Discover opportunities months before the RFP drops
Learn more →Discover roofing and siding RFP opportunities from state facilities departments, county building departments, and municipal maintenance agencies. Track solicitations for roof replacement, reroofing, siding installation, and facade restoration updated daily.
Project shall consist of existing single-ply roof membrane overlay replacement.
Posted Date
Jan 2, 2026
Due Date
Jan 20, 2026
Release: Jan 2, 2026
Close: Jan 20, 2026
Project shall consist of existing single-ply roof membrane overlay replacement.
AvailableRoofing Repair and Replacement Follow-On (R3F) Department of War (DoW) Installations.
Posted Date
Dec 19, 2025
Due Date
Feb 14, 2026
Release: Dec 19, 2025
Close: Feb 14, 2026
Roofing Repair and Replacement Follow-On (R3F) Department of War (DoW) Installations.
AvailableProcurement of a complete roof tear-off and installation of a new EPDM single-ply membrane roofing system for Lombardy Elementary School.
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
Procurement of a complete roof tear-off and installation of a new EPDM single-ply membrane roofing system for Lombardy Elementary School.
AvailableTaylor School District (MI) issued an RFP (RFP-TAY-260000000634-1) for district roof replacement projects in late 2025 covering multiple school roof replacement scopes. The solicitation was posted on 2025-12-19 with a response deadline in mid-January 2026 and is classified under roofing contractors (NAICS 238160). The buyer’s official posting is on Michigan’s SIGMA Advantage portal; however, a linkable opportunity detail or downloadable solicitation document was not publicly accessible and must be retrieved by searching the SIGMA portal using the Opportunity ID.
Posted Date
Dec 19, 2025
Due Date
Jan 14, 2026
Release: Dec 19, 2025
Close: Jan 14, 2026
Taylor School District (MI) issued an RFP (RFP-TAY-260000000634-1) for district roof replacement projects in late 2025 covering multiple school roof replacement scopes. The solicitation was posted on 2025-12-19 with a response deadline in mid-January 2026 and is classified under roofing contractors (NAICS 238160). The buyer’s official posting is on Michigan’s SIGMA Advantage portal; however, a linkable opportunity detail or downloadable solicitation document was not publicly accessible and must be retrieved by searching the SIGMA portal using the Opportunity ID.
AvailableRelease: Dec 11, 2025
Close: Jan 19, 2026
Roof and gutter replacement.
AvailableRelease: Dec 14, 2025
Close: Jan 8, 2026
Roof replacement in school.
Gazebo roof replacement.
Posted Date
Jan 4, 2026
Due Date
Jan 22, 2026
Release: Jan 4, 2026
Close: Jan 22, 2026
Gazebo roof replacement.
AvailableThis RFP is for the roofing replacement at Riverside Intermediate School, including removal of existing PVC roofing, installation of new flat and tapered insulation, EPDM membrane, coverboard, and perimeter metal edge fascia.
Posted Date
Jan 6, 2026
Due Date
Jan 22, 2026
Release: Jan 6, 2026
Close: Jan 22, 2026
This RFP is for the roofing replacement at Riverside Intermediate School, including removal of existing PVC roofing, installation of new flat and tapered insulation, EPDM membrane, coverboard, and perimeter metal edge fascia.
AvailableRoof replacement services - include, but are not limited to, removal of roofing down to the concrete deck, installation of vapor barrier as temporary roof, mount new tapered insulation, including cover board, installation of Fibertite 36 Mil KEE membrane roofing system, installation of flashings and accessories, and drainage installation.
Posted Date
Dec 10, 2025
Due Date
Jan 12, 2026
Release: Dec 10, 2025
Close: Jan 12, 2026
Roof replacement services - include, but are not limited to, removal of roofing down to the concrete deck, installation of vapor barrier as temporary roof, mount new tapered insulation, including cover board, installation of Fibertite 36 Mil KEE membrane roofing system, installation of flashings and accessories, and drainage installation.
AvailableRemove and properly dispose of the existing roof (primarily metal standing seam, some single ply). Perform structural and roof deck repair as necessary, and install new roof. The work consists of roof replacement at the specified roofs at the city public library. Scope includes on the defined roof areas, to the complete removal of the existing roofing down to the structural building framing, substrate preparation, vapor retarder, insulation, standing seam metal roof system and fully adhered single-ply roof system and specified component, new gutters and downspouts and all incidentals to complete the warrantable specified system assemblies.
Posted Date
Sep 25, 2025
Due Date
Jan 15, 2026
Release: Sep 25, 2025
Close: Jan 15, 2026
Remove and properly dispose of the existing roof (primarily metal standing seam, some single ply). Perform structural and roof deck repair as necessary, and install new roof. The work consists of roof replacement at the specified roofs at the city public library. Scope includes on the defined roof areas, to the complete removal of the existing roofing down to the structural building framing, substrate preparation, vapor retarder, insulation, standing seam metal roof system and fully adhered single-ply roof system and specified component, new gutters and downspouts and all incidentals to complete the warrantable specified system assemblies.
AvailableElementary school reroofing.
Posted Date
Dec 25, 2025
Due Date
Jan 27, 2026
Release: Dec 25, 2025
Close: Jan 27, 2026
Elementary school reroofing.
AvailableReplacement of high school roof.
Posted Date
Dec 17, 2025
Due Date
Jan 22, 2026
Release: Dec 17, 2025
Close: Jan 22, 2026
Replacement of high school roof.
AvailableThe scope of work includes, but is not limited to, removing existing 14,400 SF of EPDM roofing and insulation, removing two ventilators, and infilling open areas with roof panels. Install new insulation and EPDM roofing, as well as new flashing at vents and piping. Rework and install a new flashing tie-in to the existing west metal roof.
Posted Date
-
Due Date
Jan 27, 2026
Release: -
Close: Jan 27, 2026
The scope of work includes, but is not limited to, removing existing 14,400 SF of EPDM roofing and insulation, removing two ventilators, and infilling open areas with roof panels. Install new insulation and EPDM roofing, as well as new flashing at vents and piping. Rework and install a new flashing tie-in to the existing west metal roof.
AvailableWork includes roof replacement.
Posted Date
Dec 30, 2025
Due Date
Feb 12, 2026
Release: Dec 30, 2025
Close: Feb 12, 2026
Work includes roof replacement.
AvailableWork consists of fire station roof replacement, work includes removing the existing built-up roofing system on all low-slope roof areas and installing a complete new garland sbs modified bitumen roofing system, including all associated membranes, flashings, cover board, tapered transitions, sheet metal components, walk pads, and a new roof access hatch and curb. The work also includes maintaining and protecting in place existing rooftop elements such as the communication tower, guy wires, and pv panels. The contractor shall coordinate closely with the HVAC contractor responsible for replacing rooftop mechanical units, including removal and replacement of sleepers or curbs as required and providing all watertight flashing transitions for new HVAC equipment.
Posted Date
Dec 15, 2025
Due Date
Jan 20, 2026
Release: Dec 15, 2025
Close: Jan 20, 2026
Work consists of fire station roof replacement, work includes removing the existing built-up roofing system on all low-slope roof areas and installing a complete new garland sbs modified bitumen roofing system, including all associated membranes, flashings, cover board, tapered transitions, sheet metal components, walk pads, and a new roof access hatch and curb. The work also includes maintaining and protecting in place existing rooftop elements such as the communication tower, guy wires, and pv panels. The contractor shall coordinate closely with the HVAC contractor responsible for replacing rooftop mechanical units, including removal and replacement of sleepers or curbs as required and providing all watertight flashing transitions for new HVAC equipment.
AvailableBuilding C roof replacement at university.
Posted Date
Dec 12, 2025
Due Date
Jan 13, 2026
Release: Dec 12, 2025
Close: Jan 13, 2026
Building C roof replacement at university.
AvailableWork includes Roof Replacement at aschool.
Posted Date
Jan 5, 2026
Due Date
Feb 5, 2026
Release: Jan 5, 2026
Close: Feb 5, 2026
Work includes Roof Replacement at aschool.
AvailableThe St. Johns River Water Management District is soliciting bids (Invitation to Bid ITB-14621) for the complete replacement of the administration building roof and gutter system at its District Headquarters in Palatka, Florida. The scope includes removal and disposal of existing metal roofing, installation of a new standing-seam Galvalume roof system with new insulation, new aluminum box gutters and downspouts, a new lightning protection system, and replacement of one aluminum window assembly. Substantial completion is required within 90 calendar days, with final completion by August 14, 2026. Responses are due by January 20, 2026.
Posted Date
Dec 12, 2025
Due Date
Jan 20, 2026
Release: Dec 12, 2025
Close: Jan 20, 2026
The St. Johns River Water Management District is soliciting bids (Invitation to Bid ITB-14621) for the complete replacement of the administration building roof and gutter system at its District Headquarters in Palatka, Florida. The scope includes removal and disposal of existing metal roofing, installation of a new standing-seam Galvalume roof system with new insulation, new aluminum box gutters and downspouts, a new lightning protection system, and replacement of one aluminum window assembly. Substantial completion is required within 90 calendar days, with final completion by August 14, 2026. Responses are due by January 20, 2026.
AvailableShowroom facade preservation project and will include the following restoration activities to the showroom facade of the ACDAM: 1. Masonry restoration, focused on rehabilitation/replacement of damaged masonry components; 2. Lintel restoration, focused on rehabilitation/replacement of corroded or deteriorating lintels; and 3. Window and door restoration, focused on rehabilitation/replacement of exterior windows and doors.
Posted Date
Nov 18, 2025
Due Date
Jan 8, 2026
Release: Nov 18, 2025
Close: Jan 8, 2026
Showroom facade preservation project and will include the following restoration activities to the showroom facade of the ACDAM: 1. Masonry restoration, focused on rehabilitation/replacement of damaged masonry components; 2. Lintel restoration, focused on rehabilitation/replacement of corroded or deteriorating lintels; and 3. Window and door restoration, focused on rehabilitation/replacement of exterior windows and doors.
Fayetteville State University is soliciting statements of qualifications from licensed architectural/engineering firms for the Chesnutt Library Roof Replacement Project. The selected firm will provide design and construction administration services with experience in higher education facilities, metal roof systems, building enclosure restoration, and water intrusion remediation. Submissions are due by 5:00 p.m. ET on January 29, 2026.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Fayetteville State University is soliciting statements of qualifications from licensed architectural/engineering firms for the Chesnutt Library Roof Replacement Project. The selected firm will provide design and construction administration services with experience in higher education facilities, metal roof systems, building enclosure restoration, and water intrusion remediation. Submissions are due by 5:00 p.m. ET on January 29, 2026.
AvailableGet AI-powered buying signals and real-time alerts for roofing & siding opportunities