RFP Catalog/Infrastructure

Infrastructure RFPs

Search infrastructure RFP opportunities from state DOTs, county public works departments, and municipal infrastructure agencies. Find solicitations for road construction, bridge projects, utilities, and infrastructure maintenance updated daily.

Pinellas County

This solicitation is an Invitation to Bid for an Infrastructure Repair Work Order Contract to perform standalone repair work orders across Pinellas County, including concrete repairs, site cleanup, milling and resurfacing, landscaping, fencing, sidewalk repairs, ADA ramps, sheet pile installation, and related incidental items. The procurement is a sealed, multi-step process (Step 1 question/qualification deadlines on July 3 and July 7, 2026 at 3:00 PM ET, with a Step 2 final bid submission deadline on July 28, 2026 at 3:00 PM ET). Contact information listed for procurement inquiries is Curtis Goss, Procurement Analyst (cgoss@pinellas.gov, (727) 464-4001); no primary PDF/DOCX file URL was present in the extracted buyer page.

Posted Date

Jun 25, 2026

Due Date

Jul 28, 2026

Timeline Progress72%
City of Winston-Salem

Progressive Design-Build project for new sewer main construction, stream restoration, and stormwater infrastructure analysis and upgrade.

Posted Date

-

Due Date

Sep 30, 2026

Kentucky Transportation Cabinet

This project intends to reroute a segment of gravity line and replace an existing Pump Station and Force Main serving the I-65 Northbound Welcome Center in Simpson County, KY. The gravity portion will require directional bore under a pavement segment to maintain truck traffic. The manhole immediately upstream of the station will be replaced with a “pretreatment” grinder/manhole combination called a “Muffin Monster”. The current station has developed consistent malfunction and requires the KYTC to mobilize a pump trunk to evacuate the existing pump station wet well at an exorbitant monthly cost. It is suspect the existing force main has developed downstream issues affecting the ability of the existing system to function. The KYTC, through the KY Dept of Finance and DECA, elected to replace the station and force main. A portion of the force main traverse’s private property (KY DOWNS Gaming, Horse Racing and Hotel Complex) and will require a utility easement for new routing until it ends at an existing sewer manhole owned and maintained by the City of Franklin. This manhole will be reconstructed as part of the project.

Posted Date

Jun 16, 2026

Due Date

Jul 22, 2026

Timeline Progress91%
City of Milton

Work includes cdbg infrastructure improvement.

Posted Date

Jul 2, 2026

Due Date

Aug 5, 2026

Timeline Progress49%
Tualatin Valley Fire & Rescue

Tualatin Valley Fire & Rescue (TVF&R) seeks quotes to provide infrastructure installation for drone docking stations on the roofs of TVF&R Fire Stations #51, #61, and #69. The solicitation was posted/available on July 7, 2026 and a mandatory site walk is scheduled for Tuesday, July 14, 2026. The bid opening (proposal due) is scheduled for July 31, 2026 at 2:00 PM and Addenda 1 revised the bid opening date and the quote form.

Posted Date

Jul 7, 2026

Due Date

Jul 31, 2026

Timeline Progress49%
Interest On Lawyer Account (IOLA)

Seeks to fund the development of an inclusive, collaborative governance structure for its justice infrastructure project. The justice infrastructure project's vision includes the legal services community owning, maintaining, and governing the resulting tools and improvements developed for the civil legal justice ecosystem.

Posted Date

Jul 3, 2026

Due Date

Jul 30, 2026

Timeline Progress58%
Alief Independent School District

Alief Independent School District (AISD) is seeking competitive sealed proposals (CSP) from qualified proposers to provide construction services for the installation of DC fast EV charging infrastructure at the Alief Transportation Center located at 6150 Synott Rd, Houston, TX 77083 (NAICS 237990). A mandatory pre-bid conference is scheduled for July 1, 2026 at 10:00 AM CT at the Alief ISD Maintenance Building, and written questions are due by July 17, 2026 at 2:00 PM CT. Proposals must be submitted electronically through the District's IonWave e-procurement portal by the deadline of July 24, 2026 at 2:00 PM CT.

Posted Date

Jun 26, 2026

Due Date

Jul 24, 2026

Timeline Progress81%
Homewise Inc.

Include earthwork, stormwater improvements, retaining walls, water utilities, sewer utilities, grading, paving, signage, and striping.

Posted Date

Jul 2, 2026

Due Date

Jul 31, 2026

Timeline Progress58%
City of Cabot

Cloud Migration of Server Infrastructure

Posted Date

Jul 12, 2026

Due Date

Aug 25, 2026

Timeline Progress15%
City of Cabot

Cloud Migration of Server Infrastructure

Posted Date

Jul 12, 2026

Due Date

Aug 25, 2026

Timeline Progress15%
Orange County

Work include the removal and replacement of damaged infrastructure, including sidewalks, curbs, gutters, driveway approaches, and pedestrian ramps. In certain instances, the work may also include the construction of new sidewalks in areas where no existing sidewalk is present, as well as the removal of asphalt up to 4" in depth. Work may additionally require the placement or removal of excess soil to accommodate the installation of 4" or 6" concrete to the specified grade and elevation, 575,000 SF replace concrete 4"; 15,000 SF new concrete 4"; 500 EA concrete pedestrian ramps, including detectable warning surface, curb, asphalt patch (CR-A through CR-L including medians); 125 EA concrete pedestrian ramps, including detectable warning surface, curb, asphalt patch (radial sidewalk ramps). See attached file.

Posted Date

Jul 14, 2026

Due Date

Aug 18, 2026

Timeline Progress14%
Federal Prison Industries - UNICOR

The solicitation (SV0218-26) issued by Federal Prison Industries (UNICOR) seeks electrical infrastructure upgrades—including a new utility service with a pad-mounted transformer and distribution equipment upgrades—to support new and future injection molding machines at FCI Butner. It is a Small Business (SBA) set-aside under NAICS 238210 and includes technical specifications and bond forms attached. The place of performance is Butner, NC and the solicitation was posted on 2026-06-23 with proposals due 2026-08-05.

Posted Date

Jun 23, 2026

Due Date

Aug 5, 2026

Timeline Progress60%
Allegheny County

Provision of infrastructure sustainability & modernization assessment.

Posted Date

Jun 11, 2026

Due Date

Jul 22, 2026

Timeline Progress92%
Veazie Sewer District

Work include improvements to two (2) wastewater pump stations, the wastewater treatment facilities, headworks infrastructure, scada systems, and associated appurtenances. The vsd also intends to purchase sewer main inspection and cleaning equipment.

Posted Date

Jun 20, 2026

Due Date

Jul 21, 2026

Timeline Progress93%
U.S. Army Engineer District ST Louis

The U.S. Army Corps of Engineers, St. Louis District issued a presolicitation (W912P926BA008) to provide federal construction assistance to the Metropolitan St. Louis Sewer District (MSD) for sewer rehabilitation using Cured-In-Place Pipe (CIPP) methods. The initial work covers approximately 2,675 linear feet of 21- to 24-inch sewers within MSD Service Area 1, performed at various sites across the MSD service area in St. Louis City and St. Louis County, MO. This notice is a procurement presolicitation (not a grant) and is active on SAM.gov; solicitation documents will be made available through the PIEE solicitation module.

Posted Date

Jun 23, 2026

Due Date

Jun 23, 2027

Timeline Progress7%
City of Saint Albans

Furnishing and installing a complete advanced metering infrastructure system including, but not limited to, labor, equipment, materials, and performing all work.

Posted Date

-

Due Date

Aug 6, 2026

Broward County

Broward County's Purchasing Division is soliciting sealed bids under solicitation BLD2131859B1 to establish an open-end contract for the routine cleaning, maintenance, inspection, and repair of stormwater and wastewater infrastructure at the Port Everglades Department. The contract has a one-year initial term with four optional one-year renewals, a 120-day bid validity period, a $75,000 pass-through allowance, and an OESBD CBE Reserve goal. Bid bonding is required, and vendors must submit the specified affidavits, insurance documentation, and related forms; questions are due by July 14, 2026, with sealed responses due July 23, 2026.

Posted Date

Jun 29, 2026

Due Date

Jul 23, 2026

Timeline Progress82%
National Guard Bureau (NGB)

Provide all personnel, equipment, materials, and quality control necessary to engineer, design, install, terminate, and test the copper and fiber Inside Plant (ISP) telecommunications infrastructure within Building 1040.

Posted Date

Jul 14, 2026

Due Date

Jul 30, 2026

Timeline Progress30%
City of Ponca City

Work consist of 200 lf of 3" pvc sch. 40 plastic conduit bored, 100 lf of 3" pvc sch. 40 plastic conduit trenched, 3 ea of pull box(size i) concrete, 10 ea of remove ug wires at intersection, 9.25 ea of remove pole wires at intersection, 9,840 lf of 1/c no. 10 elect. Cond. , 220 lf of 2/c traffic signal electrical cable, 10 ea of set traffic signal controller assembly, 1,200 lf of 7/c traffic signal electrical cable. See attached file.

Posted Date

Jul 14, 2026

Due Date

Aug 6, 2026

Timeline Progress21%
Texas Water Development Board

This RFP outlines the proposed requirements for water supply and infrastructure grants, detailing eligibility, funding phases, and disbursement rules for entities seeking financial assistance.

Posted Date

-

Due Date

Aug 1, 2027

Win More Infrastructure RFPs

Get AI-powered buying signals and real-time alerts for infrastructure opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available