Infrastructure RFPs
Search infrastructure RFP opportunities from state DOTs, county public works departments, and municipal infrastructure agencies. Find solicitations for road construction, bridge projects, utilities, and infrastructure maintenance updated daily.
Upgrade Electrical Infrastructure
AvailableUpgrade Electrical Infrastructure .
Posted Date
Feb 13, 2026
Due Date
Apr 29, 2026
Upgrade Electrical Infrastructure
Release: Feb 13, 2026
Close: Apr 29, 2026
Upgrade Electrical Infrastructure .
AvailableInfrastructure Improvement Projects
AvailableThe City of Southfield is seeking contractor qualifications for various capital infrastructure projects including utility replacement, pavement improvements, grading/drainage improvements, and associated restoration. The solicitation is a prequalification (Request for Qualification) to document contractor performance qualifications across categories such as water main replacement, gravity sewer replacement, concrete and asphalt paving, and roadway reconstruction.
Posted Date
Jan 30, 2024
Due Date
Jan 1, 2028
Infrastructure Improvement Projects
Release: Jan 30, 2024
Close: Jan 1, 2028
The City of Southfield is seeking contractor qualifications for various capital infrastructure projects including utility replacement, pavement improvements, grading/drainage improvements, and associated restoration. The solicitation is a prequalification (Request for Qualification) to document contractor performance qualifications across categories such as water main replacement, gravity sewer replacement, concrete and asphalt paving, and roadway reconstruction.
AvailableAutomated Metering Infrastructure
AvailableThe Town of Batesburg-Leesville seeks a turn-key, performance-based service to implement Automated Metering Infrastructure and related utility infrastructure improvements. The project involves installing a new metering system and providing related services to improve the town's utility operations and realize utility savings.
Posted Date
Sep 8, 2025
Due Date
Sep 29, 2026
Automated Metering Infrastructure
Release: Sep 8, 2025
Close: Sep 29, 2026
The Town of Batesburg-Leesville seeks a turn-key, performance-based service to implement Automated Metering Infrastructure and related utility infrastructure improvements. The project involves installing a new metering system and providing related services to improve the town's utility operations and realize utility savings.
AvailableITS Infrastructure Services
AvailableThe Iowa Department of Transportation (Construction) issued an ITS Infrastructure Services solicitation (ID 07-0206-074) to procure intelligent transportation systems and infrastructure services. The project has an estimated value range between $5,000,000 and $20,000,000 and is categorized under computer systems design services. The official posting is hosted on the Iowa DOT BidExpress portal, where full documentation and submission instructions are maintained for registered bidders.
Posted Date
Mar 17, 2026
Due Date
Apr 21, 2026
ITS Infrastructure Services
Release: Mar 17, 2026
Close: Apr 21, 2026
The Iowa Department of Transportation (Construction) issued an ITS Infrastructure Services solicitation (ID 07-0206-074) to procure intelligent transportation systems and infrastructure services. The project has an estimated value range between $5,000,000 and $20,000,000 and is categorized under computer systems design services. The official posting is hosted on the Iowa DOT BidExpress portal, where full documentation and submission instructions are maintained for registered bidders.
AvailableElectric Vehicle Infrastructure
AvailableThe County of Fairfax Office of Environmental and Energy Coordination is seeking vendor input on the installation, operation, and maintenance of Level 2 and DC Fast Charging electric vehicle supply equipment for public use. This initiative supports the county's Electric Vehicle Readiness Strategy and aims to inform future procurement approaches regarding infrastructure planning, permitting, and utility coordination. Responses are due electronically by May 8, 2026, with a focus on reliability, equity, and sustainability within Fairfax County.
Posted Date
Mar 27, 2026
Due Date
May 8, 2026
Electric Vehicle Infrastructure
Release: Mar 27, 2026
Close: May 8, 2026
The County of Fairfax Office of Environmental and Energy Coordination is seeking vendor input on the installation, operation, and maintenance of Level 2 and DC Fast Charging electric vehicle supply equipment for public use. This initiative supports the county's Electric Vehicle Readiness Strategy and aims to inform future procurement approaches regarding infrastructure planning, permitting, and utility coordination. Responses are due electronically by May 8, 2026, with a focus on reliability, equity, and sustainability within Fairfax County.
AvailableCommunication Infrastructure Project
AvailableCounty is looking to add a third simulcast station to our network of two (2) existing site stations on our three (3) radio tower locations. This third-station site is located. The towers exist at all three site locations with equipment rooms and backup power already in place. The bid will be to provide connectivity to the countys existing k-core and prime site via microwave. The solution is to include: three (3) conventional base stations with combining equipment, antennae assemblies and microwave equipment. County currently operates on vhf but also has 800- capability as backup. Both will be operational at all three (3) site stations. A frequency coordination must also be completed by the contractor to ensure radio systems can operate interfering with each other. This involves identifying and choosing compatible frequencies for the various devices, such as microphones, in- ear monitors, and two-way radios, to prevent interference. Current equipment is motorola but county is looking for the best value solution.
Posted Date
Sep 4, 2025
Due Date
Apr 21, 2026
Communication Infrastructure Project
Release: Sep 4, 2025
Close: Apr 21, 2026
County is looking to add a third simulcast station to our network of two (2) existing site stations on our three (3) radio tower locations. This third-station site is located. The towers exist at all three site locations with equipment rooms and backup power already in place. The bid will be to provide connectivity to the countys existing k-core and prime site via microwave. The solution is to include: three (3) conventional base stations with combining equipment, antennae assemblies and microwave equipment. County currently operates on vhf but also has 800- capability as backup. Both will be operational at all three (3) site stations. A frequency coordination must also be completed by the contractor to ensure radio systems can operate interfering with each other. This involves identifying and choosing compatible frequencies for the various devices, such as microphones, in- ear monitors, and two-way radios, to prevent interference. Current equipment is motorola but county is looking for the best value solution.
AvailableThe U.S. Department of State intends to procure a fixed-price contract for the rectification of communication infrastructure at the U.S. Embassy in Kolonia, Pohnpei, FSM. This presolicitation notice indicates that the full solicitation will be launched on SAM.gov once it is ready for issuance. Interested parties must be registered in the System for Award Management (SAM) prior to contract award and may submit electronic responses via email.
Posted Date
Apr 7, 2026
Due Date
Nov 10, 2026
Rectification of Communication Infrastructure
Release: Apr 7, 2026
Close: Nov 10, 2026
The U.S. Department of State intends to procure a fixed-price contract for the rectification of communication infrastructure at the U.S. Embassy in Kolonia, Pohnpei, FSM. This presolicitation notice indicates that the full solicitation will be launched on SAM.gov once it is ready for issuance. Interested parties must be registered in the System for Award Management (SAM) prior to contract award and may submit electronic responses via email.
AvailableInfrastructure Improvement Projects.
Posted Date
Jan 30, 2024
Due Date
Jan 1, 2028
Infrastructure Improvement Projects (RFQ)
Release: Jan 30, 2024
Close: Jan 1, 2028
Infrastructure Improvement Projects.
AvailableThe Research Triangle Regional Public Transportation Authority (d/b/a GoTriangle) seeks fiber-based network infrastructure and internet services with a minimum 1 Gbps symmetrical bandwidth for sites in Durham and Morrisville, NC. The contract includes requirements for redundancy, 99.9% uptime SLAs, and 24/7 NOC support, with an initial two-year term and options for extensions up to five years. Proposals must ensure IPv6 readiness and compliance with Federal Transit Administration and state data handling standards.
Posted Date
Mar 26, 2026
Due Date
Apr 15, 2026
Network Infrastructure & Internet Services
Release: Mar 26, 2026
Close: Apr 15, 2026
The Research Triangle Regional Public Transportation Authority (d/b/a GoTriangle) seeks fiber-based network infrastructure and internet services with a minimum 1 Gbps symmetrical bandwidth for sites in Durham and Morrisville, NC. The contract includes requirements for redundancy, 99.9% uptime SLAs, and 24/7 NOC support, with an initial two-year term and options for extensions up to five years. Proposals must ensure IPv6 readiness and compliance with Federal Transit Administration and state data handling standards.
AvailableFermi National Accelerator Laboratory requests proposals for demolition, re-installation, and relocation of ducts and piping to allow future installation of the MAGIS-100 experiment in the MINOS Service Building. The subcontractor must provide all supervision, labor, materials, and equipment to complete the work per technical specifications, including plumbing and hydronic systems. This solicitation is a Total Small Business set-aside with proposals due by May 6, 2026.
Posted Date
Mar 26, 2026
Due Date
May 6, 2026
MAGIS-100 Infrastructure Modifications
Release: Mar 26, 2026
Close: May 6, 2026
Fermi National Accelerator Laboratory requests proposals for demolition, re-installation, and relocation of ducts and piping to allow future installation of the MAGIS-100 experiment in the MINOS Service Building. The subcontractor must provide all supervision, labor, materials, and equipment to complete the work per technical specifications, including plumbing and hydronic systems. This solicitation is a Total Small Business set-aside with proposals due by May 6, 2026.
AvailableConstruct 600 LF 21" sanitary sewer, 600 LF 12" water main, 400 LF 30" storm sewer and 2,300 SY 6" thick concrete pavement and other such work. See outside link.
Posted Date
Mar 20, 2026
Due Date
Apr 16, 2026
6th Street Infrastructure Improvements
Release: Mar 20, 2026
Close: Apr 16, 2026
Construct 600 LF 21" sanitary sewer, 600 LF 12" water main, 400 LF 30" storm sewer and 2,300 SY 6" thick concrete pavement and other such work. See outside link.
AvailableThe City of Champaign is soliciting sealed bids for the 2026 Infrastructure Maintenance Project, which includes alley reconstruction, sidewalk repairs, and traffic signal upgrades across various city locations. Bids must be submitted to the City Clerk's office by the deadline for a public opening in the Council Chambers. Detailed bid documents are available at no charge from ESCA Consultants, Inc. upon request via email.
Posted Date
Apr 9, 2026
Due Date
Apr 21, 2026
2026 Infrastructure Maintenance Project
Release: Apr 9, 2026
Close: Apr 21, 2026
The City of Champaign is soliciting sealed bids for the 2026 Infrastructure Maintenance Project, which includes alley reconstruction, sidewalk repairs, and traffic signal upgrades across various city locations. Bids must be submitted to the City Clerk's office by the deadline for a public opening in the Council Chambers. Detailed bid documents are available at no charge from ESCA Consultants, Inc. upon request via email.
AvailableSeeking the services of an experienced, licensed, and qualified contractor/vendor to provide IT network infrastructure design, deployment, configuration, and related services.
Posted Date
Mar 25, 2026
Due Date
Apr 24, 2026
IT Network Infrastructure & Systems (RFP)
Release: Mar 25, 2026
Close: Apr 24, 2026
Seeking the services of an experienced, licensed, and qualified contractor/vendor to provide IT network infrastructure design, deployment, configuration, and related services.
AvailableThe City of New York issued solicitation EPIN 06826Y0473 seeking a DevOPS Engineer (IT Infrastructure) to provide IT infrastructure and network services support, including deployment automation and system monitoring. The solicitation was released on April 9, 2026, and is scheduled to close on April 22, 2026, at 4:00 PM. Full solicitation text and attachments are hosted on the City of New York PASSPort portal and require a vendor login for access.
Posted Date
Apr 9, 2026
Due Date
Apr 22, 2026
06826Y0473-DevOPS Engineer (IT Infrastructure)
Release: Apr 9, 2026
Close: Apr 22, 2026
The City of New York issued solicitation EPIN 06826Y0473 seeking a DevOPS Engineer (IT Infrastructure) to provide IT infrastructure and network services support, including deployment automation and system monitoring. The solicitation was released on April 9, 2026, and is scheduled to close on April 22, 2026, at 4:00 PM. Full solicitation text and attachments are hosted on the City of New York PASSPort portal and require a vendor login for access.
AvailableThe U.S. Department of State (Embassy of the United States in Kolonia, Pohnpei, FSM) posted a presolicitation for the installation of WiFi infrastructure in the Chancery compound. This is a fixed-price contract opportunity requiring vendors to be registered in SAM and to submit electronic proposals via email with file-size limits; the solicitation page indicates the solicitation was not yet issued on the SAM posting date. The notice shows a published date of 2026-01-14 and an inactive/close date of 2026-08-14, and no primary solicitation attachment is present on SAM.
Posted Date
-
Due Date
Aug 14, 2026
Close: Aug 14, 2026
The U.S. Department of State (Embassy of the United States in Kolonia, Pohnpei, FSM) posted a presolicitation for the installation of WiFi infrastructure in the Chancery compound. This is a fixed-price contract opportunity requiring vendors to be registered in SAM and to submit electronic proposals via email with file-size limits; the solicitation page indicates the solicitation was not yet issued on the SAM posting date. The notice shows a published date of 2026-01-14 and an inactive/close date of 2026-08-14, and no primary solicitation attachment is present on SAM.
AvailableThe City of Keene is soliciting bids for the Downtown Infrastructure Improvements Project to reconstruct and upgrade Main Street, Railroad Square, and Central Square. The project scope includes the installation of new drainage, water, and sewer systems, as well as improvements to sidewalks, traffic signals, and landscaping. This 36-month construction contract has an estimated budget between $10,000,000 and $50,000,000.
Posted Date
Mar 16, 2026
Due Date
Apr 16, 2026
Downtown Infrastructure Improvements Project
Release: Mar 16, 2026
Close: Apr 16, 2026
The City of Keene is soliciting bids for the Downtown Infrastructure Improvements Project to reconstruct and upgrade Main Street, Railroad Square, and Central Square. The project scope includes the installation of new drainage, water, and sewer systems, as well as improvements to sidewalks, traffic signals, and landscaping. This 36-month construction contract has an estimated budget between $10,000,000 and $50,000,000.
AvailableThis project includes the deployment of a multi-utility AMI system, replacement of all existing meters, migration of legacy data from FOXPRO to a modern SQL database, and the establishment of robust data retention and ownership protocols. The objective is to modernize metering, enhance operational efficiency, and ensure secure, scalable, and compliant data management throughout the organization. All meters must be new; reuse of existing meters or communications modules is not permitted.
Posted Date
Mar 31, 2026
Due Date
May 14, 2026
Advanced Metering Infrastructure Program
Release: Mar 31, 2026
Close: May 14, 2026
This project includes the deployment of a multi-utility AMI system, replacement of all existing meters, migration of legacy data from FOXPRO to a modern SQL database, and the establishment of robust data retention and ownership protocols. The objective is to modernize metering, enhance operational efficiency, and ensure secure, scalable, and compliant data management throughout the organization. All meters must be new; reuse of existing meters or communications modules is not permitted.
AvailableProject includes the installation of approximately 5,300 LF of 10” water line and 700 LF of 8” gravity sewer and all appurtenances.
Posted Date
Apr 2, 2026
Due Date
Apr 24, 2026
Bristow Industrial Authority Infrastructure
Release: Apr 2, 2026
Close: Apr 24, 2026
Project includes the installation of approximately 5,300 LF of 10” water line and 700 LF of 8” gravity sewer and all appurtenances.
AvailableEstablish a contract with one or more vendors to provide IT Infrastructure and Related Services. Managed IT services, Data protection, Enterprise cloud solutions, VoIP, voice and video communication, Working with AI;
Posted Date
Apr 3, 2026
Due Date
May 5, 2026
IT Infrastructure and Related Services (RFP)
Release: Apr 3, 2026
Close: May 5, 2026
Establish a contract with one or more vendors to provide IT Infrastructure and Related Services. Managed IT services, Data protection, Enterprise cloud solutions, VoIP, voice and video communication, Working with AI;
AvailableWork consist of landscape, irrigation, abandon existing valve, 2 EA of cut & cap pipe, 272 LF of 8" PVC water pipe, 278 lf of 12" PVC water pipe, 422 LF of 12" PVC water pipe, fire hydrant assembly & lateral, 7 EA of 1" water service line, 1 ea of 1" air vacuum release valve, 3 EA of 12" gate valve, 9,684 SF of permanent pavement restoration, 280 SF of concrete restoration, 104 LF of 12" DIP water pipe, 104 LF of 20" steel casing. See attached file.
Posted Date
Apr 3, 2026
Due Date
Apr 30, 2026
Washington District Infrastructure Upgrade
Release: Apr 3, 2026
Close: Apr 30, 2026
Work consist of landscape, irrigation, abandon existing valve, 2 EA of cut & cap pipe, 272 LF of 8" PVC water pipe, 278 lf of 12" PVC water pipe, 422 LF of 12" PVC water pipe, fire hydrant assembly & lateral, 7 EA of 1" water service line, 1 ea of 1" air vacuum release valve, 3 EA of 12" gate valve, 9,684 SF of permanent pavement restoration, 280 SF of concrete restoration, 104 LF of 12" DIP water pipe, 104 LF of 20" steel casing. See attached file.
AvailableWin More Infrastructure RFPs
Get AI-powered buying signals and real-time alerts for infrastructure opportunities