College RFPs
Track college RFP opportunities from community colleges, state institutions, and private campuses. Browse solicitations for academic technology, library resources, campus facilities, and student support services updated daily.
The John Jay College Auxiliary Enterprises Corporation is soliciting proposals to manage and operate food services at John Jay College, including dining rooms, cafeterias, and catering services. The project emphasizes providing healthy, affordable food options and local sourcing for the college community. The anticipated contract term is five years with two optional two-year renewals, starting in August 2026.
Posted Date
Release: -
Due Date
Close: Jun 15, 2026
Accuplacer Testing from College Board. Contract Term: 10/01/2026 - 09/30/2031
Posted Date
Release: May 19, 2026
Due Date
Close: Jun 2, 2026
Cartwright Elementary School District No. 83, on behalf of the Strategic Alliance for Volume Expenditures (SAVE) consortium, is soliciting proposals to supply STEM and college & career readiness kits, programs, and materials for multiple Arizona school districts and institutions. The procurement seeks vendors able to provide comprehensive educational products and services, with evaluation weighted across experience, personnel, offered products, cost, firm capability, and reference performance. Key deadlines include written questions due May 28, 2026, and proposals due via the Bonfire portal on June 8, 2026, for an initial one-year contract with extension options.
Posted Date
Release: May 22, 2026
Due Date
Close: Jun 8, 2026
The City University of New York is soliciting proposals for campus-wide flood mitigation at the College of Staten Island under Contract No. CSI-CUCF-11-26. This construction-related procurement is managed by the CUNY Office of Facilities Planning, Construction & Management. Interested parties must follow the detailed instructions and submission requirements provided on the official CUNY Builds website.
Posted Date
Release: May 26, 2026
Due Date
Close: Jul 1, 2026
Furnish and install a new backflow pit with backflow valves on the existing sanitary line and stormwater line. Install an associated backflow pit to accommodate both new valves, located adjacent to the bedford building egress stair lower-level exit. Repair the roof drain at the 3rd-floor roof setback. Install a new scupper on the 3rd-floor roof setback. Comply with all necessary and required mobilization and site protection, including sidewalk sheds, pipe scaffolding, netting, hoists, related site safety measures, and equipment. Concrete spalling and crack repairs.
Posted Date
Release: May 11, 2026
Due Date
Close: Jun 17, 2026
Provide preventative maintenance, inspection, and repair services for the HVAC systems located within a College facility totaling approx. 53,621 SF. See attached file.
Posted Date
Release: Apr 29, 2026
Due Date
Close: Jun 2, 2026
Paving of roadway and walkways.
Posted Date
Release: Mar 11, 2026
Due Date
Close: Jun 22, 2026
Project includes new building and site development as well as improvement to an existing service road and new sewer line.
Posted Date
Release: May 7, 2026
Due Date
Close: Jul 16, 2026
Work includes virtual learning center renovation.
Posted Date
Release: May 1, 2026
Due Date
Close: Jun 9, 2026
Seeking a tenant to lease space of approx 14,000 BOMA rentable SQ Ft of classroom space, previously used as an early learning center.
Posted Date
Release: Oct 23, 2025
Due Date
Close: May 5, 2028
Provide various bread, rolls, and other fresh bakery items.
Posted Date
Release: May 26, 2026
Due Date
Close: Jun 8, 2026
Perform asphalt and concrete services. Hardscape maintenance including paving/asphalt repair, parking lot and drive painting/marking, parking and traffic signage and concrete repairs.
Posted Date
Release: May 20, 2026
Due Date
Close: Jun 11, 2026
Perform pavement removal, sidewalk removal, 6" PCC pavement, 4" sidewalk and other items Parking Deck. Approx. 1,281 SY of 6" PCC pavement is proposed.
Posted Date
Release: May 28, 2026
Due Date
Close: Jun 11, 2026
Furnish, install and train av equipment.
Posted Date
Release: -
Due Date
Close: Jun 5, 2026
Work consists of include: Replace the existing fluorescent lighting with new LED lighting. The new lights will be configured with automation controls and daylight harvesting sensors to reduce energy consumption. Upgrade the existing emergency lighting system with new mesh network self-reporting system. Bid Alternate to include: HVAC occupancy sensor removal and HVAC integration with lighting controls.
Posted Date
Release: Apr 30, 2026
Due Date
Close: Jun 4, 2026
This RFP solicits community communication services to increase college enrollment for the district’s scholarship program, known as D2 Promise. The solicitation requests proposals from vendors to design and implement communications outreach to boost student enrollment in postsecondary programs. The RFP was published on the Rocky Mountain E-Purchasing System and specifies proposal submittal instructions and timelines.
Posted Date
Release: May 15, 2026
Due Date
Close: Jun 15, 2026
Project consists of campus wide elevator replacement project.
Posted Date
Release: May 22, 2026
Due Date
Close: Jun 2, 2026
Harrison School District Two is soliciting proposals for evaluation and reporting services aimed at increasing college enrollment among its students. The solicitation was published on May 15, 2026, and formal proposals must be submitted through the Rocky Mountain E-Purchasing System (BidNet Direct). Submissions are due by June 15, 2026, at 2:00 PM MDT.
Posted Date
Release: May 15, 2026
Due Date
Close: Jun 15, 2026
Seeking consulting firm to provide construction inspection services for the College and Metcalf mobiliry enhancement.
Posted Date
Release: May 11, 2026
Due Date
Close: Jun 11, 2026
Furnish and deliver 2 EA, Augmented Arc augmented reality welding system – Mfr # 951823 – multi-process welding simulation solution for classroom training. For beginner to advanced-level weld students 2 EA, Heavy Duty Transport Cases (set of 2) – Mfr # 951775 – Cases as described by Miller Manufacturer; 2 EA, heavy duty transport cases (set of 2) MFR # 951775 cases as described by Miller Manufacturer; 2 EA, TIG foot pedal kit, MFR # 286033 - kit as described by Miller Manufacturer.
Posted Date
Release: May 27, 2026
Due Date
Close: Jun 17, 2026
Win More College RFPs
Get AI-powered buying signals and real-time alerts for college opportunities