Roofing & Siding RFPs
Discover roofing and siding RFP opportunities from state facilities departments, county building departments, and municipal maintenance agencies. Track solicitations for roof replacement, reroofing, siding installation, and facade restoration updated daily.
Project consists of replacing four (4) 4'x4', skylights and properly repair entire roof system to receive new roof restoration coating for the plant admin and shop roofs as specified in the summary of work, approx. 5,500 SF. This is an occupied building, and the contractor is responsible for all safety requirements. The goal of the project is to provide complete watertight and warrantied roofing assembly per the manufacturer's instructions. Seeking a qualified roofing contractor to facilitate the restoration of the existing TPO (thermoplastic polyolefin) roofing system in operation. The overall goal of this project is to install a fluid applied restoration system that ensures the building is secure and free from water intrusion.
Posted Date
Apr 6, 2026
Due Date
May 8, 2026
City of Folsom Water Treatment Plant (WTP) Roof Restoration Project
Release: Apr 6, 2026
Close: May 8, 2026
Project consists of replacing four (4) 4'x4', skylights and properly repair entire roof system to receive new roof restoration coating for the plant admin and shop roofs as specified in the summary of work, approx. 5,500 SF. This is an occupied building, and the contractor is responsible for all safety requirements. The goal of the project is to provide complete watertight and warrantied roofing assembly per the manufacturer's instructions. Seeking a qualified roofing contractor to facilitate the restoration of the existing TPO (thermoplastic polyolefin) roofing system in operation. The overall goal of this project is to install a fluid applied restoration system that ensures the building is secure and free from water intrusion.
AvailableNVE+PA+PDC ReRoofing 2026
AvailableReroofing work consists of two roof areas of 4,784± SF and 9.030 ± SF horizontal area of membrane replacement (to PVC-KEE) with added insulation, gypsum roof board, gutters, downspouts and miscellaneous roofing details and minor repairs;. Reroofing work consists of 17,298± SF horizontal area of membrane replacement (to PVC-KEE) over Mechanically attached & adhered rigid insulation, 2,852 metal siding cladding, gutter replacement, downspouts and miscellaneous roofing details;. Reroofing work consists of 6,317± SF horizontal area of membrane replacement (to PVC-KEE) over adhered rigid insulation, gutter replacement, downspouts and miscellaneous roofing details.
Posted Date
-
Due Date
May 5, 2026
NVE+PA+PDC ReRoofing 2026
Release: -
Close: May 5, 2026
Reroofing work consists of two roof areas of 4,784± SF and 9.030 ± SF horizontal area of membrane replacement (to PVC-KEE) with added insulation, gypsum roof board, gutters, downspouts and miscellaneous roofing details and minor repairs;. Reroofing work consists of 17,298± SF horizontal area of membrane replacement (to PVC-KEE) over Mechanically attached & adhered rigid insulation, 2,852 metal siding cladding, gutter replacement, downspouts and miscellaneous roofing details;. Reroofing work consists of 6,317± SF horizontal area of membrane replacement (to PVC-KEE) over adhered rigid insulation, gutter replacement, downspouts and miscellaneous roofing details.
AvailableRemoval of existing Spray applied polyurethane roof coating and underlying gravel surfaced BUR system down to existing structural deck. Provide fully adhered EPDM roof system, prefinished sheet metal perimeter flashings / wall panels, and associated work. Security Building; remove and dispose of existing fully adhered EPDM in select area and EPDM roofing with tapered sump along with scupper and downspout to repair area of ponding water.
Posted Date
Mar 4, 2026
Due Date
May 6, 2026
Roof Replacement Central Services Building
Release: Mar 4, 2026
Close: May 6, 2026
Removal of existing Spray applied polyurethane roof coating and underlying gravel surfaced BUR system down to existing structural deck. Provide fully adhered EPDM roof system, prefinished sheet metal perimeter flashings / wall panels, and associated work. Security Building; remove and dispose of existing fully adhered EPDM in select area and EPDM roofing with tapered sump along with scupper and downspout to repair area of ponding water.
AvailableWork inlcudes roof replacement work should include pvc membrane roofing.
Posted Date
Apr 6, 2026
Due Date
May 6, 2026
Edison Middle School Roof Replacement
Release: Apr 6, 2026
Close: May 6, 2026
Work inlcudes roof replacement work should include pvc membrane roofing.
AvailableThe State of Delaware is soliciting bids for the Haslet Armory Shingle Roof Replacement project in Dover to replace the existing clay shingle roof with synthetic slate shingles and install new gutters. A mandatory pre-bid meeting is scheduled for April 22, 2026, and all sealed bids must be submitted electronically through the DFM Bonfire portal. The contract will be awarded to the lowest responsive bidder and requires a 10% bid security along with 100% performance and payment bonds.
Posted Date
Apr 9, 2026
Due Date
May 14, 2026
Haslet Armory Shingle Roof Replacement
Release: Apr 9, 2026
Close: May 14, 2026
The State of Delaware is soliciting bids for the Haslet Armory Shingle Roof Replacement project in Dover to replace the existing clay shingle roof with synthetic slate shingles and install new gutters. A mandatory pre-bid meeting is scheduled for April 22, 2026, and all sealed bids must be submitted electronically through the DFM Bonfire portal. The contract will be awarded to the lowest responsive bidder and requires a 10% bid security along with 100% performance and payment bonds.
AvailableThe construction of the North Regional Library Roof Replacement.
Posted Date
-
Due Date
May 12, 2026
North Regional Library Roof Replacement
Release: -
Close: May 12, 2026
The construction of the North Regional Library Roof Replacement.
Available10.10.1892-SHR WVDC Roof Replacement
AvailableThe West Valley Detention Center Roof Replacement project involves replacing the roof of the facility located in Rancho Cucamonga, California. The project has an estimated construction cost of $3,602,697.00 and requires a State Contractor's Class B license. Work includes demolition, roofing, painting, and other related construction activities as specified in the solicitation documents.
Posted Date
Apr 14, 2026
Due Date
May 14, 2026
10.10.1892-SHR WVDC Roof Replacement
Release: Apr 14, 2026
Close: May 14, 2026
The West Valley Detention Center Roof Replacement project involves replacing the roof of the facility located in Rancho Cucamonga, California. The project has an estimated construction cost of $3,602,697.00 and requires a State Contractor's Class B license. Work includes demolition, roofing, painting, and other related construction activities as specified in the solicitation documents.
AvailablePerform the quality roof recover and repairs.
Posted Date
Apr 13, 2026
Due Date
May 7, 2026
Richmond Correctional Institution- Roof Replacement
Release: Apr 13, 2026
Close: May 7, 2026
Perform the quality roof recover and repairs.
AvailableThe City of Georgetown is soliciting bids from licensed and qualified roofing contractors to replace the metal roof at the Water Utilities Administration Building. The project includes removal of the existing roof and installation of a new metal roof per the buyer's requirements; procurement documents are provided via the City’s BidNet portal. The solicitation is an Invitation for Bid (Project Number 4101), published 2026-04-15 with bids due 2026-05-13 at 2:00pm local time.
Posted Date
-
Due Date
May 13, 2026
Water Admin Building Roof Replacement
Release: -
Close: May 13, 2026
The City of Georgetown is soliciting bids from licensed and qualified roofing contractors to replace the metal roof at the Water Utilities Administration Building. The project includes removal of the existing roof and installation of a new metal roof per the buyer's requirements; procurement documents are provided via the City’s BidNet portal. The solicitation is an Invitation for Bid (Project Number 4101), published 2026-04-15 with bids due 2026-05-13 at 2:00pm local time.
AvailableThe City of Pleasanton is soliciting bids to replace the roof and roof structure over the water treatment plant filter building, including demolition, installation of a new roofing system and supporting structure, and modifications to on-site electrical and HVAC to limit treatment plant downtime. The solicitation is for a General Contract (all trades) and requires a 5% bid security, performance and payment bonds, proper licensing, and adherence to liquidated damages; a pre-bid conference is scheduled for April 29, 2026 at 10:00 AM local time. Sealed bids are due May 7, 2026 at 11:00 AM local time and must be submitted to the City Clerk at 1608 Laurel, Pleasanton, KS 66075.
Posted Date
Apr 16, 2026
Due Date
May 7, 2026
WTP Roof Replacement - Pleasanton, KS
Release: Apr 16, 2026
Close: May 7, 2026
The City of Pleasanton is soliciting bids to replace the roof and roof structure over the water treatment plant filter building, including demolition, installation of a new roofing system and supporting structure, and modifications to on-site electrical and HVAC to limit treatment plant downtime. The solicitation is for a General Contract (all trades) and requires a 5% bid security, performance and payment bonds, proper licensing, and adherence to liquidated damages; a pre-bid conference is scheduled for April 29, 2026 at 10:00 AM local time. Sealed bids are due May 7, 2026 at 11:00 AM local time and must be submitted to the City Clerk at 1608 Laurel, Pleasanton, KS 66075.
AvailableSouthern Oregon University is soliciting bids for the replacement of the existing single-ply membrane roofing at the SOU Science Building in Ashland. The project requires the removal of the current system and the installation of a new 60 mil, mechanically-fastened PVC membrane covering approximately 16,000 square feet. Qualified contractors must provide all necessary labor, materials, and equipment to complete the work within the specified timeframe.
Posted Date
Apr 24, 2026
Due Date
May 13, 2026
Science Building Membrane Roof Replacement
Release: Apr 24, 2026
Close: May 13, 2026
Southern Oregon University is soliciting bids for the replacement of the existing single-ply membrane roofing at the SOU Science Building in Ashland. The project requires the removal of the current system and the installation of a new 60 mil, mechanically-fastened PVC membrane covering approximately 16,000 square feet. Qualified contractors must provide all necessary labor, materials, and equipment to complete the work within the specified timeframe.
AvailableRoof replacement project.
Posted Date
Jul 29, 2025
Due Date
May 22, 2026
Roof Replacement Fayetteville Fire Department
Release: Jul 29, 2025
Close: May 22, 2026
Roof replacement project.
AvailableWork consists of roofing replacement and repairs.
Posted Date
Apr 22, 2026
Due Date
May 7, 2026
Center School Partial Roof Replacement
Release: Apr 22, 2026
Close: May 7, 2026
Work consists of roofing replacement and repairs.
AvailableWork include roofing replacement and repairs.
Posted Date
-
Due Date
May 22, 2026
Close: May 22, 2026
Work include roofing replacement and repairs.
AvailableRoofing replacement of the county sheriff's central complex includes removal and replacement of all roof system components down to the existing deck substrate. All associated metal flashings and sealants which interface with wall transitions and perimeters will be replaced.
Posted Date
Apr 21, 2026
Due Date
May 28, 2026
Sheriff's Central Complex Roof Replacement
Release: Apr 21, 2026
Close: May 28, 2026
Roofing replacement of the county sheriff's central complex includes removal and replacement of all roof system components down to the existing deck substrate. All associated metal flashings and sealants which interface with wall transitions and perimeters will be replaced.
AvailableThe City of Westerville is soliciting bids for the replacement of the roof and associated repairs at the Westerville Community Center located at 350 N. Cleveland Ave. The project scope includes roof removal, masonry restoration, lightning protection replacement, and mechanical and electrical modifications with an estimated base bid of $2,718,000. Bids are due by June 3, 2026, and the project is expected to be completed by December 4, 2026.
Posted Date
Apr 30, 2026
Due Date
Jun 3, 2026
Community Center 2026 Roof Replacement
Release: Apr 30, 2026
Close: Jun 3, 2026
The City of Westerville is soliciting bids for the replacement of the roof and associated repairs at the Westerville Community Center located at 350 N. Cleveland Ave. The project scope includes roof removal, masonry restoration, lightning protection replacement, and mechanical and electrical modifications with an estimated base bid of $2,718,000. Bids are due by June 3, 2026, and the project is expected to be completed by December 4, 2026.
AvailableSheriffs Substation Roof Replacement (RFP)
Release: May 1, 2026
Close: Jun 2, 2026
Roof Replacement.
AvailableFederal Prison Industries (UNICOR) is soliciting firm-fixed-price construction proposals to replace approximately 66,000 sq ft of roofing with a new TPO system and upgrade rooftop HVAC systems at FMC Lexington. The project includes masonry repairs, asbestos abatement, and mold remediation, with a required completion time of 265 days after the notice to proceed. This solicitation is set aside for competitive 8(a) Business Development Program participants and requires mandatory site-visit attendance.
Posted Date
Apr 27, 2026
Due Date
May 5, 2026
UNICOR ROOF AND HVAC REPLACEMENT - LEXINGTON
Release: Apr 27, 2026
Close: May 5, 2026
Federal Prison Industries (UNICOR) is soliciting firm-fixed-price construction proposals to replace approximately 66,000 sq ft of roofing with a new TPO system and upgrade rooftop HVAC systems at FMC Lexington. The project includes masonry repairs, asbestos abatement, and mold remediation, with a required completion time of 265 days after the notice to proceed. This solicitation is set aside for competitive 8(a) Business Development Program participants and requires mandatory site-visit attendance.
AvailableThe City of Soledad is soliciting bids to repair and/or replace the existing roofing system and appurtenances at the Historical Society building located at 137 Soledad St, Soledad, CA. Work includes removal of the existing roof, installation of new TPO roofing, and flashing and roof drain repairs, with project completion required within 60 calendar days. Bidders must hold a California C-39 Roofing Contractor license and provide a 10% bid security for this public works procurement.
Posted Date
May 1, 2026
Due Date
May 22, 2026
Historical Society Roof Replacement Project
Release: May 1, 2026
Close: May 22, 2026
The City of Soledad is soliciting bids to repair and/or replace the existing roofing system and appurtenances at the Historical Society building located at 137 Soledad St, Soledad, CA. Work includes removal of the existing roof, installation of new TPO roofing, and flashing and roof drain repairs, with project completion required within 60 calendar days. Bidders must hold a California C-39 Roofing Contractor license and provide a 10% bid security for this public works procurement.
AvailableMCCF Roof Replacement Phase 3
AvailableThe Montgomery County Correctional Facility is soliciting bids for a General Contractor to complete Phase 3 of roof replacements including demolition of existing roofing and installation of EPDM single-ply roofing. The project scope also encompasses EIFS renovation, sheet metal flashing, rough carpentry, and exterior painting per the provided specifications. This procurement is an Invitation to Bid requiring a mandatory pre-bid site meeting and compliance with prevailing wage requirements.
Posted Date
May 1, 2026
Due Date
Jun 4, 2026
MCCF Roof Replacement Phase 3
Release: May 1, 2026
Close: Jun 4, 2026
The Montgomery County Correctional Facility is soliciting bids for a General Contractor to complete Phase 3 of roof replacements including demolition of existing roofing and installation of EPDM single-ply roofing. The project scope also encompasses EIFS renovation, sheet metal flashing, rough carpentry, and exterior painting per the provided specifications. This procurement is an Invitation to Bid requiring a mandatory pre-bid site meeting and compliance with prevailing wage requirements.
AvailablePublic preview limited to 5 pages
Starbridge customers get unlimited access to thousands of opportunities, contact data, and competitive intelligence.
Book a Demo →Win More Roofing & Siding RFPs
Get AI-powered buying signals and real-time alerts for roofing & siding opportunities