RFP Catalog/Rehabilitation

Rehabilitation RFPs

Find rehabilitation services RFP opportunities from state rehabilitation agencies, vocational rehabilitation departments, and disability service providers. Browse solicitations for vocational training, assistive technology, and rehabilitation programs updated daily.

Broward County

Rehabilitation of approx. 5,900-SF of taxilane T. This rehabilitation will include milling of the existing full-strength pavement and overlay with new P-401 bituminous asphalt pavement, as well as full-depth reconstruction of a 2,200 SF portion of the taxilane with a new asphalt pavement section. Other tasks included within the construction of this project are limited shoulder reconstruction, limited taxiway edge light replacement, and new pavement markings. The project will be constructed in seven (7) main phases to minimize impacts to the aircraft traffic.

Posted Date

May 11, 2026

Due Date

Jun 11, 2026

Timeline Progress67%
Village of Deerfield

Work inlcudes 200 LF concrete curb & gutter; 500 SY concrete sidewalk and driveways; 7,500 SY remove asphalt and fine grade base; 1,300 TN hot-mix asphalt pavement.

Posted Date

May 28, 2026

Due Date

Jun 15, 2026

Timeline Progress21%
Wayne County

The County is requesting responses to select qualified contractors to expand the current list of pre-qualified contractors to provide housing and/or commercial building rehabilitation services.

Posted Date

Jun 23, 2023

Due Date

May 31, 2026

City of Newnan

Provide residential inspectors for rehabilitation on residential property under the chalk level area housing rehabilitation program.

Posted Date

Sep 22, 2025

Due Date

Sep 30, 2031

Timeline Progress11%
City of Roanoke

Seeking qualifications from Offerors interested in providing various home repair and rehabilitation services to privately owned homes participating in the Lead Safe Roanoke program.

Posted Date

Feb 10, 2026

Due Date

Jun 4, 2026

Timeline Progress97%
Texas Health and Human Services Commission

Contract inpatient, outpatient hospital services and acute inpatient comprehensive medical rehabilitation services provided to individuals with traumatic spinal cord injury (TBI) and/or traumatic spinal cord injury (SCI). The purpose of the Comprehensive and Rehabilitation Services inpatient and outpatient hospital settings to individuals with TBI and/or TSCI improve self-care, communication, and mobility in order to function more independently in the home and community. Please check the HHS Enrollment Opportunity website regularly for further information and updates.

Posted Date

Nov 14, 2023

Due Date

Aug 31, 2026

Timeline Progress91%
City and County of Honolulu

Procurement of services for the rehabilitation of localized streets in Pearl City / Aiea, Oahu, Hawaii.

Posted Date

-

Due Date

Dec 31, 2026

City of Avondale

Seeking professional home rehabilitation and/or maintenance contracting services.

Posted Date

Apr 1, 2026

Due Date

Mar 31, 2027

Timeline Progress17%
Town of Butte Falls

Sewer pump station rehabilitation including: demolition of existing concrete; demolition of existing wet well cone section; demolition of existing pumps and associated controls; installation of new wet well riser section and access door; installation of new pumps, plug valves, check valves, control panel, and level control; installation of new site flatwork concrete; modifications to existing discharge manhole.

Posted Date

Apr 24, 2026

Due Date

Jun 4, 2026

Timeline Progress92%
City of Benicia

Citywide pavement rehabilitation project. Scope of work includes - 5 Ea remove tree; 1 LS remove existing striping, markings and raised pavement markers; 119 EA adjust monument box to grade and preserve monument; 14 EA adjust storm drain manhole frame and cover to grade; 70 EA adjust sanitary sewer manhole frame and cover to grade; see attached file.

Posted Date

May 5, 2026

Due Date

Jun 2, 2026

Timeline Progress95%
Cobb County-Marietta Water Authority

Cobb County is soliciting sealed bids for the rehabilitation and replacement of ultraviolet disinfection systems at three water reclamation facilities, including Noonday Creek, Northwest Cobb, and R.L. Sutton. The project involves extensive upgrades to gates, valves, electrical systems, instrumentation, and HVAC, as well as the construction of a pre-engineered metal building. Bidders must be prequalified with the Cobb County Water System and attend a mandatory pre-bid meeting scheduled for May 21, 2026.

Posted Date

May 1, 2026

Due Date

Jun 11, 2026

Timeline Progress75%
Town of Rutherfordton

The project generally consists of furnishing and installing one (1) new grit removal system and one (1) sludge loading station, all associated electrical work, valves and piping, instrumentation, and SCADA improvements.

Posted Date

Apr 28, 2026

Due Date

Jun 4, 2026

Timeline Progress91%
County of Dane

To operate a major home rehabilitation program.

Posted Date

May 12, 2026

Due Date

Jun 23, 2026

Timeline Progress47%
City of Marshalltown

{roject includes approx. 48,000 SY of milling, 10,000 tons of asphalt overlay including interlayer base, asphalt patching, 1,340 LF concrete curb and gutter repairs, and related work on approx. 3.3 miles of existing asphalt streets. See attached file.

Posted Date

May 12, 2026

Due Date

Jun 2, 2026

Timeline Progress94%
City of Charlotte

The City of Charlotte is soliciting qualified firms to perform comprehensive inspections and rehabilitation planning for water distribution system valves. The selected vendor will assess valve condition, provide prioritized rehabilitation recommendations with cost estimates, and offer annual follow-up assessments and potential repair work over an initial three-year term with renewal options. The contract includes ongoing maintenance strategy development to minimize service interruptions and support corrective actions during the term.

Posted Date

Feb 14, 2026

Due Date

Dec 31, 2026

Timeline Progress33%
City of Detroit

Project consists of the replacement of the existing slow sand filter media and its associated underdrain collection system and includes furnishing all materials, labor, equipment, supervision, and testing for the complete construction of the slow sand filter replacement.

Posted Date

May 15, 2026

Due Date

Jun 4, 2026

Timeline Progress84%
Montgomery County

Work includes pavement rehabilitation of an existing asphalt taxilane located on the east side of the airport. The pavement is in need of repair due to its existing conditions. pavement milling, asphalt paving, isolated crushed aggregate base course construction for areas that need repair, and site stabilization with seeding and mulching for any disturbed areas.

Posted Date

-

Due Date

Jun 5, 2026

City of Lewiston

Work consist of 1,100 tn of 12.5 mm hma, 275 tn of 9.5 mm hma shim, 630 tn of hand placed hma, 650 gal of bituminous tack, 250 sy of butt joints, 11,900 sy of cold planing of streets, 2,850 sy of drives & sidewalk preparation, 10 ea of lower & adjust cb covers and grates to grade, 7 ea of adjust manhole fames and covers to grad, 6 ea of adjust manhole fames and covers to grade, 2 ea of adjust manhole fames and covers to grade, 20 ea of adjust water gate boxes and covers to grade, 5,000 lf of remove existing asphalt curb, 5,000 lf of slip-form concrete curb, 2,300 sy of loam, seed & mulch. See attached file.

Posted Date

May 18, 2026

Due Date

Jun 9, 2026

Timeline Progress62%
WSSC Water

The project consists of the repair, rehabilitation, or replacement of 0. 82 miles of defective sewer mains and laterals utilizing 4257 lf (0. 8 miles) of cured-in-place pipe (cipp) lining and eighteen (18) manholes. Removal and disposal (15 cy truckload) 5 ea, tree removal (greater than 10 dbh) 1732 in, temporary tree protection fencing (4' in height) 9,151 lf, heavy duty mulch access mat 9,418 sy, see attached file.

Posted Date

Apr 7, 2026

Due Date

Jun 3, 2026

Timeline Progress96%
Colorado Department of Natural Resources

Work inlcudes care and diversion of water and dewatering, demolition and complete removal of the existing concrete spillway, partial removal of the rcc emergency spillway and other infrastructure, construction of new concrete spillway (labyrinth control section, chute, & stilling basin), construction of new filter buttress and drain system, riprap placement for erosion protection, installation of new monitoring instrumentation.

Posted Date

May 12, 2026

Due Date

Jun 15, 2026

Timeline Progress58%

Public preview limited to 5 pages

Starbridge customers get unlimited access to thousands of opportunities, contact data, and competitive intelligence.

Book a Demo →

Win More Rehabilitation RFPs

Get AI-powered buying signals and real-time alerts for rehabilitation opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available