Starbridge
Learn more →
RFP Catalog/College

College RFPs

Track college RFP opportunities from community colleges, state institutions, and private campuses. Browse solicitations for academic technology, library resources, campus facilities, and student support services updated daily.

Santa Fe Community College

Seeking proposals for a research partner to support additional survey development, data analysis, and completion of data reports.

Posted Date

Dec 1, 2025

Due Date

Jan 16, 2026

Cuny The City College Of New York

Cauldwell Wingate is soliciting proposals from New York State‑certified MBE/WBE/SDVOB firms to perform the Shepard Hall Room 51 renovation (approx. 6,232 sq ft) at CUNY City College of New York, 259 Convent Avenue, New York, NY 10031. The project is subject to a Project Labor Agreement and includes participation goals for MWBE and SDVOB firms. Interested firms should contact Cauldwell Winget’s estimating team and obtain full documents from the NYSCR posting.

Posted Date

Dec 12, 2025

Due Date

Jan 21, 2026

Texas Department of Transportation

Work includes rehabilitation of existing road.

Posted Date

-

Due Date

Feb 5, 2026

University of Hawaii at Manoa

selective demolition; cast-in-place concrete; concrete masonry units; cold- formed metal framing; wood treatment; rough and finish carpentry; cabinets; solid surface countertops; building insulation; drainable cement board stucco system; firestopping; flashing and sheetmetal; sealants; steel door frames; wood doors; aluminum storefront framing and doors; finish hardware; glazing; gypsum board assemblies; suspended acoustical ceiling; rubber flooring; painting; cubicle curtains and track' patient bed service walls; impact resistant wall protection; identifying devices; fire alarm system; HVAC; plumbing; electrical work; and all appurtenances required to complete the work.

Posted Date

Dec 23, 2025

Due Date

Jan 16, 2026

New York Dormitory Authority

Work includes full removal of existing wood flooring in both gymnasiums. After removal of existing wood flooring and prior to new wood flooring the existing concrete slab shall be prepped and vapor barrier to be installed. New maple hardwood flooring to be installed. New court markings in accordance with ncaa standards is to be painted on new hardwood floor. John jay college's logo to be painted at center court. Remove and replace wall protection padding. Existing aluminum cladding at balcony soffit is to be removed and replaced with new aluminum cladding. Selective door & frame replacement throughout the gymnasium. Doors are to be primed & painted where replacements are not taking place. Remove and replace bleachers with new telescoping bleachers with power. Provide new receptacles & outlets in floor box in main gymnasium.

Posted Date

Jan 6, 2026

Due Date

Feb 3, 2026

Hawkeye Community College

Replacement of the existing overhead electrical distribution system serving the farm site with a new underground electrical service and distribution system for the entire farm site.

Posted Date

Nov 27, 2025

Due Date

Jan 20, 2026

Region IX Education Cooperative

Seeks a contractor that will support NMPED in recruiting high school juniors and seniors, college freshmen and sophomores, and community college students into educator preparation programs.

Posted Date

Dec 10, 2025

Due Date

Jan 8, 2026

Northwestern Michigan College

This Request for Proposal is released by the Northwestern Michigan College Purchasing Department on behalf of Northwestern Michigan College for a new AV System for the Hagerty Center as set forth herein.

Posted Date

Jun 8, 2025

Due Date

Jul 8, 2026

Community College Of Allegheny County

Provide assessment and maintenance services for building automation system and pneumatic controls. The scope includes, but is not limited to: Inspection, diagnosis, and calibration of BAS and pneumatic components such as sensors, actuators, and controllers. Testing of control loops, setpoints, schedules, and system modes to ensure accurate operation. Detailed documentation and reporting of all maintenance activities. Recommendations for system improvements or enhancements to align with best practices.

Posted Date

Dec 11, 2025

Due Date

Jan 8, 2026

Haywood Community College

This RFP is for campus onsite and online Bookstore Management Services.

Posted Date

Dec 19, 2025

Due Date

Jan 23, 2026

Bishop State Community College

Project includes, but is not limited to: furnishing all labor, materials, equipment, layout, and supervision for a new truck driving school.

Posted Date

Dec 19, 2025

Due Date

Feb 12, 2026

Mount Wachusett Community College

RFP for Banking services at Mount Wachusett Community College.

Posted Date

Jan 5, 2026

Due Date

Feb 2, 2026

New York Dormitory Authority

Work includes remove existing gwb walls and ceilings, wall tiles, floor tiles, toilet partitions, and doors and frames. Partial removal of vct or carpet on adjacent spaces impacted by work. Mep removals include existing fixtures, lighting, power and fire alarm devices, sprinklers, ductwork, diffusers and existing roof exhaust fans. The work will further include the opening of existing roof slab for new mechanical work and partial opening of existing slabs on grade for new plumbing work; new and renovated restrooms will be built with new gwb walls with tile overlay, act ceilings, porcelain tile floors, toilet partitions, and accessories. Where existing restrooms expand into adjacent spaces new finishes of floors, walls and modifications to existing ceilings will be incorporated. See attached file.

Posted Date

Dec 16, 2025

Due Date

Jan 20, 2026

Texas A&M University System

Construction manager at risk (CMAR) firm to provide pre-construction services such as constructability guidance, cost estimates, and construction schedules; provide a guaranteed maximum price (gmp); and perform complete construction services.

Posted Date

Dec 5, 2025

Due Date

Jan 8, 2026

Cuny Baruch College

Work includes repairs to the unsafe, and swarmp conditions identified in the fisp report filed including misaligned and/or loose wall panel system, cracked glass panel, deteriorated sealant joint, deteriorated mortar joint, cracked and/or spalled brick masonry, cracked and/or spalled stone masonry, cracked or spalled concrete and loose gasket.

Posted Date

Dec 29, 2025

Due Date

Feb 11, 2026

San Mateo County Community College District Office

The San Mateo County Colleges Educational Housing Corporation (Housing Corporation) is soliciting a property manager to manage three employee housing properties owned by the San Mateo County Community College District: College Vista (44 units, College of San Mateo), Cañada Vista (60 units, Cañada College), and College Ridge (30 units, Skyline College). The contractor will provide property maintenance, tenant relations, lease management, financial reporting, and regulatory compliance, with performance starting April 1, 2026 and an initial 2-year term plus up to three 1-year renewals (maximum 5 years). Proposers must be registered on the District’s PlanetBids vendor portal to submit proposals; the bid is posted and open with a submission deadline of January 21, 2026 at 2:00 PM PST.

Posted Date

Dec 29, 2025

Due Date

Jan 21, 2026

Itawamba Community College

Renovation services for indoor sports facilities at Itawamba Community College.

Posted Date

Jan 6, 2026

Due Date

Feb 5, 2026

New York Dormitory Authority

Work includes repairs to the unsafe, administrative unsafe and swarmp conditions identified in the fisp report filed including abandoned anchors, missing anchor rivets, brick efflorescence, window frame deteriorated coating, loose/missing or deteriorated flashing, sealant joint deteriorated or missing, damaged lamp/light fixture, damaged brick masonry, rusted metal screen cover, deteriorated mortar joints, cracked or spalled stone, and cracked or spalled terracotta.

Posted Date

Dec 12, 2025

Due Date

Jan 13, 2026

New York Dormitory Authority

Provide improvements to the existing campuswide underground walk-through utility tunnel system, includes the replacement and reconfiguration of high-temperature hot water (HTHW) anchors and guides, and the replacement/repair of additional HTHW pipe supports to restore proper thermal movement and load distribution. Work will also involve removal and replacement of disturbed insulation and jacketing.

Posted Date

Dec 30, 2025

Due Date

Jan 27, 2026

Public preview limited to 5 pages

Starbridge customers get unlimited access to thousands of opportunities, contact data, and competitive intelligence.

Book a Demo →

Win More College RFPs

Get AI-powered buying signals and real-time alerts for college opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available