Summary
Work include the removal and replacement of damaged infrastructure, including sidewalks, curbs, gutters, driveway approaches, and pedestrian ramps. In certain instances, the work may also include the construction of new sidewalks in areas where no existing sidewalk is present, as well as the removal of asphalt up to 4" in depth. Work may additionally require the placement or removal of excess soil to accommodate the installation of 4" or 6" concrete to the specified grade and elevation, 575,000 SF replace concrete 4"; 15,000 SF new concrete 4"; 500 EA concrete pedestrian ramps, including detectable warning surface, curb, asphalt patch (CR-A through CR-L including medians); 125 EA concrete pedestrian ramps, including detectable warning surface, curb, asphalt patch (radial sidewalk ramps). See attached file.