Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP outlines the proposed requirements for water supply and infrastructure grants, detailing eligibility, funding phases, and disbursement rules for entities seeking financial assistance.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide a district-wide advanced metering infrastructure (ami) deployment solution, including provision of an ami data collection network with district-wide coverage, supply of ami compatible water meters and registers, the supply of ami radio transmitters for all district accounts, and provision of a fully functional ami meter data collection software, analysis and meter data management solution.
Posted Date
Dec 8, 2025
Due Date
Feb 9, 2026
Release: Dec 8, 2025
Close: Feb 9, 2026
Provide a district-wide advanced metering infrastructure (ami) deployment solution, including provision of an ami data collection network with district-wide coverage, supply of ami compatible water meters and registers, the supply of ami radio transmitters for all district accounts, and provision of a fully functional ami meter data collection software, analysis and meter data management solution.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide, configure and deliver Multi- Gig Network switch, power supply, and cloud license to complement existing Aruba Network infrastructure. 80 EA HPE Aruba 6200M 36G 12SR5 (48 Port) Class6 PoE 4SFP+ Switch (R8Q71A), 80 EA Aruba Switch Power Supply (JL087A), 15 EA Aruba 10G SFP+ DAC Cable (J9281D), 80 EA 5 Year Aruba Central Cloud Switch Licenses and labor to setup and configure switches.
Posted Date
Jan 21, 2026
Due Date
Feb 19, 2026
Release: Jan 21, 2026
Close: Feb 19, 2026
Provide, configure and deliver Multi- Gig Network switch, power supply, and cloud license to complement existing Aruba Network infrastructure. 80 EA HPE Aruba 6200M 36G 12SR5 (48 Port) Class6 PoE 4SFP+ Switch (R8Q71A), 80 EA Aruba Switch Power Supply (JL087A), 15 EA Aruba 10G SFP+ DAC Cable (J9281D), 80 EA 5 Year Aruba Central Cloud Switch Licenses and labor to setup and configure switches.
AvailableThe owner is pleased to announce $5 million in available funding for the 2025 round of the Municipal Zero-emission Vehicle Infrastructure Grant Program. The program provides funding for municipalities to install ZEV infrastructure, including Level 2 (L2) and direct current fast charge (DCFC) electric vehicle supply equipment and equipment for dispensing hydrogen to hydrogen fuel cell vehicles, using hydrogen produced through electrolysis.
Posted Date
Oct 17, 2025
Due Date
Feb 27, 2026
Release: Oct 17, 2025
Close: Feb 27, 2026
The owner is pleased to announce $5 million in available funding for the 2025 round of the Municipal Zero-emission Vehicle Infrastructure Grant Program. The program provides funding for municipalities to install ZEV infrastructure, including Level 2 (L2) and direct current fast charge (DCFC) electric vehicle supply equipment and equipment for dispensing hydrogen to hydrogen fuel cell vehicles, using hydrogen produced through electrolysis.
AvailableProject includes electric vehicle supply equipment (EVSE) compatible with the Blue Bird Vision (Model BBCV 3310.
Posted Date
Jan 16, 2026
Due Date
Feb 17, 2026
Release: Jan 16, 2026
Close: Feb 17, 2026
Project includes electric vehicle supply equipment (EVSE) compatible with the Blue Bird Vision (Model BBCV 3310.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →