RFP Catalog/Rehabilitation

Rehabilitation RFPs

Find rehabilitation services RFP opportunities from state rehabilitation agencies, vocational rehabilitation departments, and disability service providers. Browse solicitations for vocational training, assistive technology, and rehabilitation programs updated daily.

Little Blue Valley Sewer District

Replace and/or install pumps, drives and other equipment to rehabilitate the South NPW Pump Station.

Posted Date

Apr 30, 2026

Due Date

Jun 2, 2026

Timeline Progress96%
Port of Oakland

Selectively remove unsound concrete from the deck soffit as detailed, prepare exposed concrete surfaces and reinforcement for repair, and placing new concrete using either shotcrete or form-and-pump methods, a full deck replacement or a deck overlay may be constructed. The scope also includes installation of anodes on the reinforcing steel. Additional marine related repairs include, but are not limited to, concrete bull rails, scuppers, utility support brackets, pile repair, rock slope replacement, deck joint seal, sheet pile repair, and bollard repair/replacement

Posted Date

-

Due Date

Jun 2, 2026

East Central Planning and Development District/Area Agency on Aging(ECPDD/AAA)

Provde Phase 2 - Historical Rehabilitation.

Posted Date

May 9, 2026

Due Date

Jun 15, 2026

Timeline Progress61%
City of Blaine

160 SY - remove bituminous pavement 300 SY - aggregate base preparation 9,500 gal - bituminous material for seal coat 27,000 SY - bituminous underseal aggregate 3,200 ton - bituminous wear course 5 ea - adjust gate valve & box 5 ea - irrigation system repair 80 SY - 8" concrete valley gutter 350 LF - concrete curb and gutter 1 ls - traffic control 13,600 LF - permanent pavement markings 7 LB -seed (including all related work and appurtenances).

Posted Date

May 14, 2026

Due Date

Jun 2, 2026

Timeline Progress93%
Derry Township

Work inlcudes 30 CY additional rock protection at bridge abutments; 200 SY mill and overlay approach roadways; 4 EA guiderails.

Posted Date

May 11, 2026

Due Date

Jun 1, 2026

Timeline Progress99%
Hennepin County

The major items of work are approx: 1 LS as built; 1 LS quality management - thermal profiling; 1 LS quality management - intelligent compaction; 1 LS mobilization; 1 each field office; 1 LS clearing and grubbing; 7 each remove pipe apron; 3 each remove sign; 2 each salvage sign; 2398 LF sawing bituminous pavement (full depth); 90 LF remove pipe culverts; 150 LF remove fence; 32 SY remove concrete driveway pavement; etc.

Posted Date

May 9, 2026

Due Date

Jun 2, 2026

Timeline Progress95%
City of Champaign

The City of Champaign has issued an Invitation to Bid for the 2026 Sewer Rehabilitation Project covering planned and unplanned (emergency) sewer and drainage rehabilitation and related pavement and restoration work. The contract includes both scheduled planned work and time-and-material emergency repairs as-needed throughout the project period. Bids are to be submitted sealed to the City of Champaign per the solicitation instructions on the City procurement portal.

Posted Date

May 9, 2026

Due Date

Jun 2, 2026

Timeline Progress95%
Borough of Honey Brook

The work will consist of approx. 1,060 LF street rehabilitation. The work will be primarily 1.5” mill and overlay, with select areas of base repair, as directed by the Borough and the Borough’s engineer. The scope also includes some areas to receive Petromat and line striping.

Posted Date

-

Due Date

Jun 1, 2026

Bureau of Indian Affairs

This is a federal solicitation for the rehabilitation and modernization of the Bannock Pumping Plant near Chubbuck, Idaho. The solicitation was posted by the Department of the Interior, Bureau of Indian Affairs (Central Office) and solicits sealed bids for construction work. Bids are due on 2026-07-10 and the opportunity is currently active.

Posted Date

May 7, 2026

Due Date

Jul 10, 2026

Timeline Progress39%
County of Ocean

Work consist of pavement and subsurface soil exploration along taxiway A.

Posted Date

May 13, 2026

Due Date

Jun 9, 2026

Timeline Progress69%
Township of Derry

The Derry Township Supervisors are seeking bids for the rehabilitation of the Nolan Drive Bridge located in Mifflin County, Pennsylvania. The project involves structural improvements and maintenance work to ensure the bridge's continued safety and functionality. Contract work is expected to commence immediately upon award with a final completion deadline set for June 1, 2026.

Posted Date

May 11, 2026

Due Date

Jun 1, 2026

Timeline Progress99%
City of Laguna Hills

In general, the work is comprised of public works construction including play equipment and safety surfacing installation, site furnishing replacement and installation, park monument sign installation, concrete flatwork installation, landscape and irrigation installation and other miscellaneous improvements.

Posted Date

May 11, 2026

Due Date

Jun 19, 2026

Timeline Progress53%
Lakehurst Water And Sanitation District

Work includes approx. 3,290 LF of 10" trenchless pipeline rehabilitation with cured-in-place pipe lining; 44 VF of manhole rehabilitation-lining and associated repairs; 113 EA of remove steps; 1 EA of repair joint and seal with non- shrink grout, repair bench and invert; 1 EA of remove debris from invert.

Posted Date

May 13, 2026

Due Date

Jul 8, 2026

Timeline Progress33%
Roseburg Urban Sanitary District

The proposed work generally consists of the rehabilitation via cured-in-place-pipe (CIPP) of approx. 3,900-LF of 36" and 42" diameter trunk sewer main, and 500-LF of collector sewers, rehabilitation of 17 lateral service lines, rehabilitation of 10 manholes along with frame and cover replacements, construction of four new 72" manholes with a corrosion resistant liner, and the removal of three existing 48" manholes. All work which requires bypassing of the large diameter trunklines and adjacent manholes.

Posted Date

May 13, 2026

Due Date

Jun 3, 2026

Timeline Progress89%
Department of Agriculture

This combined synopsis/solicitation issued by the U.S. Forest Service requests quotations for rehabilitation work on Crane Lake Dam in the Mark Twain National Forest. Work includes clearing organic material, removing training walls, installing new conduit and level control structures, and armoring the spillway with Hydroturf CS. The acquisition is a Total Small Business Set-Aside with a period of performance from July 2026 through June 2027.

Posted Date

Apr 28, 2026

Due Date

Jun 11, 2026

Timeline Progress77%
Town of Payson

The Town of Payson is soliciting Statements of Qualifications from qualified aquatic facility contractors or design-build teams to rehabilitate and potentially expand the Taylor Pool and adjacent bathhouse. The project aims to modernize the facility to meet current codes for accessibility, energy efficiency, and safety through a Design-Build delivery method. Sealed submissions are due by July 1, 2026, following a mandatory pre-proposal meeting in May.

Posted Date

May 8, 2026

Due Date

Jul 1, 2026

Timeline Progress44%
Houlton Water Company

The Project includes Demolish existing clarifier drives, motors, mechanisms, access bridge, scum trough, and other ancillary equipment and supports. Furnish and install new process equipment in both clarifiers, including a new clarifier drive assembly, hot-dip galvanized clarifier mechanisms, access bridge, scum trough, and other ancillary equipment and supports. Provide stainless steel clarifier mechanisms and scum trough.

Posted Date

-

Due Date

Jun 9, 2026

City of Saint Peters

Work includes approx 1,116 VF manhole lining; 576 SF 370 PS3 wet well lining 6'x6'x24'; 8 VF 7270MH290 370 PS3 force main discharge MH.

Posted Date

May 6, 2026

Due Date

Jun 2, 2026

Timeline Progress95%
City of Laguna Hills

Park rehabilitation. Scope of work includes - 1 LS drinking fountain demo; 206 SF drinking fountain paving demo; 1 LS drinking foundation; 191 SF concrete paving at drinking foundation; 214 SF modify lawn and irrigation at drinking foundation; see attached file.

Posted Date

May 11, 2026

Due Date

Jun 19, 2026

Timeline Progress53%
New York State Office of Parks, Recreation and Historic Preservation

Work includes but not limited to: exterior rehabilitation and limited interior alterations to the downs clubhouse, as well as accessibility upgrades to the pool complex, and pool and tennis pro shop and concessions outbuilding restrooms. Alternate work includes: refreshment & tennis pavilion upgrades and telecommunications upgrades.

Posted Date

May 20, 2026

Due Date

Jun 23, 2026

Timeline Progress34%

Win More Rehabilitation RFPs

Get AI-powered buying signals and real-time alerts for rehabilitation opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available