Summary
Construction: Remove existing pump station equipment. Complete earthwork, grading, drainage, base installation, masonry walls, and installation of site piping and electrical systems. Plant Work: Construct and install a hydropneumatic tank system, equipment building with pumps and controls, and an emergency generator. Pipeline Work: Install 12" pipeline with all fittings, valves, and required testing. Reservoir 05514 Improvements: Install pressure reducing station with valves, meters, piping, and controls, along with associated electrical and telemetry improvements. Also includes 66 LF of Furnish and install 12" cement mortar lined and coated reservoir overflow/site drain discharge piping; 922 LF Furnish and install 12" zinc coated Class 350 ductile iron potable water pipeline.