RFP Catalog/Traffic Signal Management System

Traffic Signal Management System RFPs

Browse active Traffic Signal Management System RFP opportunities from federal, state, and local government agencies. Find solicitations, track deadlines, and discover bid opportunities updated daily.

Florida Department of Transportation

The improvements under this contract consist of milling & resurfacing, drainage improvements, curb & gutters, traffic signals, lighting, highway signing, sidewalks/bicycle path, gravity wall, raised crosswalk, and other incidental construction.

Posted Date

May 8, 2026

Due Date

Jun 10, 2026

Timeline Progress72%
Georgia Department of Transportation

The Georgia Department of Transportation issued a Public Notice of Advertisement for the SigOps Traffic Signal Operations Program to improve traffic signal operations and maintenance across three Georgia regions. The procurement anticipates multiple region-specific contracts and requires prime consultants to be prequalified in relevant traffic operations and control systems classes. The official Request for Qualifications is expected to be released in early June 2026 with initial responses due by June 3, 2026.

Posted Date

Apr 30, 2026

Due Date

Jun 3, 2026

Timeline Progress93%
Pasco County

Work inlcudes construction of a four-pole, box-span traffic signal with pedestrian signals, sidewalk connection and intersection lighting.

Posted Date

May 15, 2026

Due Date

Jun 16, 2026

Timeline Progress52%
Mahoning County

Provide traffic signal maintenance work.

Posted Date

May 26, 2026

Due Date

Jun 10, 2026

Timeline Progress38%
City of Laguna Niguel

Work consists of upgrades to the traffic signal systems. Traffic signal system upgrades include video detection systems, cctv systems, pull boxes and conduit, traffic signal controllers, ethernet switches, fiber optic cables, fiber distribution units, cables, wireless radio systems, fiber splice enclosures, inductive loop detectors, gps evp sensors, accessible pedestrian signal assemblies, traffic signal controller cabinets and foundations, service cabinets and foundations, and battery backup systems and cabinets.

Posted Date

May 14, 2026

Due Date

Jun 5, 2026

Timeline Progress81%
City of Brentwood

Work consist of 316 sy of removal of rigid pavement, sidewalk, 30 cy of sediment removal, 169 tn of mineral aggregate, type a base, grading d limestone, 1,039 sf of 4" concrete sidewalk, 7,770 sf of concrete curb ramp (retrofit), 638 sf of concrete curb ramp, 18 sf of detectable warning surface (rehabilitation), 54 cy of concrete median pavement, 120 cy of concrete combined curb & gutter, 14 cy of concrete curb, 561 sf of signs (construction), 980 lf of removable pavement marking, 15 sf of removal of pavement marking (yield line), 160 lf of removal of pavement marking (stop line). See attached file.

Posted Date

May 27, 2026

Due Date

Jun 24, 2026

Timeline Progress17%
Texas Department of Transportation

The Texas Department of Transportation (TxDOT) is soliciting bids for a state-let construction contract to install traffic signals in Dallas County at various highway locations. The project has an estimated cost of $436,623.50 and is a short-duration construction contract with required completion per the solicitation. Proposals are due on June 3, 2026, at 1:00 PM local time, and the solicitation is officially posted on the state's Electronic State Business Daily (ESBD).

Posted Date

May 8, 2026

Due Date

Jun 3, 2026

Timeline Progress91%
Clark County

Provide vast traffic signal software and atms replacement feasibility study.

Posted Date

May 20, 2026

Due Date

Jul 1, 2026

Timeline Progress28%
Texas Department of Transportation

Provide traffic signal improvements.

Posted Date

May 8, 2026

Due Date

Jun 2, 2026

Timeline Progress95%
California Department of Forestry and Fire Protection

CAL FIRE is seeking quotes for a Fuel Moisture Sensor System to be used in an 18-month pilot project across five high-priority wildfire risk sites. The project involves the installation of DRYLINE or equivalent sensors and solar-powered LoRaWAN gateways to provide automated continuous fuel moisture monitoring. Deliverables include real-time data access via a dashboard and API, monthly summary reports, and staff training.

Posted Date

May 26, 2026

Due Date

Jun 8, 2026

Timeline Progress44%
Rocky Mountain Regional Office

The solicitation requests procurement of a Traffic Camera System for a Colorado buyer and solicits vendor proposals for supply and/or services related to traffic camera equipment and related systems. The bid is published on the buyer-hosted BidNet Direct portal and includes bid documents behind a registration/login gate. The solicitation is open and closes on June 12, 2026, at 03:00 PM MDT.

Posted Date

-

Due Date

Jun 12, 2026

California Department of Transportation

Install transportation management system (TMS) elements.

Posted Date

May 4, 2026

Due Date

Jun 2, 2026

Timeline Progress96%
Village of Sunbury

Work includes approx 614 LF 3" conduit; 418 LF 3" conduit by jack and bore; 1 LS temporary sediment and erosion control.

Posted Date

May 16, 2026

Due Date

Jun 2, 2026

Timeline Progress92%
Foothill Transit Zone

Foothill Transit is soliciting bids to furnish and install upgraded traffic signal equipment, convert signal timing, and configure/test upgrades at seventeen signalized intersections along Amar Road. The IFB requires compliance with specifications and drawings provided in Part IV of the IFB, includes a remote pre-bid teleconference, and sets deadlines for questions and bid submission. The posting is on the buyer’s PlanetBids portal with bid due date 2026-07-28 at 11:00 AM PDT.

Posted Date

May 26, 2026

Due Date

Jul 28, 2026

Timeline Progress9%
North Carolina Department of Transportation

This RFQ solicits design-build services to install ADA-compliant curb ramps at multiple intersections and to install at least one traffic signal in Randolph County, North Carolina, under NCDOT Division of Highways standards. The project requires qualified contractors experienced in highway construction and traffic-signal installation, with electronic proposals submitted through NCDOT’s approved bidding platform. The RFQ lists an 11-month performance period and directs questions to Chad G. Brown, Division Proposal Engineer.

Posted Date

May 15, 2026

Due Date

Jun 9, 2026

Timeline Progress67%
City of Stockton

Work includes construction asphalt/concrete speed cushions and speed tables over existing pavement. Install thermoplastic chevrons, diamonds, and pavement marking as necessary. Install advance warning and advisory signs at each location, including bases, posts, rivets, etc. Project is a contract for construction in multiple phases.

Posted Date

May 18, 2026

Due Date

Jun 4, 2026

Timeline Progress81%
County of Sacramento

Work includes installing speed tables, speed bumps, corresponding signage, and pavement planing.

Posted Date

May 14, 2026

Due Date

Jun 11, 2026

Timeline Progress63%
City of Bell

Provide traffic control management services.

Posted Date

May 27, 2026

Due Date

Jun 5, 2026

Timeline Progress52%
City of Phoenix

Project consists of safety improvements, traffic signal system by installing new signals, incorporating flashing yellow arrows for left-turn movements, and upgrading pedestrian signal equipment. Additional improvements include upgrading of ADA-compliant curb ramps, and targeted crosswalk illumination to improve pedestrian visibility. These enhancements are intended to increase overall intersection safety by improving signal visibility, reducing conflict points, and providing safer, more accessible pedestrian crossings.

Posted Date

May 14, 2026

Due Date

Jun 9, 2026

Timeline Progress68%
New York Metropolitan Transportation Authority

Provision of intelligent transit signal priority system (ITSP).

Posted Date

Mar 30, 2026

Due Date

Jun 10, 2026

Timeline Progress87%

Win More Traffic Signal Management System RFPs

Get AI-powered buying signals and real-time alerts for traffic signal management system opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available