposals from experienced contractors for its Sewer Mainline and Manhole Rehab project, expected to take place in 2027. Bidders must comply with Oregon Prevailing Wage Rates and submit first-tier subcontractor disclosure forms within two hours of bid closing. The City reserves the right to reject any or all bids and to waive informalities.
AvailableCity of Sandy
Work consist of 4,150 lf of curb grind existing pavement, 885 sy of 2"- 4" spot/end grind existing pavement, 720 sy of deep base repair of failed roadway sections, includes saw cut, 16" common excavation, 12" of base rock. Hmac paid under ac overlay, 1,400 tn of 1/2" dense mix hmac pavement overlay, 2,100 lf of 4" wide white or yellow thermoplastic stripe, 2,100 lf of 8" wide white or yellow thermoplastic stripe, 180 sf of 12" wide white stop bars or 24" wide white thermoplastic crosswalk bars, 2' wide x 10' long continental crosswalk, 4 ea of bike markings, left turn arrows, straight & right turn arrows. See attached file.
Posted Date
Jun 8, 2026
Due Date
Jun 25, 2026
Release: Jun 8, 2026
City of Sandy
Close: Jun 25, 2026
Work consist of 4,150 lf of curb grind existing pavement, 885 sy of 2"- 4" spot/end grind existing pavement, 720 sy of deep base repair of failed roadway sections, includes saw cut, 16" common excavation, 12" of base rock. Hmac paid under ac overlay, 1,400 tn of 1/2" dense mix hmac pavement overlay, 2,100 lf of 4" wide white or yellow thermoplastic stripe, 2,100 lf of 8" wide white or yellow thermoplastic stripe, 180 sf of 12" wide white stop bars or 24" wide white thermoplastic crosswalk bars, 2' wide x 10' long continental crosswalk, 4 ea of bike markings, left turn arrows, straight & right turn arrows. See attached file.
City of Sandy
Improvements to the 10 acre park include approx. one acre of disturbance. Work includes site grading and erosion control, ROW curb ramp and sidewalk improvements along Meinig Avenue and McCormick Drive, ADA parking space and access aisle off of McCormick Drive, electrical improvements including site lighting, concrete stairs and stone site walls, ADA-accessible pathways, repaving asphalt parking lot, landscaping and lawn repair and reseeding, site preparation and coordination for three owner-provided and owner-installed prefabricated picnic shelters, site preparation and coordination for owner-provided and owner-installed restroom, and drinking fountain.
Posted Date
Apr 23, 2026
Due Date
May 13, 2026
Release: Apr 23, 2026
City of Sandy
Close: May 13, 2026
Improvements to the 10 acre park include approx. one acre of disturbance. Work includes site grading and erosion control, ROW curb ramp and sidewalk improvements along Meinig Avenue and McCormick Drive, ADA parking space and access aisle off of McCormick Drive, electrical improvements including site lighting, concrete stairs and stone site walls, ADA-accessible pathways, repaving asphalt parking lot, landscaping and lawn repair and reseeding, site preparation and coordination for three owner-provided and owner-installed prefabricated picnic shelters, site preparation and coordination for owner-provided and owner-installed restroom, and drinking fountain.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Not the norm here; only consider if truly unique. Otherwise pivot back to coops.
Coops: Frequently procures through Sourcewell, NASPO ValuePoint, and OMNIA Partners; you can gain access through the Starbridge reseller & contract-vehicle platform — reach out to your Starbridge contact to pursue onboarding.
City of Sandy allows sole source by policy, but there is no evidence of it being used in practice. No specific sole source dollar threshold surfaced. Practical notes:
Expect to provide a strong uniqueness justification and internal approvals if attempted.
Board meetings and strategic plans from City of Sandy
The board discussed the Energized Sandy grant program and evaluated specific grant applications for Cascade Investment and Development and Payola Investments. Key discussion topics included historical site usage, parking constraints for the proposed redevelopment projects, and the necessity of ensuring proper regulatory compliance for grant recipients. The board weighed the benefits of investing urban renewal funds to activate vacant properties, generate tax revenue, and enhance the district's infrastructure against challenges regarding site-specific development requirements.
The meeting featured a presentation from utility representatives regarding ongoing grid strategy, infrastructure planning, and long-term modernization efforts. Discussion centered on resiliency enhancements, including wildfire mitigation strategies like system hardening, vegetation management, and the installation of weather monitoring technology. The council reviewed specific local utility projects, including undergrounding initiatives and plans to address pole replacements that impact ADA accessibility. Additionally, the presentation covered community engagement through sponsorship programs and energy-saving demand response initiatives, such as smart thermostat adoption.
The document outlines upcoming agenda items and detailed staff reports for the SandyNet Advisory Board. Key topics include an update on the Broadband Equity and Access Deployment (BEAD) program, detailing the organization's exit from the process and the awarding of the Oregon Trail School District area to another provider. Additionally, the report covers the completion status of the Lottery Site Project, which involved fiber buildouts for businesses across Clackamas County, and future adjustments to service tier pricing.
The board discussed a land use application regarding a major partition, focusing on the potential for a parkland dedication or a trail easement. It was determined that a trail easement would be the preferred approach to support long-term trail network goals while minimizing immediate financial and maintenance burdens. Additionally, staff provided updates on the upcoming Mountain Festival, including various community events, and outlined plans for the closure and renovation of the local park, ensuring the safety of visitors and professionals involved in the project.
The Planning Commission discussed several key items, including a report from the Development Services Director covering wastewater system updates and the adoption of Moratorium 5.0. Additionally, the commission held legislative public hearings regarding proposed municipal code amendments to Chapter 17.74 concerning temporary uses and structures, and Chapter 17.08 concerning nonconforming development in alignment with Senate Bill 1561 regarding the restoration or replacement of dwellings damaged by natural or involuntary events.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Sandy's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge