Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Great Lakes Water Authority
The Great Lakes Water Authority is soliciting bids for the installation of approximately 2,700 feet of 24-inch ductile iron water transmission main on Merriman Road in Garden City, Michigan. The project scope includes open-cut installation, cathodic protection, connections to existing 42-inch and 16-inch mains, and the installation of specified valves and vaults. Additional requirements involve traffic control, pressure testing, disinfection, and full pavement restoration following construction activities.
Posted Date
Apr 24, 2026
Due Date
Jun 5, 2026
Release: Apr 24, 2026
Great Lakes Water Authority
Close: Jun 5, 2026
The Great Lakes Water Authority is soliciting bids for the installation of approximately 2,700 feet of 24-inch ductile iron water transmission main on Merriman Road in Garden City, Michigan. The project scope includes open-cut installation, cathodic protection, connections to existing 42-inch and 16-inch mains, and the installation of specified valves and vaults. Additional requirements involve traffic control, pressure testing, disinfection, and full pavement restoration following construction activities.
AvailableGreat Lakes Water Authority
The Great Lakes Water Authority is soliciting bids for the bulk delivery of food-grade sodium bisulfite to three regional water and wastewater treatment facilities. The contract requires the supply of approximately 1,200 wet tons annually in liquid form with specific NSF certifications for drinking water safety. Bidders must meet strict delivery, quality assurance, and insurance requirements for a one-year contract term with two optional one-year renewals.
Posted Date
Apr 15, 2026
Due Date
May 11, 2026
Release: Apr 15, 2026
Great Lakes Water Authority
Close: May 11, 2026
The Great Lakes Water Authority is soliciting bids for the bulk delivery of food-grade sodium bisulfite to three regional water and wastewater treatment facilities. The contract requires the supply of approximately 1,200 wet tons annually in liquid form with specific NSF certifications for drinking water safety. Bidders must meet strict delivery, quality assurance, and insurance requirements for a one-year contract term with two optional one-year renewals.
AvailableGreat Lakes Water Authority
This solicitation seeks contractors to perform water system improvements in various District 5 neighborhoods of Detroit, including replacement and lining of existing water mains and associated appurtenances. The work consists of replacing and lining approximately 27,514 linear feet of existing water main of various sizes, including gate valves and fire hydrants. The project has a closing date of April 28, 2026, and full documentation is available through the MITN BidNet portal.
Posted Date
Mar 26, 2026
Due Date
Apr 28, 2026
Release: Mar 26, 2026
Great Lakes Water Authority
Close: Apr 28, 2026
This solicitation seeks contractors to perform water system improvements in various District 5 neighborhoods of Detroit, including replacement and lining of existing water mains and associated appurtenances. The work consists of replacing and lining approximately 27,514 linear feet of existing water main of various sizes, including gate valves and fire hydrants. The project has a closing date of April 28, 2026, and full documentation is available through the MITN BidNet portal.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Great Lakes Water Authority
This document, an appendix to the Capital Improvement Plan for 2027-2031, provides comprehensive system background information for the Great Lakes Water Authority. It details the regional water system, including intake facilities, water treatment plants, and the extensive conveyance network. It also covers the Water Resources Recovery Facility, outlining primary and secondary wastewater treatment processes, residuals management, industrial waste control, and combined sewer overflow facilities. Additionally, it describes centralized services such as Information Technology, Fleet management, Facilities, Security, Energy Management, and Engineering support.
The Audit Committee meeting agenda focused on financial and procurement matters. Key items included the approval of the agenda, review of various financial reports such as the CFO Report, Monthly Financial Report, Gifts, Grants & Other Resources Report, Quarterly Investment Report, and Quarterly Economic Outlook Task Force Update. A central action item was the resolution for the approval of Series Ordinance 2026-01, authorizing the issuance and sale of Sewage Disposal System Revenue Bonds not to exceed $63,664,685 for FY 2026 Clean Water State Revolving Fund Projects, which include the Pump Station No. 2 Variable Frequency Drive Replacement project and Combined Sewer Overflow Facility Improvement project. The committee also reviewed the update on increasing the Micro-Purchase Annual Self-Certification Process Threshold to $50,000 and the Procurement Pipeline for February 2026.
The Audit Committee meeting included the approval of the agenda and minutes from the February 13, 2026, meeting (which itself discussed January 30, 2026 minutes). Old business focused on proposed modifications for the Fiscal Year 2027 Charges and Related Budget Impact. Key discussion involved achieving a lower charge increase balanced with long-term implications, resulting in a proposal to direct administration to adjust charges to achieve wholesale average system charge adjustments of no more than 5.8% for water and 4.27% for sewer, leading to nearly $13 million in savings from the original proposal. The committee also recommended for approval to the full Board an average charge increase of 5.5% for Water and 4.5% for Sewer.
The Audit Committee meeting agenda included the approval of the agenda and discussion regarding the January 30, 2026 minutes. Key old business involved discussion and action items related to the Proposed Fiscal Year 2027 & Fiscal Year 2028 Biennial Budget and the Proposed Fiscal Year 2027 Schedule of Charges, with resolutions set to be adopted subject to a public hearing on February 25, 2026. These action items were subsequently postponed to the February 13, 2026 Special Meeting. The committee also received and filed information regarding Debt Management Considerations. New business included scheduling a public hearing for the GLWA FY 2027 Clean Water State Revolving Fund Program Project Plan Submittals. Reports covered updates from the CFO on various financial matters including WIFIA and staff additions, the Monthly Financial Report, Gifts, Grants & Other Resources Report, Affordability & Assistance Update, Quarterly Construction Work in Progress Report, Vendor Outreach Event Update, Conflict of Interest Report Update, and the FY 2027 Updated Units of Service Report. Communications included The Procurement Pipeline.
This document, a Scoring Evaluation Tech Memo, assesses and proposes enhancements to the Great Lakes Water Authority (GLWA) Capital Improvement Plan (CIP) project prioritization method. It addresses identified limitations in the prior scoring system, which failed to adequately prioritize critically needed projects. The memo introduces a new equation that gives a 70% weighting to a project's 'single highest purpose and benefit' (Factor 1) and a 30% weighting to its overall benefits (Factor 2). This approach is designed to better align project scores with GLWA's strategic goals and objectives, emphasizing key criteria such as Regulatory compliance, Public Health & Safety, Condition, and Performance, to ensure more effective prioritization of CIP investments.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Great Lakes Water Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Chief Financial Officer and Treasurer
Premium
Access the largest public sector contact database