Roofing & Siding RFPs
Discover roofing and siding RFP opportunities from state facilities departments, county building departments, and municipal maintenance agencies. Track solicitations for roof replacement, reroofing, siding installation, and facade restoration updated daily.
CD25241 - Roof Replacement Design
AvailableThe NYS Office for People With Developmental Disabilities (OPWDD) seeks a contractor to provide roof replacement design services for its Capital District DDSO facility, including assessment of existing roof conditions, development of design specifications and construction drawings, and compliance with applicable building codes. A mandatory site visit is required prior to bid submission. The contract period is expected to complete by 2026-05-28; bids are due 2026-05-28.
Posted Date
May 1, 2026
Due Date
May 28, 2026
CD25241 - Roof Replacement Design
Release: May 1, 2026
Close: May 28, 2026
The NYS Office for People With Developmental Disabilities (OPWDD) seeks a contractor to provide roof replacement design services for its Capital District DDSO facility, including assessment of existing roof conditions, development of design specifications and construction drawings, and compliance with applicable building codes. A mandatory site visit is required prior to bid submission. The contract period is expected to complete by 2026-05-28; bids are due 2026-05-28.
AvailableRoof Replacement Guardo Hall
AvailableRhode Island College seeks contractors to replace the entire roof of Guardo Hall, including demolition and removal of the existing roof and installation of a new roofing system. The project includes specific allowances for unforeseen conditions and alternates for different roofing materials and warranties. Construction is expected to begin immediately upon purchase order issuance with final completion targeted for late August 2026.
Posted Date
Apr 16, 2026
Due Date
May 19, 2026
Roof Replacement Guardo Hall
Release: Apr 16, 2026
Close: May 19, 2026
Rhode Island College seeks contractors to replace the entire roof of Guardo Hall, including demolition and removal of the existing roof and installation of a new roofing system. The project includes specific allowances for unforeseen conditions and alternates for different roofing materials and warranties. Construction is expected to begin immediately upon purchase order issuance with final completion targeted for late August 2026.
AvailableConcordia Hall Roof Replacement
AvailableThe University of Massachusetts (Plymouth campus) is soliciting qualified contractors to fully replace the roof of Concordia Hall per Chapter 149 specifications. This is an electronic sealed‑bid Invitation for Bid requiring registration on the buyer's bidding portal and electronic submission by the deadline. The procurement covers full roof removal, disposal, and installation of a new roofing system (single‑item scope).
Posted Date
Apr 15, 2026
Due Date
May 8, 2026
Concordia Hall Roof Replacement
Release: Apr 15, 2026
Close: May 8, 2026
The University of Massachusetts (Plymouth campus) is soliciting qualified contractors to fully replace the roof of Concordia Hall per Chapter 149 specifications. This is an electronic sealed‑bid Invitation for Bid requiring registration on the buyer's bidding portal and electronic submission by the deadline. The procurement covers full roof removal, disposal, and installation of a new roofing system (single‑item scope).
AvailableLincoln Auditorium Roof Replacement
AvailableProvide auditorium roof replacement
Posted Date
Apr 20, 2026
Due Date
May 20, 2026
Lincoln Auditorium Roof Replacement
Release: Apr 20, 2026
Close: May 20, 2026
Provide auditorium roof replacement
AvailableTremont Branch Roof Replacement
AvailableRoof replacement project.
Posted Date
Apr 17, 2026
Due Date
May 15, 2026
Tremont Branch Roof Replacement
Release: Apr 17, 2026
Close: May 15, 2026
Roof replacement project.
AvailableRoof Replacement at Si View
AvailableRemoval and replacement of all existing roofing materials and 10 sheets of plywood deck sheathing as well as 400LF of fascia board. Work includes, but is not limited to, removal and replacement of all existing roofing materials, and other tasks.
Posted Date
Apr 20, 2026
Due Date
May 20, 2026
Roof Replacement at Si View
Release: Apr 20, 2026
Close: May 20, 2026
Removal and replacement of all existing roofing materials and 10 sheets of plywood deck sheathing as well as 400LF of fascia board. Work includes, but is not limited to, removal and replacement of all existing roofing materials, and other tasks.
AvailableRoof Replacement at Hampton Greens
AvailableWork includes, but is not limited to, removal & replacement of existing roofing materials, and other tasks. Removal and replacement of all existing roofing materials and 20 sheets of plywood deck sheathing as well as 400LF of fascia board.
Posted Date
Apr 20, 2026
Due Date
May 21, 2026
Roof Replacement at Hampton Greens
Release: Apr 20, 2026
Close: May 21, 2026
Work includes, but is not limited to, removal & replacement of existing roofing materials, and other tasks. Removal and replacement of all existing roofing materials and 20 sheets of plywood deck sheathing as well as 400LF of fascia board.
AvailableGPC - Roof Replacement - 24J3E
AvailableIn general, the work consists of: the removal and replacement of the existing roof membrane in kind. The existing roof membrane is an approximate 31,000 SF ballasted 45 mill EPDM. The project is to include, but not limited to, new stone ballast, new deck board, flashing, coping, parapet cap, gutter(s), and downspout(s). The roof insulation value is to be brought up to R-25.
Posted Date
Mar 4, 2026
Due Date
May 20, 2026
GPC - Roof Replacement - 24J3E
Release: Mar 4, 2026
Close: May 20, 2026
In general, the work consists of: the removal and replacement of the existing roof membrane in kind. The existing roof membrane is an approximate 31,000 SF ballasted 45 mill EPDM. The project is to include, but not limited to, new stone ballast, new deck board, flashing, coping, parapet cap, gutter(s), and downspout(s). The roof insulation value is to be brought up to R-25.
AvailableRoof Replacement at Sterling Ridge
AvailableWork includes but is not limited to: 1. Good faith asbestos inspection(s) testing to comply with rcw 49. 26. 013 as required to achieve scope of work. 2. Removal and replacement of all existing roofing materials and 20 sheets of plywood deck sheathing as well as 400lf of fascia board. 3. Inspect all exposed roof framing for any rot or damaged materials and repair as needed. 4. Block and seal any existing gable vents from attic interior. 5. Provide and install new ½” cdx plywood deck sheathing and roofing materials according to manufacturer’s recommended installation specifications. 6. Provide and install all new approved roofing system components: a. Install approved ice and water shield roof underlayment to all critical areas and valleys. B. Install approved synthetic roof underlayment. C. Install approved composition roofing system. 7. Install metal roof vent with minimum 50 sq. In net free area ventilation. Total free area of ventilation must meet code requirements for attic ventilation. 8. Install cor-a-vent in-vent attic roof vent or approved equal. Block eave vents after installation. 9. Install all metal 24-gauge flashing components according to manufacturer’s recommendations including roof penetration flashing, roof to wall flashing, eave and rake flashings and w-valley flashing. 10. Install permanent fall arrest/restraint roof anchors and all other accessory items to complete the installation and maintenance of the roof in a safe and secure manner. 11. Install new fascia boards where there is any decay or rot that would prevent the exterior paint to be applied and warranted. Include painting of all fascia prior to installation of new gutters. (see section 1. 5 unit costs for details. ) 12. Install new 5” k-style aluminum gutters and 2”x3” aluminum downspouts to match existing locations. 13. Haul away and dispose of all debris and demolished materials. 14. Include painting all b-vent flashings, roof accessories and lead pipe flashings as needed. 15. Daily cleaning and final cleaning of all trash and debris. 16. Prevailing wage rates to be included. 17. Acceptable roofing products must meet these warranty requirements: contractor’s workmanship warranty for a period of two (2) years from final completion. Subcontractor’s labor and materials for a period of two (2) years from final completion. Roofing manufacturer’s warranty of 100% materials and labor for five (5) years without proration or reductions. Roofing manufacturer’s 40-year warranty for materials.
Posted Date
Apr 27, 2026
Due Date
Jun 17, 2026
Roof Replacement at Sterling Ridge
Release: Apr 27, 2026
Close: Jun 17, 2026
Work includes but is not limited to: 1. Good faith asbestos inspection(s) testing to comply with rcw 49. 26. 013 as required to achieve scope of work. 2. Removal and replacement of all existing roofing materials and 20 sheets of plywood deck sheathing as well as 400lf of fascia board. 3. Inspect all exposed roof framing for any rot or damaged materials and repair as needed. 4. Block and seal any existing gable vents from attic interior. 5. Provide and install new ½” cdx plywood deck sheathing and roofing materials according to manufacturer’s recommended installation specifications. 6. Provide and install all new approved roofing system components: a. Install approved ice and water shield roof underlayment to all critical areas and valleys. B. Install approved synthetic roof underlayment. C. Install approved composition roofing system. 7. Install metal roof vent with minimum 50 sq. In net free area ventilation. Total free area of ventilation must meet code requirements for attic ventilation. 8. Install cor-a-vent in-vent attic roof vent or approved equal. Block eave vents after installation. 9. Install all metal 24-gauge flashing components according to manufacturer’s recommendations including roof penetration flashing, roof to wall flashing, eave and rake flashings and w-valley flashing. 10. Install permanent fall arrest/restraint roof anchors and all other accessory items to complete the installation and maintenance of the roof in a safe and secure manner. 11. Install new fascia boards where there is any decay or rot that would prevent the exterior paint to be applied and warranted. Include painting of all fascia prior to installation of new gutters. (see section 1. 5 unit costs for details. ) 12. Install new 5” k-style aluminum gutters and 2”x3” aluminum downspouts to match existing locations. 13. Haul away and dispose of all debris and demolished materials. 14. Include painting all b-vent flashings, roof accessories and lead pipe flashings as needed. 15. Daily cleaning and final cleaning of all trash and debris. 16. Prevailing wage rates to be included. 17. Acceptable roofing products must meet these warranty requirements: contractor’s workmanship warranty for a period of two (2) years from final completion. Subcontractor’s labor and materials for a period of two (2) years from final completion. Roofing manufacturer’s warranty of 100% materials and labor for five (5) years without proration or reductions. Roofing manufacturer’s 40-year warranty for materials.
AvailableWork consists of Reroof Portions of the Building. Remove existing roof system and flashings down to the structural deck. Replace with new single-ply membrane roofing system with tapered insulation and flashings as indicated. Provide and Install new fall protection anchors and ladders and associated structural supports.
Posted Date
Apr 8, 2026
Due Date
May 6, 2026
Willagillespie Roof Replacement Project
Release: Apr 8, 2026
Close: May 6, 2026
Work consists of Reroof Portions of the Building. Remove existing roof system and flashings down to the structural deck. Replace with new single-ply membrane roofing system with tapered insulation and flashings as indicated. Provide and Install new fall protection anchors and ladders and associated structural supports.
AvailableRoof Replacement (big Cypress)
AvailablePasco County is soliciting proposals for roof replacement services at the Big Cypress location. The project is part of the county's ongoing maintenance and infrastructure improvements. Interested vendors must submit their bids through the designated procurement portal by the specified deadline in May 2026.
Posted Date
Apr 16, 2026
Due Date
May 11, 2026
Roof Replacement (big Cypress)
Release: Apr 16, 2026
Close: May 11, 2026
Pasco County is soliciting proposals for roof replacement services at the Big Cypress location. The project is part of the county's ongoing maintenance and infrastructure improvements. Interested vendors must submit their bids through the designated procurement portal by the specified deadline in May 2026.
AvailableTelecommunications building roof replacement.
Posted Date
May 3, 2026
Due Date
May 27, 2026
Telecommunications Building - Roof Replacement
Release: May 3, 2026
Close: May 27, 2026
Telecommunications building roof replacement.
AvailableExterior trim replacement, siding repair & repaint work.
Posted Date
Apr 10, 2026
Due Date
May 6, 2026
940 Brevard - Exterior Trim Replacement, Siding Repair & Repaint (RFP)
Release: Apr 10, 2026
Close: May 6, 2026
Exterior trim replacement, siding repair & repaint work.
AvailableWork consists of removal and replacement of vinyl siding, weather barrier, trim, and j-channel on 9 ranch-style single story homes and their respective sheds.
Posted Date
Apr 18, 2026
Due Date
May 12, 2026
Penobscot Nation - Siding Replacement Sandy Beach Lane 2026 Project
Release: Apr 18, 2026
Close: May 12, 2026
Work consists of removal and replacement of vinyl siding, weather barrier, trim, and j-channel on 9 ranch-style single story homes and their respective sheds.
AvailableIndefinite Delivery, Indefinite Quantity (IDIQ) contract for comprehensive roof inspection, repair, preventative maintenance, and replacement services for participating public agencies.
Posted Date
Apr 10, 2026
Due Date
May 21, 2026
Roof Repairs and Replacement Services — Inspection, Repair, Preventative Maintenance, and Roof Section Replacement (IDIQ) *REBID*
Release: Apr 10, 2026
Close: May 21, 2026
Indefinite Delivery, Indefinite Quantity (IDIQ) contract for comprehensive roof inspection, repair, preventative maintenance, and replacement services for participating public agencies.
AvailableMen's Gym Reroofing Project
AvailableMen's gym reroofing project.
Posted Date
Apr 15, 2026
Due Date
May 12, 2026
Men's Gym Reroofing Project
Release: Apr 15, 2026
Close: May 12, 2026
Men's gym reroofing project.
AvailableMen's Gym Reroofing Project
AvailableMen's gym reroofing project.
Posted Date
Apr 15, 2026
Due Date
May 12, 2026
Men's Gym Reroofing Project
Release: Apr 15, 2026
Close: May 12, 2026
Men's gym reroofing project.
AvailableReroofing of the Animal Control Building
Release: Apr 28, 2026
Close: May 20, 2026
Reroofing project.
AvailableGeneral Roofing Repair and Replacement Services.
Posted Date
Apr 25, 2026
Due Date
May 26, 2026
General Roofing Repair and Replacement Services
Release: Apr 25, 2026
Close: May 26, 2026
General Roofing Repair and Replacement Services.
AvailableRoofing restoration work at roof areas #3 and 4, remove gravel surface, clean and repair all defects in the existing roof system per roofing manufacturers requirements, install cold process, heavy-bodied, rubberized, fiber reinforced, fire-rated restoration treatment. Install new gravel. Install pre-finished aluminum metal wall panel installation work at roof areas #3 and 4 over existing masonry rising wall. Install pre-finished aluminum metal edge and fascia extender; roofing expansion joints, new pipe curb; lead flashing at vent stack(s); area divider(s); pipe / conduit supports on walkway pads and all associated work as indicated on the drawings. Additional low slope alternate bid areas are to be restored in a similar manner as the base bid. Note there is no metal panel installation on the alternate bid low slope roof areas. At alternate bid steep slope metal areas, clean and repair all defects in the existing roof system per roofing manufacturers requirements. Install synthetic liquid rubber membrane per roofing manufacturers requirements.
Posted Date
Apr 23, 2026
Due Date
May 20, 2026
Roof Restoration and Gym Wall Panels at Thomas Bowe Middle School
Release: Apr 23, 2026
Close: May 20, 2026
Roofing restoration work at roof areas #3 and 4, remove gravel surface, clean and repair all defects in the existing roof system per roofing manufacturers requirements, install cold process, heavy-bodied, rubberized, fiber reinforced, fire-rated restoration treatment. Install new gravel. Install pre-finished aluminum metal wall panel installation work at roof areas #3 and 4 over existing masonry rising wall. Install pre-finished aluminum metal edge and fascia extender; roofing expansion joints, new pipe curb; lead flashing at vent stack(s); area divider(s); pipe / conduit supports on walkway pads and all associated work as indicated on the drawings. Additional low slope alternate bid areas are to be restored in a similar manner as the base bid. Note there is no metal panel installation on the alternate bid low slope roof areas. At alternate bid steep slope metal areas, clean and repair all defects in the existing roof system per roofing manufacturers requirements. Install synthetic liquid rubber membrane per roofing manufacturers requirements.
AvailableWin More Roofing & Siding RFPs
Get AI-powered buying signals and real-time alerts for roofing & siding opportunities